REQUEST FOR PROPOSAL

THERMAL PACKAGE OPTIMIZATION & 

CABLE/PIPE ROUTING DESIGN FOR 

ENGINE NACELLE

March 22, 2023

Korea Aerospace Research Institute

169-84 Gwahak-ro, Yuseong-gu,

Daejeon, 34133, Republic of Korea


background image

KARI proprietary

The data/information contained in this document shall not be disclosed, disseminated or reproduced, in whole or in part,  

without the express prior written approval of KARI.

This page is intentionally left blank.


background image

i

Thermal Package Optimization and Cable/Pipe Routing Design for Engine Nacelle 

Request for Proposal, Table of Contents

Use or disclosure of the data contained on this sheet is subject to the restriction on the title page

Table of Contents

PART I. INTRODUCTION...................................................................................2

1.1

AIRCRAFT ELECTRIC ENGINE DEVELOPMENT PROJECT........................................................4

1.2

OBJECTIVE OF RFP....................................................................................................4

1.3

CONTRACT CONCEPTS................................................................................................4

1.4

SCHEDULE OF CONTRACT............................................................................................4

1.5

TERMINOLOGY......................................................................................................... 4

PART II. GENERAL INSTRUCTION TO BIDDER....................................................6

2.1

PURPOSE................................................................................................................8

2.2

STRUCTURE OF THE RFP.............................................................................................8

2.3

QUALIFICATION OF BIDDER.........................................................................................8

2.4

SUBMITTAL OF PROPOSAL...........................................................................................9

2.4.1 

Proposal Documents.......................................................................................9

2.4.2 

Number of Copies...........................................................................................9

2.4.3 

Bid Closing Date..............................................................................................9

2.4.4 

Method of Submittal.......................................................................................9

2.4.5 

Point of Contact............................................................................................10

2.4.6 

Bid Bond........................................................................................................11

2.5

BIDDING SCHEDULE.................................................................................................11

2.6

QUESTIONS AND MODIFICATIONS...............................................................................11

2.7

ACCEPTANCE/REJECTION OF BIDS...............................................................................11

2.8

EVALUATION OF PROPOSAL.......................................................................................12

2.8.1

Evaluation Process........................................................................................12

2.9

CONTRACT............................................................................................................12

2.10 LANGUAGE AND MEASUREMENT UNIT........................................................................12
2.11 PRICING REQUIREMENTS..........................................................................................13
2.12 CONFIDENTIALITY....................................................................................................14
2.13 PROPRIETARY RIGHTS..............................................................................................14
2.14 WITHDRAWAL OF PROPOSAL.....................................................................................14
2.15 PROPERTY OF PROPOSAL..........................................................................................14
2.16 EXPENSES..............................................................................................................14
2.17 GOVERNING LAW....................................................................................................14
2.18 CERTIFICATE AND GOVERNMENT APPROVAL..................................................................14
2.19 ARBITRATION.........................................................................................................15

PART III. TECHNICAL REQUIREMENTS FOR CONTRACT...................................17

3.1

PROJECT INFORMATION............................................................................................19

3.2

INTRODUCTION......................................................................................................19

3.2.1 Conceptual design of a hybrid propulsion system...................................................19
3.2.2 Electric Engine Nacelle.............................................................................................19

3.3

SCOPE OF WORK.................................................................................................... 20

PART IV. STATEMENT OF WORK....................................................................21

4.1

OVERVIEW............................................................................................................ 23

4.2

GENERAL DESCRIPTION............................................................................................23



background image

1

Thermal Package Optimization and Cable/Pipe Routing Design for Engine Nacelle 

Request for Proposal, Table of Contents

Use or disclosure of the data contained on this sheet is subject to the restriction on the title page

Part I. Introduction


background image

Page 2

Thermal Package Optimization and Cable/Pipe Routing Design for Engine Nacelle 

Request for Proposal, Part I

Use or disclosure of the data contained on this sheet is subject to the restriction on the title page

This page is intentionally left blank.


background image

Page 3

Thermal Package Optimization and Cable/Pipe Routing Design for Engine Nacelle 

Request for Proposal, Part I

Use or disclosure of the data contained on this sheet is subject to the restriction on the title page

1.1

Aircraft Electric Engine Development Project

Korea Aerospace Research Institute (hereinafter “KARI”), a government-funded research institute is 

responsible for the development of aircraft electric engine.

1.2

Objective of RFP

KARI is issuing this Request for Proposal (hereinafter “RFP”) to Bidders who are willing to collaborate 

with KARI in successfully performing the thermal package optimization and cable/pipe routing design 

for engine nacelle. This RFP document explains the procedures to be undertaken by Bidders seeking 

to respond to the RFP for related services. This RFP also details the requirements, terms, and 

conditions for the proposal and contract.

1.3

Contract Concepts

In the phase of the issuance of RFP, this RFP is written and issued by KARI. the contract will be made 

with one contractor who satisfies the scope of RFP with the experience and ability of research and 

submit the lowest bid price.
In   the   evaluation   and   contract   phases,   Bidder’s   Proposal   will   be   evaluated   by   the   evaluation 

committee according to the related rules.

