REQUEST FOR PROPOSAL
MULTI-MATERIAL TOPOLOGY OPTIMIZATION
FOR LIGHT WEIGHT DESIGN OF ELECTRIC ENGINE
September, 2024
Korea Aerospace Research Institute
169-84 Gwahak-ro, Yuseong-gu,
Daejeon, 34133, Republic of Korea
KARI proprietary
The data/information contained in this document shall not be disclosed, disseminated or reproduced, in whole or in part,
without the express prior written approval of KARI.
This page is intentionally left blank.
i
Multi-material topology optimization for light weight design of electric engine
Request for Proposal
Use or disclosure of the data contained on this sheet is subject to the restriction on the title page
Table of Contents
HYBRID ELECTRIC PROPULSION (HEP) SYSTEM DEVELOPMENT PROJECT ...................................3
PART II. GENERAL INSTRUCTION TO BIDDER ...................................................... 5
2.10 LANGUAGE AND MEASUREMENT UNIT .............................................................................. 11
2.11 PRICING REQUIREMENTS ................................................................................................. 11
2.12 CONFIDENTIALITY...........................................................................................................12
2.13 PROPRIETARY RIGHTS .....................................................................................................13
2.14 WITHDRAWAL OF PROPOSAL ...........................................................................................13
2.15 PROPERTY OF PROPOSAL .................................................................................................13
2.16 EXPENSES .....................................................................................................................13
2.17 GOVERNING LAW ...........................................................................................................13
2.18 CERTIFICATE AND GOVERNMENT APPROVAL .......................................................................13
2.19 ARBITRATION ................................................................................................................13
PART III. TECHNICAL REQUIREMENTS ................................................................ 15
MULTI-MATERIAL TOPOLOGY OPTIMIZATION OF AN ELECTRIC ENGINE .......................................21
ii
Multi-material topology optimization for light weight design of electric engine
Request for Proposal
Use or disclosure of the data contained on this sheet is subject to the restriction on the title page
ANNEX A. SUGGESTED PROPOSAL ..................................................................... 25
ANNEX B. TERMS AND CONDITIONS ................................................................. 29
Multi-material topology optimization for light weight design of electric engine
Request for Proposal
Use or disclosure of the data contained on this sheet is subject to the restriction on the title page
Part I. Introduction
Page 2
Multi-material topology optimization for the light weight design of an electric engine
Request for Proposal
Use or disclosure of the data contained on this sheet is subject to the restriction on the title page
This page is intentionally left blank.
Page 3
Multi-material topology optimization for the light weight design of an electric engine
Request for Proposal
Use or disclosure of the data contained on this sheet is subject to the restriction on the title page
1.1
Hybrid Electric Propulsion (HEP) System Development Project
Korea Aerospace Research Institute (hereinafter “KARI”), a government-funded research institute is
responsible for the development of Hybrid Electric Propulsion (HEP) system.
1.2
Objective of RFP
KARI is issuing this Request for Proposal (hereinafter “RFP”) to Bidders who are willing to collaborate
with KARI in successfully performing the multi-material topology optimization for the light weight
design of an electric engine. This RFP document explains the procedures to be undertaken by Bidders
seeking to respond to the RFP for related services. This RFP also details the requirements, terms, and
conditions for the proposal and contract.
1.3
Contract Concepts
In the phase of the issuance of RFP, this RFP is written and issued by KARI. The contract will be made
with one contractor who satisfies the scope of RFP with the experience and ability of research and
submit the lowest bid price.
In the evaluation and contract phases, Bidder’s Proposal will be evaluated by the evaluation
committee according to the related rules.
1.4
Schedule of Contract
2024. 10 [TBC] : Completion of contract between KARI and bidder [TBC]
2024. 11 [TBC] : Kick-off meeting [TBC]
2024. 11 [TBC] : Interim presentation [TBC]
2024. 12 [TBC] : Submission of final report [TBC]
2024. 12 [TBC] : Final presentation [TBC]
1.5
Terminology
Unless otherwise specified elsewhere, the following terms as used herein shall have the meaning as
assigned to them:
1.5.1
Bid means solicitation of KARI for the submittal of the Proposal in response to the RFP.
1.5.2
Bidder(s) means person(s) or corporation(s) who submits the Proposal in response to the
RFP.
1.5.3
Contract means a contract to be executed between KARI and Contractor for the multi-
Page 4
Multi-material topology optimization for the light weight design of an electric engine
Request for Proposal
Use or disclosure of the data contained on this sheet is subject to the restriction on the title page
material topology optimization for the light weight design of an electric engine pursuant to
the RFP.
