Document Outline
KARI proprietary
KARI proprietary
Part I. Introduction
1.1 Aircraft Electric Engine Development Project
1.2 Objective of RFP
1.3 Contract Concepts
1.4 Schedule of Contract
1.5 Terminology
Part II. General Instruction to Bidder
2.1 Purpose
2.2 Structure of the RFP
2.3 Qualification of Bidder
2.4 Submittal of Proposal
2.4.1 Proposal Documents
2.4.2 Number of Copies
2.4.3 Bid Closing Date
2.4.4 Method of Submittal
2.4.5 Point of Contact
2.4.6 Bid Bond
2.5 Bidding Schedule
2.6 Questions and Modifications
2.7 Acceptance/Rejection of Bids
2.8 Evaluation of Proposal
2.8.1 Evaluation Process
2.9 Contract
2.10 Language and Measurement Unit
2.11 Pricing Requirements
2.12 Confidentiality
2.13 Proprietary Rights
2.14 Withdrawal of Proposal
2.15 Property of Proposal
2.16 Expenses
2.17 Governing Law
2.18 Certificate and Government Approval
2.19 Arbitration
Part III. Technical Requirements for Contract
3.1 Project Information
3.2 Introduction
3.2.1 Conceptual design of a hybrid propulsion system
3.2.2 Electric Engine Nacelle
3.3 Scope of Work
Part IV. Statement of Work
4.1 Overview
4.2 General Description
4.3 Thermal Package Optimization & Cable/Pipe Routing Design
4.4 Schedule of Works
4.5 Kick-off and final meeting
4.6 Meeting room for kick-off and final meetings
4.7 Deliverable Items
Annex A. Suggested Proposal
Annex B. Terms and Conditions
A. Order Information: As per the Contractor’s proposal submitted to KARI dated TBD, 2023
B. Terms of Payment
C. Taxes
D. Deliverable Items (Document) and Intellectual Property Rights
E. Delivery term
F. Performance bond
G. Liquidated damages
H. Confidentiality
I. Point of Contact in KARI