1.4

Schedule of Contract 

2023. 4  [TBC]  : Completion of contract between KARI and bidder [TBC]
2023. 4  [TBC]  : Kick-off meeting [TBC]
2023. 7 [TBC]  : Interim presentation [TBC]
2023. 10 [TBC]  : Submission of final report [TBC]
2023. 11 [TBC]  : Final presentation [TBC]

1.5

Terminology

Unless otherwise specified elsewhere, the following terms as used herein shall have the meaning as 

assigned to them:

1.5.1

Bid means solicitation of KARI for the submittal of the Proposal in response to the RFP.

1.5.2

Bidder(s) means person(s) or corporation(s) who submits the Proposal in response to the 

RFP.

1.5.3

Contract  means a contract to be executed between KARI and Contractor for Thermal 


background image

Page 4

Thermal Package Optimization and Cable/Pipe Routing Design for Engine Nacelle 

Request for Proposal, Part I

Use or disclosure of the data contained on this sheet is subject to the restriction on the title page

Package Optimization and Cable/Pipe Routing Design for Engine Nacelle pursuant to the RFP.

1.5.4

Contractor means the party who has entered into the Contract.

1.5.5

KARI means Korea Aerospace Research Institute as designated by the government of the 

Republic of Korea (“Korea”) for the issuance of the RFP.

1.5.6

Proposal means any set of documents effectively submitted by a Bidder in response to this 

RFP.

1.5.7

RFP or Request for Proposal means all documents, including those attached or incorporated 

by reference, used for soliciting Proposal as set forth in Section 2.2 (Structure of the RFP) of 

Part II of the RFP.

1.5.8

Successful Bidder means the Bidder with the lowest Bid Price in the price evaluation, after 
having passed technical evaluation, who is expected to formalize a Contract in Annex B 
hereof. 

1.5.9

TBD means “To Be Determined” by KARI before the award of the Contract.

1.5.10 TBC  means  “To   Be   Confirmed”  mutually   by   KARI   and   Bidder   as   to   any   requirements 

suggested.


background image

5

Thermal Package Optimization and Cable/Pipe Routing Design for Engine Nacelle 

Request for Proposal, Table of Contents

Use or disclosure of the data contained on this sheet is subject to the restriction on the title page

Part II. General Instruction to Bidder


background image

Page 6

Thermal Package Optimization and Cable/Pipe Routing Design for Engine Nacelle 

Request for Proposal, Part II

Use or disclosure of the data contained on this sheet is subject to the restriction on the title page

This page is intentionally left blank.


background image

Page 7

Thermal Package Optimization and Cable/Pipe Routing Design for Engine Nacelle 

Request for Proposal, Part II

Use or disclosure of the data contained on this sheet is subject to the restriction on the title page

2.1

Purpose 

This section describes the requirements for preparing and submitting the Bidder’s Proposals in 

response to this RFP.

2.2

Structure of the RFP 

This RFP consists of the following Parts:

Part I

Introduction

Part II 

General Instruction to Bidders

Part III

Technical Requirements for Contract

Part IV

Statement of Work

Annex A. 

Suggested Proposal

Annex B.

Terms and Conditions

Part I provides introduction to this RFP document.

Part II illustrates general instructions for the preparation and submission of the Proposal, and 

principles of evaluation of the Proposal.

Part III outlines the key performance for thermal package optimization and cable/pipe routing design 

for engine nacelle.

Part IV states the Statement of Work, which shall be provided by the Contractor to KARI during the 

entire course of Contract. This Statement of Work will be the baseline for the Contract.

Annex A outlines the Bidder how to develop the Proposal.

Annex B presents the baseline of the general terms and conditions, which is the basic guideline for the 

Bidder to prepare the Proposals and for KARI, and the Contractor to form the Contract.

2.3

Qualification of Bidder

2.3.1

Bidder   shall   have  demonstrated   track   records   in  thermal   package   optimization   and 

cable/pipe routing design for engine nacelle.

2.3.2 

The qualifying statement for the above  requirements and support materials shall be 

provided in the Proposal.


background image

Page 8

Thermal Package Optimization and Cable/Pipe Routing Design for Engine Nacelle 

Request for Proposal, Part II

Use or disclosure of the data contained on this sheet is subject to the restriction on the title page

2.4

Submittal of Proposal

2.4.1 

Proposal Documents

Bidder shall submit their Proposals in the following four (4) Volumes as presented in Annex A, 

Suggested Proposal, with any other required certificate and evidences under the RFP.

Volume 1.

Capability and Experience

Volume 2.

Technical Proposal

Volume 3.

Statement of Work Proposal

Volume 4.

Price Proposal (to be sealed in a separate envelope)

The detailed instructions for each Volume can be founded in the Suggested Proposal given in Annex A 

of this RFP. It is recommended that Bidders submit the Proposals in the same sequence as enlisted in 

the Suggested Proposal.

A4 size paper shall be used. If the larger paper should be used for the explanation, foldout can be 

used.