1.5.4
Contractor means the party who has entered into the Contract.
1.5.5
KARI means Korea Aerospace Research Institute as designated by the government of the
Republic of Korea (“Korea”) for the issuance of the RFP.
1.5.6
Proposal means any set of documents effectively submitted by a Bidder in response to this
RFP.
1.5.7
RFP or Request for Proposal means all documents, including those attached or incorporated
by reference, used for soliciting Proposal as set forth in Section 2.2 (Structure of the RFP) of
Part II of the RFP.
1.5.8
Successful Bidder means the Bidder with the lowest Bid Price in the price evaluation, after
having passed technical evaluation, who is expected to formalize a Contract in Annex B
hereof.
1.5.9
TBD means “To Be Determined” by KARI before the award of the Contract.
1.5.10 TBC means “To Be Confirmed” mutually by KARI and Bidder as to any requirements
suggested.
Multi-material topology optimization for light weight design of electric engine
Request for Proposal
Use or disclosure of the data contained on this sheet is subject to the restriction on the title page
Part II. General Instruction to Bidder
Page 6
Multi-material topology optimization for the light weight design of an electric engine
Request for Proposal
Use or disclosure of the data contained on this sheet is subject to the restriction on the title page
This page is intentionally left blank.
Page 7
Multi-material topology optimization for the light weight design of an electric engine
Request for Proposal
Use or disclosure of the data contained on this sheet is subject to the restriction on the title page
2.1
Purpose
This section describes the requirements for preparing and submitting the Bidder’s Proposals in
response to this RFP.
2.2
Structure of the RFP
This RFP consists of the following Parts:
Part I
Introduction
Part II
General Instruction to Bidders
Part III
Technical Requirements
Part IV
Statement of Work
Annex A.
Suggested Proposal
Annex B.
Terms and Conditions
Part I provides introduction to this RFP document.
Part II illustrates general instructions for the preparation and submission of the Proposal, and
principles of evaluation of the Proposal.
Part III outlines conceptual design of a hybrid propulsion system and electric engine nacelles.
Part IV states the Statement of Work, which shall be provided by the Contractor to KARI during the
entire course of Contract. This Statement of Work will be the baseline for the Contract.
Annex A outlines the Bidder how to develop the Proposal.
Annex B presents the baseline of the general terms and conditions, which is the basic guideline for
the Bidder to prepare the Proposals and for KARI, and the Contractor to form the Contract.
2.3
Qualification of Bidder
2.3.1
Bidder shall have demonstrated track records in the multi-material topology optimization
for the light weight design of an electric engine.
2.3.2
The qualifying statement for the above requirements and support materials shall be
provided in the Proposal.
Page 8
Multi-material topology optimization for the light weight design of an electric engine
Request for Proposal
Use or disclosure of the data contained on this sheet is subject to the restriction on the title page
2.4
Submittal of Proposal
2.4.1
Proposal Documents
Bidder shall submit their Proposals in the following four (4) Volumes as presented in Annex A,
Suggested Proposal, with any other required certificate and evidences under the RFP.
Volume 1.
Executive Summary
Volume 2.
Technical Proposal
Volume 3.
Statement of Work Proposal
Volume 4.
Price Proposal (to be sealed in a separate envelope)
The detailed instructions for each Volume can be founded in the Suggested Proposal given in Annex
A of this RFP. It is recommended that Bidders submit the Proposals in the same sequence as enlisted
in the Suggested Proposal.
A4 size paper shall be used. If the larger paper should be used for the explanation, foldout can be
used.
2.4.2
Number of Copies
Bidders shall submit one (1) original hardcopy marked as “ORIGINAL COPY” on the cover and six (6)
duplicate hardcopies, without Volume 4 Price Proposal. For Volume 4 Price Proposal, only one (1)
hardcopy shall be submitted in a separate envelope. In addition, the electronic files of the Proposal
in Microsoft Office Word for Windows and Portable Document Format (PDF) shall be submitted
(except for Volume 4 Price Proposal). In order to substantiate a Proposal, all relevant data shall be
submitted as attachments.
In case of any discrepancy between the original copy and electronic file or the other hardcopies, the
original copy, which is marked as “ORIGINAL COPY” on the cover, shall prevail.