2.4.2 

Number of Copies

Bidders shall submit one (1) original hardcopy marked as “ORIGINAL COPY” on the cover and six (6) 

duplicate hardcopies, without Volume 4 Price Proposal. For Volume 4 Price Proposal, only one (1) 

hardcopy shall be submitted in a separate envelope. In addition, the electronic files of the Proposal in 

Microsoft Office Word for Windows and Portable Document Format (PDF) shall be submitted (except 

for Volume 4 Price Proposal). In order to substantiate a Proposal, all relevant data shall be submitted 

as attachments.

In case of any discrepancy between the original copy and electronic file or the other hardcopies, the 

original copy, which is marked as “ORIGINAL COPY” on the cover, shall prevail.

2.4.3 

Bid Closing Date

The closing date and time for the Proposal is specified in the notice of this Bid (“Bid Closing Date”). If 
any part of the Proposal or the bid bond as required under this RFP is received by KARI after the 
stipulated closing time, the entire Proposal will be rejected.

2.4.4 

Method of Submittal

The Proposal shall be hand-carried or delivered using a registered mail service to the following KARI 


background image

Page 9

Thermal Package Optimization and Cable/Pipe Routing Design for Engine Nacelle 

Request for Proposal, Part II

Use or disclosure of the data contained on this sheet is subject to the restriction on the title page

personnel or his designee: 

Mr. Won-Suk LEE
Overseas Contracts Office
Korea Aerospace Research Institute
169-84 Gwahak-ro, Yuseong-gu
Daejeon, 34133, Korea
Tel) +82-42-860-2406
e-mail) wsl@kari.re.kr

The communication between KARI and Bidder for contractual matters (Terms and Conditions) shall be 

controlled through the following designee: 

Ms. Ji-Young LIM
Overseas Contract Office
Korea Aerospace Research Institute
169-84 Gwahak-ro, Yuseong-gu
Daejeon, 34133, Korea
Tel) +82-42-860-2615
e-mail) jylim1@kari.re.kr

2.4.5 

Point of Contact

Besides the Proposal submission, the point of contact for all communications for technical matters 

shall be 

Dr. Jae-Sung HUH
Aeropropulsion Research Division
Korea Aerospace Research Institute
169-84 Gwahak-ro, Yuseong-gu
Daejeon, 34133, Korea
Tel) +82-42-860-2831
e-mail) jshuh@kari.re.kr

with C.C to

Dr. Sangook Jun
Aeropropulsion Research Division


background image

Page 10

Thermal Package Optimization and Cable/Pipe Routing Design for Engine Nacelle 

Request for Proposal, Part II

Use or disclosure of the data contained on this sheet is subject to the restriction on the title page

Korea Aerospace Research Institute
169-84 Gwahak-ro, Yuseong-gu
Daejeon, 34133, Korea
Tel) +82-42-860-2237
e-mail) sangookjun@kari.re.kr

Bidder shall specify its single point of contact in the Volume I of its Proposal, “Capability and 

Experience”, for KARI to communicate in connection with the RFP, Proposal and the subsequent 

evaluation. Bidder’s information on the point of contact shall include the name, title/position, 

telephone no., and e-mail address.

2.4.6 

Bid Bond

Bidder shall establish a bid bond in accordance with the bid notice for this RFP.

2.5

Bidding Schedule

2.5.1

The following schedule is a tentative milestone for the eventual Contract and may be 

changed at KARI’s sole discretion: 

[1]

Bid Notice and RFP Release: T0 

[2]

Bid Closing Date: T1 = T0 + 10 calendar days

[3]

Evaluation of Proposal: T2 = T1 + 10 calendar days

[4]

Expected Contract Date: T3 = T2 + 10 calendar days 

2.6

Questions and Modifications

2.6.1

Any questions as to the intent and clarity of the RFP may be directed to KARI’s point of 

contact as specified in Section 2.4.6 of the Part II of this RFP by e-mail or letter, and shal  be 

received no later than five (5) days before the Bid Closing Date.

2.6.2 

KARI   may   ask   a   Bidder   in   writing   for   clarifications,   amendments,   revisions,   or 

supplementation of the Proposal and any other documents submitted by Bidder at any 

time before the execution of the Contract. KARI may also ask Bidder to submit and supply 

additional information or documents necessary for evaluation of the Proposal.

2.6.3

After the Bid Closing Date, Bidder shall not amend, modify, or supplement the Proposal, or 

submit any other documents to KARI, except with KARI's written request. 

2.7

Acceptance/Rejection of Bids


background image

Page 11

Thermal Package Optimization and Cable/Pipe Routing Design for Engine Nacelle 

Request for Proposal, Part II

Use or disclosure of the data contained on this sheet is subject to the restriction on the title page

KARI reserves the right to accept or reject any Bidding, and to amend the Bidding process and reject all 

Biddings at any time prior to the award of the Contract without thereby incurring any liability to the 

affected Bidder, and KARI is not under any obligation to inform the affected Bidder of the ground for 

its action.

2.8

Evaluation of Proposal

The evaluation of the Proposals will be made by the evaluation committee, which will be acting 

through KARI.

The following evaluation process is for information only, and the evaluation committee reserves the 

right to modify the evaluation process and criteria without any prior notification to Bidders.

2.8.1

Evaluation Process

2.8.1.1

During the Bid evaluation, KARI may send to Bidders a set of questions for clarification and 

request any supplement to the Proposals and the evaluation will be made based on the 

Proposal and the answers and the supplement received from Bidders. The Proposal which 

is improvable, unrealistic, unreliable or based on vague presumptions shall not get good 

scores. 

 
2.8.1.2

The evaluation shall be in two (2) stages: the technical evaluation and the price evaluation. 

First, technical proposals shall be evaluated by the evaluation committee in order to select 

the Bidders technically qualified to perform the work under this RFP. The total score for 

technical proposal is one hundred (100) points and the Bidders with eighty (80) points or 

higher shall be considered in the next stage of price evaluation. In the second stage, the 

Bidder with the lowest bid price which shall be  less than or equal to KARI’s estimated 

budget will be selected as the Successful Bidder.

2.8.1.3

Subject to an evaluation of the Proposal, the evaluation committee will judge whether 

Bidder provides Proposal enough to meet the requirements in this RFP.

2.8.1.4

The result of evaluation is at the proposal evaluation committee’s discretion based on 

evaluation   process   and   Bidders  shall   not   raise   any   objection   regarding   the   proposal 

evaluation committee’s decision thereupon.

2.9

Contract

2.9.1 

The Terms and Conditions as presented in Annex B of this RFP is the baseline requirement 

for the Contract with the Successful Bidder, and will be the basis of the Contract.

2.10 Language and Measurement Unit


background image

Page 12

Thermal Package Optimization and Cable/Pipe Routing Design for Engine Nacelle 

Request for Proposal, Part II

Use or disclosure of the data contained on this sheet is subject to the restriction on the title page

2.10.1

The Proposal and any documents submitted to KARI under the RFP and communication and 

the Contract language shall be in English.

2.10.2

"Système   Internationale"   (SI,   hereafter)   units   shall   be   used   for   measurements   and 

quantities in the Proposal and all the accompanying documents. However, British unit of 

power and weight could be used as a complementary unit. In this case, SI unit comes first 

and British unit shall be put in parentheses.

2.11 Pricing Requirements

2.11.1

Any price or rate for Contract shall be firm and fixed, not subject to change for a price 

escalation for the entire period of the Contract. Therefore, the proposed price shall reflect 

possible fluctuations in labor costs, material prices and others. The Contractor shall not 

demand to reflect the fluctuation on the Contract. 

2.11.2

Any kinds of taxes and duties arising in connection with Bidder’s work under this RFP and 

under the eventual Contract shall be Bidder’s responsibility, except for the customs duties 

and VAT levied in Korea and the price shal  be inclusive of any cost or charge incurred due to 
delivery of any hardware, software, equipment, spare parts, 

and documentation to KARI or its 

designated point of delivery.

2.11.3

The currency quoted in the Price Proposal shall be expressed in the same currency used in 

KARI’s bid notice for this RFP. However, other currency may be allowed. If Bidder’s 

proposed price is in a currency other than the currency of the estimated budget specified in 

KARI’s bid notice of this RFP, then for the conversion of the Bidder’s proposed price, the 1st 

basic exchange rate announced by of KEB Hana Bank on the price evaluation date shall be 

used.

2.11.4

Likewise, the currency of the Contract may be Contractor’s national currency within the 

value of Bidder’s bid price, in which case, the 1st basic exchange rate announced by KEB 

Hana Bank on price evaluation date shall be applied for the exchange rate for currency 

change.

2.11.5

Bidder shall include all cost items to cover the all activities in the Proposal and itemize 

requested items. 

2.11.6

Korean corporation tax (herein referred to as ‘Applicable Tax’) in Korea will be withheld 

under the Contract. Therefore, KARI shall withhold the Applicable Tax and pay to the 

relevant Korean taxing authority on behalf of Contractor in accordance with applicable 

Korean law and international tax treaty between Korea and Bidder’s country. After paying 

the Applicable Tax to the relevant Korean taxing authority, KARI will convey the certificate of 

the withholding Tax to Contractor within ninety (90) days of such payment. 


background image

Page 13

Thermal Package Optimization and Cable/Pipe Routing Design for Engine Nacelle 

Request for Proposal, Part II

Use or disclosure of the data contained on this sheet is subject to the restriction on the title page

2.12 Confidentiality

2.12.1

There   shall   be   no   news   releases,   public   announcements,   denials   or   confirmation   in 

connection with this RFP or contract award without prior written approval of KARI. Also, 

Bidder shall not disclose any part of this RFP to third parties without prior written approval 

of KARI.

2.12.2

All documentation submitted in response to this RFP shall be marked "COMMERCIALS-IN-

CONFIDENCE" on the first page of each document. All elements of the RFP shall be kept 

confidential, and shall not be intentionally disclosed by Bidder to third parties.

2.13 Proprietary Rights

KARI shall have the irrevocable, royalty-free, and exclusive right to use any data and the results  of 

thermal package optimization and cable/pipe routing design for engine nacelle.