2.4.3
Bid Closing Date
The closing date and time for the Proposal is specified in the notice of this Bid (“Bid Closing Date”). If
any part of the Proposal or the bid bond as required under this RFP is received by KARI after the
stipulated closing time, the entire Proposal will be rejected.
2.4.4
Method of Submittal
The Proposal shall be hand-carried or delivered using a registered mail service to the following KARI
personnel or his designee:
Page 9
Multi-material topology optimization for the light weight design of an electric engine
Request for Proposal
Use or disclosure of the data contained on this sheet is subject to the restriction on the title page
Mr. Won-Suk LEE
Overseas Contracts Office
Korea Aerospace Research Institute
169-84 Gwahak-ro, Yuseong-gu
Daejeon, 34133, Korea
Tel) +82-42-860-2406
e-mail) wsl@kari.re.kr
The communication between KARI and Bidder for contractual matters (Terms and Conditions) shall
be controlled through the following designee:
Mrs. Eun-Jung Lee
Overseas Contract Office
Korea Aerospace Research Institute
169-84 Gwahak-ro, Yuseong-gu
Daejeon, 34133, Korea
Tel) +82-42-860-2148
e-mail) monicalee@kari.re.kr
2.4.5
Point of Contact
Besides the Proposal submission, the point of contact for all communications for technical matters
shall be
Dr. Jae-Sung HUH
Aeropropulsion Research Division
Korea Aerospace Research Institute
169-84 Gwahak-ro, Yuseong-gu
Daejeon, 34133, Korea
Tel) +82-42-860-2831
e-mail) jshuh@kari.re.kr
Bidder shall specify its single point of contact in the Volume I of its Proposal, “Executive Summary”,
for KARI to communicate in connection with the RFP, Proposal and the subsequent evaluation.
Bidder’s information on the point of contact shall include the name, title/position, telephone no., and
e-mail address.
Page 10
Multi-material topology optimization for the light weight design of an electric engine
Request for Proposal
Use or disclosure of the data contained on this sheet is subject to the restriction on the title page
2.4.6
Bid Bond
Bidder shall establish a bid bond in accordance with the bid notice for this RFP.
2.5
Bidding Schedule
2.5.1
The following schedule is a tentative milestone for the eventual Contract and may be
changed at KARI’s sole discretion:
[1]
Bid Notice and RFP Release: T0
[2]
Bid Closing Date: T1 = T0 + 30 calendar days
[3]
Evaluation of Proposal: T2 = T1 + 10 calendar days
[4]
Expected Contract Date: T3 = T2 + 10 calendar days
2.6
Questions and Modifications
2.6.1
Any questions as to the intent and clarity of the RFP may be directed to KARI’s point of
contact as specified in Section 2.4.4 & 2.4.5 of the Part II of this RFP by e-mail, and shall be
received no later than five (5) days before the Bid Closing Date.
2.6.2
KARI may ask a Bidder in writing for clarifications, amendments, revisions, or
supplementation of the Proposal and any other documents submitted by Bidder at any
time before the execution of the Contract. KARI may also ask Bidder to submit and supply
additional information or documents necessary for evaluation of the Proposal.
2.6.3
After the Bid Closing Date, Bidder shall not amend, modify, or supplement the Proposal, or
submit any other documents to KARI, except with KARI's written request.
2.7
Acceptance/Rejection of Bids
KARI reserves the right to accept or reject any Bidding, and to amend the Bidding process and reject
all Biddings at any time prior to the award of the Contract without thereby incurring any liability to
the affected Bidder, and KARI is not under any obligation to inform the affected Bidder of the ground
for its action.
2.8
Evaluation of Proposal
The evaluation of the Proposals will be made by the evaluation committee, which will be acting
through KARI.
Page 11
Multi-material topology optimization for the light weight design of an electric engine
Request for Proposal
Use or disclosure of the data contained on this sheet is subject to the restriction on the title page
The following evaluation process is for information only, and the evaluation committee reserves the
right to modify the evaluation process and criteria without any prior notification to Bidders.
2.8.1
Evaluation Process
2.8.1.1
During the Bid evaluation, KARI may send to Bidders a set of questions for clarification and
request any supplement to the Proposals and the evaluation will be made based on the
Proposal, the answers to KARI questions and the supplement received from Bidders. The
Proposal which is improvable, unrealistic, unreliable or based on vague presumptions shall
not get good scores.
2.8.1.2
The evaluation shall be in two (2) stages: the technical evaluation and the price evaluation.