2.14 Withdrawal of Proposal

Bidder may withdraw its Proposal at any time before the Bid Closing Date. Withdrawal shall be made 

in writing, and shall be received by KARI before the Bid Closing Date.

2.15 Property of Proposal

All documents submitted in response to the RFP shall become the property of KARI and will be 

retained by KARI.

2.16 Expenses

Expenses incurred by Bidder in connection with the preparation, submittal, and any subsequent 

clarification or any other activities for this Bidding are for their own account and will not be 

reimbursed by KARI.

2.17 Governing Law

This RFP and the Contract shall be construed in accordance with and governed by the laws of the 

Republic of Korea.

2.18 Certificate and Government Approval 

Bidders shall receive the government approval and certificates (e.g. export licenses) in relevant 

countries, necessary for Bidder's work for this Proposal. Bidder's ability and plan to get such approval 


background image

Page 14

Thermal Package Optimization and Cable/Pipe Routing Design for Engine Nacelle 

Request for Proposal, Part II

Use or disclosure of the data contained on this sheet is subject to the restriction on the title page

and certificates shall be submitted to KARI, together with any appropriate assurance letters from the 

relevant governments, in the proposal.

2.19 Arbitration

Any disputes arising out of or in connection with this RFP and Contract shall be finally settled by 
arbitration in Seoul, Korea, under the in accordance with the International Rules of the Korean 
Commercial Arbitration Board.


background image

15

Thermal Package Optimization and Cable/Pipe Routing Design for Engine Nacelle 

Request for Proposal, Table of Contents

Use or disclosure of the data contained on this sheet is subject to the restriction on the title page

Part III. Technical Requirements for Contract


background image

Page 16

Thermal Package Optimization and Cable/Pipe Routing Design for Engine Nacelle 

Request for Proposal, Part III

Use or disclosure of the data contained on this sheet is subject to the restriction on the title page

This page is intentionally left blank.


background image

Page 17

Thermal Package Optimization and Cable/Pipe Routing Design for Engine Nacelle 

Request for Proposal, Part III

Use or disclosure of the data contained on this sheet is subject to the restriction on the title page

3.1

Project Information

A Hybrid Electric Propulsion (HEP) system development project launched in 2021 is a basic technology 

R&D project which is led by Korea Aerospace Research Institute and funded by the ROK government. 

This project was initiated by the needs of adopting a gas turbine engine based-hybrid electric 

propulsion system for a long endurance and high payload eVTOL (e-Vertical Take-Off and Landing). All 

electric VTOL is known as to have limitations of payload and range due to restricted energy density of 

Li-Ion battery. The goal of this project covers to establish an optimal design of the hybrid electric 

propulsion system and to do the HEP system performance test at a newly constructed ground test 

facility. The HEP system has many components such as a turboshaft engine, a generator, a rectifier, 

several battery packs, motors, inverters, heat exchangers, and etc. It requires the layout design for 

effective and compact package and simultaneously electrical/mechanical routing design such as wire 

harness or pipeline for cooling. Therefore, this technical project will cover the packaging optimization 

and the cable/pipe routing design of an engine nacelle. 

3.2

Introduction

3.2.1 Conceptual design of a hybrid propulsion system

A schematic design of a series hybrid propulsion system is shown in Fig. 1, and in general, the system 

features a couple of cruise propellers (or prop-rotors) and several lift prop-rotors. Each cruise 

propeller or lift prop-rotor connects to an electric motor and an inverter which are installed in an 

electric engine nacelle with accessary components for thermal management system and tilting 

mechanism as shown in Fig. 2. 

Figure 1. Schematic of HEP system

3.2.2 Electric Engine Nacelle

Various components such as a motor, inverter, heat exchanger, pump, fluid tank and fan are installed 

inside the engine nacelle. It is important to package them compactly in a limited space, considering 

their shapes and sizes. Additionally, during design, performance degradation due to heat generation 

of each component and electrical/mechanical connection between components must be considered.


background image

Page 18

Thermal Package Optimization and Cable/Pipe Routing Design for Engine Nacelle 

Request for Proposal, Part III

Use or disclosure of the data contained on this sheet is subject to the restriction on the title page

Figure 2. Example of electric engine nacelles

Figure 3. Example of connecting between components

3.3

Scope of Work 

Contractor shall perform the following works under the Contract with KARI and please refer to the 

PART IV “Statement of Work” for more detailed performance. 

 Package for electric engine nacelle;

 Conduction of the packaging design for compactness
 Consideration   for   the   thermal   effect   of   components   and   the   electrical/mechanical 

connection

 Simultaneous conduction of the packaging and routing design


background image

19

Thermal Package Optimization and Cable/Pipe Routing Design for Engine Nacelle 

Request for Proposal, Table of Contents

Use or disclosure of the data contained on this sheet is subject to the restriction on the title page

Part IV. Statement of Work


background image

Page 20

Thermal Package Optimization and Cable/Pipe Routing Design for Engine Nacelle 

Request for Proposal, Part IV

Use or disclosure of the data contained on this sheet is subject to the restriction on the title page

This page is intentionally left blank.


background image

Page 21

Thermal Package Optimization and Cable/Pipe Routing Design for Engine Nacelle 

Request for Proposal, Part IV

Use or disclosure of the data contained on this sheet is subject to the restriction on the title page

4.1

Overview 

This section defines the work to be performed by the Contractor, including the provision of reports 

and data for thermal package optimization and cable/pipe routing design for engine nacelle.  The 

contents, which will be included in a contract document, will be determined based on this RFP and 

the Contractor's Proposal.

4.2

General Description

The goal of this project is to define the enhanced mathematical model and formulation for thermal 

packaging optimization and cable/pipe routing design based on the KARI’s request, and to solve the 

optimization problem with advanced in-house code that the Contractor has. Finally, the optimized 

geometry and the next work scope shall be proposed. 

4.3

Thermal Package Optimization & Cable/Pipe Routing Design

4.3.1

KARI will provide the detailed geometry of the electric engine nacelle and all components in 

it, which could include a motor, inverters, a heat exchanger, at least two water pumps, a 

water tank, a cooling fan, and etc., and will also give basic information from which the 

Contractor can obtain thermal effects of them. 

4.3.2

The Contractor should consider the routing problem of the wire harness and pipeline for 

cooling.

- The electrical & mechanical inlet/outlet positions of each component are determined in 

discussion with KARI.

-   The   routing   design   can   use   the   open   source   such   as   Dijkstra   or   A*   algorithm,   and 

concurrently or sequentially perform with the packaging design.

-   High   voltage   wire   harnesses   and   cooling   lines   have   a   circular   cross-section   and   the 

minimum bending radius. These values will be provided by KARI.

- The envelope of nacelle designed in KARI should be used for more realistic results. 
- Not only 1:1 connection between components, but also 1:n connection shall be considered.
- The position and size of the brackets to fix the components and routing must also be 

considered.

4.3.3

The Contractor should consider the thermal effect as follows during packaging design. 

- The nacelle has the intake and exit, which the external air flows into and out of it.
- A cooling fan is installed inside the nacelle to supply the external air to the heat exchanger 

(forced convection).

- The motor and inverter have the water cooling device, and the coolant flows in the order 

of the inverter and the motor. The hot coolant from the motor is cooled again through the 


background image

Page 22

Thermal Package Optimization and Cable/Pipe Routing Design for Engine Nacelle 

Request for Proposal, Part IV

Use or disclosure of the data contained on this sheet is subject to the restriction on the title page

heat exchanger, and then supplied to the inverter.

- The   thermal   model,   which   should   consider   forced   convection   effect,   for   packaging 

optimization should be developed and verified.

4.3.4

The Contractor shall generate a detailed model, which can also describe the interface with 

other components, of all components in the electric engine nacelle.

4.3.5

The Contractor shall define the enhanced mathematical model/formulation for thermal 

packaging optimization which can describe the compact layout of all components and 

thermal effects in the nacelle envelope and shall discuss it with KARI.

4.3.6

If necessary, the Contractor shall customize the in-house code that the Contractor has been 

developing, and then solve the packaging optimization formulation with its own code.

4.3.7

The Contractor shall provide the interim optimized result, and shall suggest the full thermal 

packaging optimization problem as next research scope.

4.4

Schedule of Works

Time*

Event

Within one week after 

contract

KARI provide document for design of an electric 

engine nacelle and geometry of battery cell

April 2023

Kick off meeting

One week after optimization 

formulation

Interim presentation

One week before final 

meeting

Submission of final report

End of Nov., 2023

Final presentation

15st December 2023

End of Contract

  *) Earlier is better

4.4.1

Kick off meeting shall be performed at the  Contractor site but it can be changed due to 

COVID-19. (exact date will be determined later)

4.4.2

Final meeting shall be held at the KARI. (exact date and location will be fixed later)

4.5

Kick-off and final meeting

4.5.1

The Contractor shall prepare for kick off and final meeting as stated in 4.5.


background image

Page 23

Thermal Package Optimization and Cable/Pipe Routing Design for Engine Nacelle 

Request for Proposal, Part IV

Use or disclosure of the data contained on this sheet is subject to the restriction on the title page

4.5.2

To leave an evidence for kick-off and final meetings, lecture materials presented during kick-

off meeting and final meeting shall be provided to KARI in electronic file format.

4.5.3

If sensitive information is included, it should be removed and provided to KARI.

4.6

Meeting room for kick-off and final meetings

4.6.1

A meeting room shall be prepared by Contractor for kick-off meeting at Contractor location.

4.6.2

The meeting room shall be equipped with free WIFI. 

4.7

Deliverable Items

The following items written in English should be submitted to KARI. 

(a) The optimization report and the plan; and
(b) Final report; and
(c) Other materials relevant for the performance of Contract such as presentation slides.