First, technical proposals shall be evaluated by the evaluation committee in order to select
the Bidders technically qualified to perform the work under this RFP. The total score for
technical proposal is one hundred (100) points and the Bidders with eighty (80) points or
higher shall be considered in the next stage of price evaluation. In the second stage, the
Bidder with the lowest bid price which shall be less than or equal to KARI’s estimated
budget will be selected as the Successful Bidder.
2.8.1.3
Subject to an evaluation of the Proposal, the evaluation committee will judge whether
Bidder provides Proposal enough to meet the requirements in this RFP.
2.8.1.4
The result of evaluation is at the proposal evaluation committee’s discretion based on
evaluation process and Bidders shall not raise any objection regarding the proposal
evaluation committee’s decision thereupon.
2.9
Contract
2.9.1
The Terms and Conditions as presented in Annex B of this RFP is the baseline requirement
for the Contract with the Successful Bidder, and will be the basis of the Contract.
2.10 Language and Measurement Unit
2.10.1
The Proposal and any documents submitted to KARI under the RFP and communication
and the Contract language shall be in English.
2.10.2
"Système Internationale" (SI, hereafter) units shall be used for measurements and
quantities in the Proposal and all the accompanying documents. However, British unit of
power and weight could be used as a complementary unit. In this case, SI unit comes first
and British unit shall be put in parentheses.
2.11 Pricing Requirements
Page 12
Multi-material topology optimization for the light weight design of an electric engine
Request for Proposal
Use or disclosure of the data contained on this sheet is subject to the restriction on the title page
2.11.1
Any price or rate for Contract shall be firm and fixed, not subject to change for a price
escalation for the entire period of the Contract. Therefore, the proposed price shall reflect
possible fluctuations in labor costs, material prices and others. The Contractor shall not
demand to reflect the fluctuation on the Contract.
2.11.2
Any kinds of taxes and duties arising in connection with Bidder’s work under this RFP and
under the eventual Contract shall be Bidder’s responsibility, except for the customs duties
and VAT levied in Korea and the price shall be inclusive of any cost or charge incurred due to
delivery of any hardware, software, equipment, spare parts,
and documentation to KARI or its
designated point of delivery.
2.11.3 The currency quoted in the Price Proposal shall be expressed in the same currency used in
KARI’s bid notice for this RFP. However, other currency may be allowed. If Bidder’s
proposed price is in a currency other than the currency of the estimated budget specified
in KARI’s bid notice of this RFP, then for the conversion of the Bidder’s proposed price, the
1st basic exchange rate announced by KEB Hana Bank on the price evaluation date shall be
used.
2.11.4 Likewise, the currency of the Contract may be Contractor’s national currency within the
value of Bidder’s bid price, in which case, the 1st basic exchange rate announced by KEB
Hana Bank on price evaluation date shall be applied for the exchange rate for currency
change.
2.11.5
Bidder shall include all cost items to cover all activities in the Proposal and itemize
requested items.
2.11.6
Korean corporation tax (hereinafter referred to as ‘Applicable Tax’) in Korea will be withheld
under the Contract. Therefore, KARI shall withhold the Applicable Tax and pay to the
relevant Korean taxing authority on behalf of Contractor in accordance with applicable
Korean law and international tax treaty between Korea and Bidder’s country. After paying
the Applicable Tax to the relevant Korean taxing authority, KARI will convey the certificate
of the withholding Tax to Contractor within ninety (90) days of such payment.
2.12 Confidentiality
2.12.1
There shall be no news releases, public announcements, denials or confirmation in
connection with this RFP or contract award without prior written approval of KARI. Also,
Bidder shall not disclose any part of this RFP to third parties without prior written approval
of KARI.
2.12.2
All documentation submitted in response to this RFP shall be marked "COMMERCIALS-IN-
CONFIDENCE" on the first page of each document. All elements of the RFP shall be kept
confidential, and shall not be intentionally disclosed by Bidder to third parties.
Page 13
Multi-material topology optimization for the light weight design of an electric engine
Request for Proposal
Use or disclosure of the data contained on this sheet is subject to the restriction on the title page
2.13 Proprietary Rights
KARI shall have the irrevocable, royalty-free, and exclusive right to use any data and the results of
the multi-material topology optimization for the light weight design of an electric engine.
2.14 Withdrawal of Proposal
Bidder may withdraw its Proposal at any time before the Bid Closing Date. Withdrawal shall be made
in writing, and shall be received by KARI before the Bid Closing Date.
2.15 Property of Proposal
All documents submitted in response to the RFP shall become the property of KARI and will be
retained by KARI.