For late delivery of the final report, the liquidated damages for delay shall apply.


background image

Page 24

Thermal Package Optimization and Cable/Pipe Routing Design for Engine Nacelle 

Request for Proposal, Part IV

Use or disclosure of the data contained on this sheet is subject to the restriction on the title page

This page is intentionally left blank.


background image

25

Thermal Package Optimization and Cable/Pipe Routing Design for Engine Nacelle 

Request for Proposal, Table of Contents

Use or disclosure of the data contained on this sheet is subject to the restriction on the title page

Annex A. Suggested Proposal


background image

Page 26

Thermal Package Optimization and Cable/Pipe Routing Design for Engine Nacelle 

Request for Proposal, Annex A

Use or disclosure of the data contained on this sheet is subject to the restriction on the title page

This page is intentionally left blank.


background image

Page 27

Thermal Package Optimization and Cable/Pipe Routing Design for Engine Nacelle 

Request for Proposal, Annex A

Use or disclosure of the data contained on this sheet is subject to the restriction on the title page

1. Volume 1 : CAPABILITY AND EXPERIENCE

This volume shall describe Contractor's introduction and technical capability. The facilities and tools of 

the Bidder related to the development experience for thermal package optimization and cable/pipe 

routing design for engine nacelle  should be included.  Bidder shall describe current or past work 

similar to this RFP, which is being implemented or has been done by Bidder.

2. Volume 2 : TECHNICAL PROPOSAL

Bidder shall describe technical information, methodology, analysis, performance, and etc. to comply 

with RFP requirements. Bidder shall describe this technical proposal with as many illustrations as 

possible to make it clear. 

3. Volume 3 : STATEMENT OF WORK PROPOSAL

Bidder shall submit Statement of Work proposal in this volume. In this volume, Bidder shall describe 

work scope of the Bidder in detail including the respective plan. 

4. Volume 4 : PRICE PROPOSAL

Bidder shall submit Price Proposal in this volume. In this volume, Bidder shall provide the price 

breakdown of the price proposed by the Bidder in detail. And Bidder shall seal and submit this Price 

Proposal in separate. 


background image

Page 28

Thermal Package Optimization and Cable/Pipe Routing Design for Engine Nacelle 

Request for Proposal, Annex A

Use or disclosure of the data contained on this sheet is subject to the restriction on the title page

This page is intentionally left blank.


background image

29

Thermal Package Optimization and Cable/Pipe Routing Design for Engine Nacelle 

Request for Proposal, Table of Contents

Use or disclosure of the data contained on this sheet is subject to the restriction on the title page

Annex B. Terms and Conditions


background image

Page 30

Thermal Package Optimization and Cable/Pipe Routing Design for Engine Nacelle 

Request for Proposal, Annex B

Use or disclosure of the data contained on this sheet is subject to the restriction on the title page

This page is intentionally left blank.


background image

169-84 Gwahak-ro, Yuseong-gu, Daejeon, 34133, Republic of Korea
Telephone: +82-42-860-2406  Fax : +82-42-879-4370

Page 31

Thermal Package Optimization and Cable/Pipe Routing Design for Engine Nacelle 

Request for Proposal, Annex B

Use or disclosure of the data contained on this sheet is subject to the restriction on the title page

[TBD], 2023

[Name]
[Title]

[Contractor name]
[Address]

Tel: [TBD] 
e-mail: [TBD]

Subject: Purchase Order (“PO”) No. KARI-23-

 

 [ TBD

 

 ]  for 

 

Thermal Package Optimization and Cable/Pipe

 

 

Routing Design for Engine Nacelle

Dear [TBD],

Korea Aerospace Research Institute (hereinafter “KARI”) hereby places an order with [Contractor] 
(hereinafter “Contractor”) for following service in accordance with Attachment B “Statement of 
Work” based on the terms and conditions below. Please provide your acknowledgement by signature 
after receipt of the PO with KARI’s signature, and send us by e-mail the fully signed PO and proceed 
the work at your earliest convenience. 

A. Order Information: As per the Contractor’s proposal submitted to KARI dated TBD, 2023

- Total Price: KRW [ TBD

 

 ]  (firm and fixed; Korean Value-Added Tax (VAT) not included)

- Item:   Thermal   Package   Optimization   and   Cable/Pipe   Routing   Design   for   Engine   Nacelle 

(hereinafter referred to as “the Task”) in accordance with Attachment B “Statement of Work”.

Description

Price (KRW)

Task

Thermal Package Optimization and Cable/Pipe Routing Design for 

Engine Nacelle in accordance with Attachments A and B 

[ TBD

 

 ] 

Total Price (firm and fixed)

[ TBD

 

 ] 

B. Terms of Payment 

No.

Milestone

Payment Due date

Price (KRW) Percentage 

(%)

1

P-Bond (Section F) + Kick-off 

meeting

Milestone 

completion + 30 

days

[ TBD

 

 ] 

30

2

Receipt of Final Report

Receipt of Design 

Report + 30 days

[ TBD

 

 ] 

70

Total Price (firm and fixed)

[TBD]

100

  * EDC means the Effective Date of Contract on which both Parties have duly signed this PO.
- The payment shall be made by wire transfer to the bank account below as designated by 

Contractor, within thirty (30) days after receipt of payment invoice.

http://www.kari.re.kr


background image

169-84 Gwahak-ro, Yuseong-gu, Daejeon, 34133, Republic of Korea
Telephone: +82-42-860-2406  Fax : +82-42-879-4370

Page 32

Thermal Package Optimization and Cable/Pipe Routing Design for Engine Nacelle 

Request for Proposal, Annex B

Use or disclosure of the data contained on this sheet is subject to the restriction on the title page

- All banking charges incurred in Korea shall be borne by KARI, and those charges incurred 

outside of Korea shall be borne by Contractor. 