2.16 Expenses
Expenses incurred by Bidder in connection with the preparation, submittal, and any subsequent
clarification or any other activities for this Bidding are for their own account and will not be
reimbursed by KARI.
2.17 Governing Law
This RFP and the Contract shall be construed in accordance with and governed by the laws of the
Republic of Korea.
2.18 Certificate and Government Approval
Bidders shall obtain the government approval and certificates (e.g. export licenses) in relevant
countries, if any, necessary for Bidder's work for this Proposal. Bidder's ability and plan to get such
approval and certificates shall be submitted to KARI, together with any appropriate assurance letters
from the relevant governments, in the proposal.
2.19 Arbitration
Any disputes arising out of or in connection with this RFP and Contract shall be finally settled by
arbitration in Seoul, Korea, in accordance with the International Arbitration Rules of the Korean
Commercial Arbitration Board.
Multi-material topology optimization for light weight design of electric engine
Request for Proposal
Use or disclosure of the data contained on this sheet is subject to the restriction on the title page
This page is intentionally left blank.
Page 15
Multi-material topology optimization for the light weight design of an electric engine
Request for Proposal
Use or disclosure of the data contained on this sheet is subject to the restriction on the title page
Part III. Technical Requirements
Page 16
Multi-material topology optimization for the light weight design of an electric engine
Request for Proposal
Use or disclosure of the data contained on this sheet is subject to the restriction on the title page
This page is intentionally left blank.
Page 17
Multi-material topology optimization for the light weight design of an electric engine
Request for Proposal
Use or disclosure of the data contained on this sheet is subject to the restriction on the title page
3.1
Project Information
A Hybrid Electric Propulsion (HEP) system development project launched in 2021 is a basic technology
R&D project which is led by Korea Aerospace Research Institute and funded by the ROK government.
This project was initiated by the needs of adopting a gas turbine engine based-hybrid electric
propulsion system for a long endurance and high payload eVTOL (e-Vertical Take-Off and Landing). All
electric VTOL is known as to have limitations of payload and range due to restricted energy density of
Li-Ion battery. The goal of this project covers to establish an optimal design of the hybrid electric
propulsion system and to do the HEP system performance test at a newly constructed ground test
facility. The HEP system has many components such as a turboshaft engine, a generator, a rectifier,
several battery packs, motors, inverters, heat exchangers, and etc. It requires the light weight design
using DfAM (Design for Additive Manufacturing). Therefore, this technical project will cover the multi-
material topology optimization for the light weight design of an electric engine.
3.2 Introduction
3.2.1 Conceptual design of a hybrid propulsion system
A schematic design of a series hybrid propulsion system is shown in Fig. 1, and in general, the system
features a couple of cruise propellers (or prop-rotors) and several lift prop-rotors. Each cruise
propeller or lift prop-rotor connects to an electric motor and an inverter which are installed in an
electric engine nacelle as shown in Fig. 1.
Figure 1. Schematic of HEP system
3.2.2 Electric Engine
Page 18
Multi-material topology optimization for the light weight design of an electric engine
Request for Proposal
Use or disclosure of the data contained on this sheet is subject to the restriction on the title page
An electric engine (EE) is installed in an engine nacelle and rotates the prop-blades as shown in Fig. 2.
An eVTOL for Advanced Air Mobility generally has distributed propulsion system, which has multiple
prop-rotors due to high safety requirement, and is expected to experience various loading condition
due to vertical take-off/landing, transition, and cruise conditions. Therefore, it is important to have
robust and light weight design under complex loading conditions.
Figure 2. Example of electric engine nacelles
Page 19
Multi-material topology optimization for the light weight design of an electric engine
Request for Proposal
Use or disclosure of the data contained on this sheet is subject to the restriction on the title page
Part IV. Statement of Work
Page 20
Multi-material topology optimization for the light weight design of an electric engine
Request for Proposal
Use or disclosure of the data contained on this sheet is subject to the restriction on the title page
This page is intentionally left blank.
Page 21
Multi-material topology optimization for the light weight design of an electric engine
Request for Proposal
Use or disclosure of the data contained on this sheet is subject to the restriction on the title page
4.1 Overview
This section defines the work to be performed by the Contractor, including the provision of reports
and data for the multi-material topology optimization for the light weight design of an electric engine.
The contents, which will be included in a contract document, will be determined based on this RFP
and the Contractor's Proposal.
4.2 General Description
The goal of this project is to define the enhanced mathematical model and formulation for light
weight design based on the KARI’s request, and to solve the optimization problem with advanced in-
house code that the contractor has. Finally, the optimized geometry shall be proposed.
4.3 Multi-material topology optimization of an electric engine
4.3.1 KARI will provide the detailed geometry of an electric engine as shown in Fig. 3, and the shaft
and stator geometry, respectively.
Fig. 3. Geometry of an electric engine and design domains (green and blue area)
4.3.2
The contractor shall define the design domain of the electric engine from the CAD model
provided from KARI and shall consider the axisymmetric layout of the rotor and stator of the
electric engine.
4.3.3
The contractor shall define the mathematical problem for multi-material topology
optimization of the electric engine for light weight design, and the formulation shall consider
structural integrity and vibration characteristics. However, these performance functions are
not limited.
Page 22
Multi-material topology optimization for the light weight design of an electric engine
Request for Proposal
Use or disclosure of the data contained on this sheet is subject to the restriction on the title page
4.3.4
KARI will provide the various loading conditions generated from the prop-blades during a
variety of operation conditions.
Fig. 4. Loading conditions from prop-blades
4.3.5
If necessary, the contractor shall customize the in-house code that the contractor has been
developing, and then solve the multi-material topology optimization problem.
4.3.6
The contractor shall post-process the optimized geometry and shall propose both of the
interim design of the electric engine and the next process for optimizing the full model of
the electric engine rotor and shaft.
4.4 Schedule of Works
Time*
Event
Within one week after
contract
KARI provide document for design of an electric
engine
November, 2024
Kick-off meeting
November, 2024
Interim presentation
One week before final
meeting
Submission of final report
Early of December, 2024
Final presentation
18st December, 2024
End of Contract
*) Earlier is better
4.4.1
Kick off meeting shall be performed at the Contractor site but it can be changed. (exact date
will be determined later).
4.4.2 Final meeting shall be held at the KARI. (exact date and location will be fixed later)
Page 23
Multi-material topology optimization for the light weight design of an electric engine
Request for Proposal
Use or disclosure of the data contained on this sheet is subject to the restriction on the title page
4.5 Kick-off and final meeting
4.5.1
The Contractor shall prepare for kick-off and final meeting as stated in 4.4. A meeting room
for kick-off meeting shall be prepared by Contractor, if it is held at the Contractor’s location,
and the meeting room shall be equipped with free WIFI.
4.5.2
To leave an evidence for kick-off and final meetings, lecture materials presented during kick-
off meeting and final meeting shall be provided to KARI in electronic file format.
4.5.3 If sensitive information is included, it should be removed and provided to KARI.
4.6 Deliverable Items
The following items written in English should be submitted to KARI.
(a) The optimization report;
(b) Advisory review report; and
(c) Other materials relevant for the performance of Contract such as presentation slides.
The optimization report and Advisory review report shall be submitted one week before the final
meeting and prepared in MS Word or MS Power Point format.
For late delivery of the report above, the liquidated damages for delay shall apply.
Multi-material topology optimization for light weight design of electric engine
Request for Proposal
Use or disclosure of the data contained on this sheet is subject to the restriction on the title page
This page is intentionally left blank.
Page 25
Multi-material topology optimization for the light weight design of an electric engine
Request for Proposal
Use or disclosure of the data contained on this sheet is subject to the restriction on the title page
Annex A. Suggested Proposal
Page 26
Multi-material topology optimization for the light weight design of an electric engine
Request for Proposal
Use or disclosure of the data contained on this sheet is subject to the restriction on the title page
This page is intentionally left blank.
Page 27
Multi-material topology optimization for the light weight design of an electric engine
Request for Proposal
Use or disclosure of the data contained on this sheet is subject to the restriction on the title page
1. Volume 1 : EXECUTIVE SUMMARY
This volume shall describe Bidder’s introduction and Proposal summary. The Bidder’s experience for
the consulting work relevant to the multi-material topology optimization for the light weight design
of an electric engine should be included. Bidder shall describe current or past work similar to this RFP,
which is being implemented or has been done by Bidder.
2. Volume 2 : TECHNICAL PROPOSAL
Bidder shall describe technical information, methodology, analysis, performance, and etc. to comply
with RFP requirements. Bidder shall describe this technical proposal with as many illustrations as
possible to make it clear.