- Bank account information for payment to Contractor

Beneficiary‘s bank including branch name and address
SWIFT/BIC/Routing No./Transit No./ABA No., etc.
Beneficiary‘s Name
Account Number/IBAN

C. Taxes

- Korean VAT is not included in Contract Price and shall be the responsibility of KARI.
- Unless it is proved that Contract Price under this PO is not taxable in Korea as Korean 

corporation tax (herein referred to as ‘Applicable Tax’), such tax will be withheld by KARI and 
KARI shall pay to the relevant Korean taxing authority on behalf of Contractor as required in 
accordance   with   the   applicable   Korean   law   and   international   tax   treaty   between   the 
governments of Korea and [ TBD

 

 ] . In such case, KARI shall forward the certificate for payment of 

the withheld tax to Contractor within ninety (90) days of such payment. 

- KARI shall be responsible for customs duties and VAT on the Deliverable Items levied by Korean 

tax authority. 

D. Deliverable Items (Document) and Intellectual Property Rights

- The list of Deliverable Items and due dates for each Deliverable Item are as set forth in 

Attachment B “Statement of Work”.

- The Deliverable Items shall be the property of KARI.
- KARI shall have licence to use any data included in the Deliverable Items necessary for the 

purpose of this PO. 

E. Delivery term 

- The Deliverable Item shall be provided to the following KARI persons by e-mail;

Dr. Jae-Sung HUH (

 

 jshuh@kari.re.kr

 

 ), 

   and Dr. 

 

Sangook Jun

 

  (  sangookjun@kari.re.kr)

 

 . 

- It is agreed by the Parties that Contractor’s failure to obtain the export licence required for the 

Task from the any relevant government within one (1) month after EDC constitutes a failure of 
performance under Section F “Performance bond” below.

F. Performance bond 

- Contractor shall establish a performance bond in favor of KARI in the value of ten percent (10 

%) of the Total Price, in the form of an irrevocable and unconditional standby letter of credit or 
bank guarantee available by KARI’s draft at sight, or shall deposit the amount equivalent to ten 
percent (10 %) of the Total Price to the following account as security for performance.

http://www.kari.re.kr


background image

169-84 Gwahak-ro, Yuseong-gu, Daejeon, 34133, Republic of Korea
Telephone: +82-42-860-2406  Fax : +82-42-879-4370

Page 33

Thermal Package Optimization and Cable/Pipe Routing Design for Engine Nacelle 

Request for Proposal, Annex B

Use or disclosure of the data contained on this sheet is subject to the restriction on the title page

Beneficiary‘s   bank 
including address

Woori Bank, Daejeon Banking Center, located at 1495, Doonsan-
dong, Yusung-gu, Dajeon, Republic of Korea

SWIFT Code

HVBKKR SEXXX

Beneficiary‘s Name

Korea Aerospace Research Institute

Account Number

1081-600-247322

- If Contractor fails in performance of this Contract, including failure to obtain any export licence 

required for the purpose of this Contract, the performance bond will be confiscated by KARI as 
liquidated damages. In case of a letter of credit, the bond shall be available by KARI’s draft at 
sight without any further requirements other than KARI’s presentation of the statement that: 
there was a default of the Contractor in the performance of the Contract.

- Otherwise, the performance bond will be released promptly at the remittance of final payment 

by KARI without interest.

G. Liquidated damages 

- Liquidated damages to be applied for late delivery of the Deliverable Items in accordance with 

Attachment B “Statement of Work” at the rate of zero point one two five percent (0.125%) of 
Total Price per day, up to thirty percent (30%) of Total Price in maximum.

H. Confidentiality 

- Contractor shall not, in any manner, advertise, publish or release any information related to this 

Purchase Order or the work performed or to be performed hereunder without prior approval of 
KARI.

I. Point of Contact in KARI

Contractual Matters

Technical Matters

Name : Ms. Ji-Young Lim

Name : Dr. Sangook JUN

Tel :   +82-42-860-2615 

Tel :   +82-42-860-2237

e-mail : jylim1@kari.re.kr 

e-mail : sangookjun@kari.re.kr

Thank you in advance for your cooperation. 

Sincerely yours, 

cc 

Mr. Won-Suk LEE

Attachment A. “Technical Requirement”
Attachment B. “Statement of Work”

http://www.kari.re.kr

Korea Aerospace Research Institute

P.O acknowledged by: [TBC]

NAME: TBD
Title: TBD / Overseas Contracts Office
Date: TBD

Name: TBD 
Title: TBD / Division
Date: TBD


background image

Thermal Package Optimization and Cable/Pipe Routing Design for Engine Nacelle 

Request for Proposal, Annex B

Use or disclosure of the data contained on this sheet is subject to the restriction on the title page

The End of Documents