3. Volume 3 : STATEMENT OF WORK PROPOSAL
Bidder shall submit Statement of Work proposal in this volume. Bidder shall describe work scope of
the Bidder for key topics in detail including the respective plan. In order to substantiate a proposal,
all relevant data shall be submitted as attachments. The proposal which is improvable or based on
vague presumptions shall be excluded. The basic unit shall be SI unit. British unit of power and weight
could be used as a complementary unit. SI unit comes first and British unit shall be put in parentheses.
4. Volume 4 : PRICE PROPOSAL
Bidder shall submit Price Proposal in this volume. In this volume, Bidder shall provide the price
breakdown of the price proposed by the Bidder in detail. Price shall be proposed in Korean WON and
the proposed price shall reflect possible fluctuations in labor costs, material prices and others in the
proposed price. And Bidder shall seal and submit this Price Proposal in separate.
Multi-material topology optimization for light weight design of electric engine
Request for Proposal
Use or disclosure of the data contained on this sheet is subject to the restriction on the title page
This page is intentionally left blank.
Page 29
Multi-material topology optimization for the light weight design of an electric engine
Request for Proposal
Use or disclosure of the data contained on this sheet is subject to the restriction on the title page
Annex B. Terms and Conditions
Page 30
Multi-material topology optimization for the light weight design of an electric engine
Request for Proposal
Use or disclosure of the data contained on this sheet is subject to the restriction on the title page
This page is intentionally left blank.
http://www.kari.re.kr
169-84 Gwahak-ro, Yuseong-gu, Daejeon, 34133, Republic of Korea
Telephone: +82-42-860-2406 Fax : +82-42-879-4370
Page 31
Multi-material topology optimization for the light weight design of an electric engine
Request for Proposal
Use or disclosure of the data contained on this sheet is subject to the restriction on the title page
[TBD], 2024
[Name]
[Title]
[Contractor name]
[Address]
Tel: [TBD]
e-mail: [TBD]
Subject: Purchase Order (“PO”) No. KARI-24-[TBD] for for the multi-material topology optimization
for the light weight design of an electric engine
Dear [TBD],
Korea Aerospace Research Institute (hereinafter “KARI”) hereby places an order with [Contractor]
(hereinafter “Contractor”) for following service in accordance with Attachment B “Statement of Work”
based on the terms and conditions below. Please provide your acknowledgement by signature after
receipt of the PO with KARI’s signature, and send us by e-mail the fully signed PO and proceed the
work at your earliest convenience.
A. Order Information: As per the Contractor’s proposal submitted to KARI dated [TBD], 2024
- Total Price: KRW [TBD] (firm and fixed; Korean Value-Added Tax (VAT) not included)
- Item: Multi-material topology optimization for the light weight design of an electric engine
(hereinafter referred to as “the Task”) in accordance with Attachment B “Statement of Work”.
Description
Price (KRW)
Task
Multi-material topology optimization for the light weight design of
an electric engine in accordance with Attachment A & B
[TBD]
Total Price (firm and fixed)
[TBD]
B. Terms of Payment
No.
Milestone
Payment Due date
Price (KRW)
Percentage
(%)
1
P-Bond (Section F) + Kick-off
meeting
Milestone completion
+ 30 days
[TBD]
30
2
Receipt of the Task Reports
Receipt of Task Report
+ 30 days
[TBD]
70
Total Price (firm and fixed)
[TBD]
100
http://www.kari.re.kr
169-84 Gwahak-ro, Yuseong-gu, Daejeon, 34133, Republic of Korea
Telephone: +82-42-860-2406 Fax : +82-42-879-4370
Page 32
Multi-material topology optimization for the light weight design of an electric engine
Request for Proposal
Use or disclosure of the data contained on this sheet is subject to the restriction on the title page
- The payment shall be made by wire transfer to the bank account below as designated by
Contractor, within thirty (30) days after receipt of payment invoice and completion of each
milestone.
- All banking charges incurred in Korea shall be borne by KARI, and those charges incurred
outside of Korea shall be borne by Contractor.
- Bank account information for payment to Contractor
Beneficiary‘s bank including branch
name and address
SWIFT/BIC/Routing No./Transit No./ABA
No., etc.
Beneficiary‘s Name
Account Number/IBAN
C. Taxes
- Korean VAT is not included in Contract Price and shall be the responsibility of KARI.
- Unless it is proved that Contract Price under this PO is not taxable in Korea as Korean
corporation tax (herein referred to as ‘Applicable Tax’), such tax will be withheld by KARI and
KARI shall pay to the relevant Korean taxing authority on behalf of Contractor as required in
accordance with the applicable Korean law and international tax treaty between the
governments of Korea and [TBD]. In such case, KARI shall forward the certificate for payment
of the withheld tax to Contractor within ninety (90) days of such payment.
- KARI shall be responsible for customs duties and VAT on the Deliverable Items levied by Korean
tax authority.
D. Deliverable Items (Document) and Intellectual Property Rights
- The list of Deliverable Items and due dates for each Deliverable Item are as set forth in
Attachment B “Statement of Work”.
- The Deliverable Items shall be the property of KARI.
- KARI shall have an irrevocable, royalty-free, and exclusive licence to use any data included in
the Deliverable Items necessary for the purpose of this PO.
E. Delivery term
- The Deliverable Items shall be provided to the following KARI persons by e-mail;
Dr. Jae-Sung HUH (jshuh@kari.re.kr), and Dr. Sangook Jun (sangookjun@kari.re.kr).
F. Performance bond
- Contractor shall establish a performance bond in favor of KARI in the value of ten percent (10 %)
of the Total Price, in the form of an irrevocable and unconditional standby letter of credit or
bank guarantee available by KARI’s draft at sight, or shall deposit the amount equivalent to ten
percent (10 %) of the Total Price to the following account as security for performance.
http://www.kari.re.kr
169-84 Gwahak-ro, Yuseong-gu, Daejeon, 34133, Republic of Korea
Telephone: +82-42-860-2406 Fax : +82-42-879-4370
Page 33
Multi-material topology optimization for the light weight design of an electric engine
Request for Proposal
Use or disclosure of the data contained on this sheet is subject to the restriction on the title page
Beneficiary‘s bank
including address
Woori Bank, Daejeon Banking Center, located at 1495, Doonsan-
dong, Yusung-gu, Dajeon, Republic of Korea
SWIFT Code
HVBKKR SEXXX
Beneficiary‘s Name
Korea Aerospace Research Institute
Account Number
1081-600-247322
- If Contractor fails in performance of this Contract, including failure to obtain any export licence
required for the purpose of this Contract, the performance bond will be confiscated by KARI as
liquidated damages. In case of a letter of credit, the bond shall be available by KARI’s draft at
sight without any further requirements other than KARI’s presentation of the statement that:
there was a default of the Contractor in the performance of the Contract.
- The performance bond shall remain valid until the end of the warranty period indicated in
Section H. “Warranty”.
G. Liquidated damages
- Liquidated damages to be applied for late delivery of the Deliverable Items in accordance with
Attachment B “Statement of Work” at the rate of zero point one two five percent (0.125%) of
Total Price per day, up to thirty percent (30%) of Total Price in maximum.
H. Warranty
- The warranty period shall be one (1) year from the delivery date of Deliverable Items by e-mail.
I. Confidentiality
- Contractor shall not, in any manner, advertise, publish or release any information related to
this Purchase Order or the work performed or to be performed hereunder without prior
approval of KARI.
J. Governing Law and Resolution of Dispute
- This PO shall be construed in accordance with and governed by the laws of the Republic of
Korea and any disputes between both Parties arising out of or in connection with this PO shall
be finally settled by arbitration in Seoul, Korea, in accordance with the International Arbitration
Rules of the Korean Commercial Arbitration Board.
K. Point of Contact in KARI
Contractual Matters
Technical Matters
Name : Mr. Eun-Jung Lee
Name : Dr. Jae Sung Huh
Tel : +82-42-860-2148
Tel : +82-42-860-2831
e-mail : monicalee@kari.re.kr
e-mail : jshuh@kari.re.kr
http://www.kari.re.kr
169-84 Gwahak-ro, Yuseong-gu, Daejeon, 34133, Republic of Korea
Telephone: +82-42-860-2406 Fax : +82-42-879-4370
Page 34
Multi-material topology optimization for the light weight design of an electric engine
Request for Proposal
Use or disclosure of the data contained on this sheet is subject to the restriction on the title page
Thank you in advance for your cooperation.
Sincerely yours,
cc : Mr. Won-Suk LEE
Attachment A. Technical Requirements
Attachment B. Statement of Work
Korea Aerospace Research Institute
P.O acknowledged by: [TBC]
NAME: TBD
Title: TBD / Overseas Contracts Office
Date: TBD
Name: TBD
Title: TBD / Division
Date: TBD
Multi-material topology optimization for the light weight design of an electric engine
Request for Proposal
Use or disclosure of the data contained on this sheet is subject to the restriction on the title page
The End of Documents