PDF문서3. RFP_Multi-material Topology Optimization For Light Weight Design of Electric Engine.pdf

닫기

background image

 

KARI proprietary 

The data/information contained in this document shall not be disclosed, disseminated or reproduced, in whole or in part, 

without the express prior written approval of KARI. 

 
 
 

 

REQUEST FOR PROPOSAL 

 

MULTI-MATERIAL TOPOLOGY OPTIMIZATION 

FOR LIGHT WEIGHT DESIGN OF ELECTRIC ENGINE 

 
 
 

September, 2024 

 
 
 

 

 

Korea Aerospace Research Institute 

169-84 Gwahak-ro, Yuseong-gu, 

Daejeon, 34133, Republic of Korea 

 

 

 


background image

 

KARI proprietary 

The data/information contained in this document shall not be disclosed, disseminated or reproduced, in whole or in part, 

without the express prior written approval of KARI. 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

This page is intentionally left blank. 

 


background image

Multi-material topology optimization for light weight design of electric engine   

Request for Proposal 

 

Use or disclosure of the data contained on this sheet is subject to the restriction on the title page 

Table of Contents 

PART I. INTRODUCTION ........................................................................................ 1 

1.1 

HYBRID ELECTRIC PROPULSION (HEP) SYSTEM DEVELOPMENT PROJECT ...................................3 

1.2 

OBJECTIVE OF RFP ...........................................................................................................3 

1.3 

CONTRACT CONCEPTS .......................................................................................................3 

1.4 

SCHEDULE OF CONTRACT ...................................................................................................3 

1.5 

TERMINOLOGY ................................................................................................................3 

PART II. GENERAL INSTRUCTION TO BIDDER ...................................................... 5 

2.1 

PURPOSE ........................................................................................................................7 

2.2 

STRUCTURE OF THE RFP ...................................................................................................7 

2.3 

QUALIFICATION OF BIDDER ................................................................................................7 

2.4 

SUBMITTAL OF PROPOSAL .................................................................................................8 

2.4.1   

Proposal Documents .......................................................................................8 

2.4.2   

Number of Copies ............................................................................................8 

2.4.3   

Bid Closing Date ..............................................................................................8 

2.4.4   

Method of Submittal .......................................................................................8 

2.4.5   

Point of Contact ...............................................................................................9 

2.4.6   

Bid Bond ........................................................................................................10 

2.5 

BIDDING SCHEDULE ........................................................................................................10 

2.6 

QUESTIONS AND MODIFICATIONS .....................................................................................10 

2.7 

ACCEPTANCE/REJECTION OF BIDS .....................................................................................10 

2.8 

EVALUATION OF PROPOSAL ..............................................................................................10 

2.8.1 

Evaluation Process ........................................................................................ 11 

2.9 

CONTRACT .................................................................................................................... 11 

2.10  LANGUAGE AND MEASUREMENT UNIT .............................................................................. 11 
2.11  PRICING REQUIREMENTS ................................................................................................. 11 
2.12  CONFIDENTIALITY...........................................................................................................12 
2.13  PROPRIETARY RIGHTS .....................................................................................................13 
2.14  WITHDRAWAL OF PROPOSAL ...........................................................................................13 
2.15  PROPERTY OF PROPOSAL .................................................................................................13 
2.16  EXPENSES .....................................................................................................................13 
2.17  GOVERNING LAW ...........................................................................................................13 
2.18  CERTIFICATE AND GOVERNMENT APPROVAL .......................................................................13 
2.19  ARBITRATION ................................................................................................................13 

PART III. TECHNICAL REQUIREMENTS ................................................................ 15 

3.1 

PROJECT INFORMATION ..................................................................................................17 

3.2 

INTRODUCTION..............................................................................................................17 

3.2.1    Conceptual design of a hybrid propulsion system ................................................17 
3.2.2    Electric Engine .......................................................................................................17 

PART IV. STATEMENT OF WORK ........................................................................ 19 

4.1 

OVERVIEW....................................................................................................................21 

4.2 

GENERAL DESCRIPTION ...................................................................................................21 

4.3 

MULTI-MATERIAL TOPOLOGY OPTIMIZATION OF AN ELECTRIC ENGINE .......................................21 



background image

Multi-material topology optimization for light weight design of electric engine   

Request for Proposal 

 

Use or disclosure of the data contained on this sheet is subject to the restriction on the title page 

 

 

 
 
 
 
 
 
 

Part I. Introduction 

 

 


background image

Page  2 

  Multi-material topology optimization for the light weight design of an electric engine   

Request for Proposal 

 

Use or disclosure of the data contained on this sheet is subject to the restriction on the title page 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

This page is intentionally left blank. 


background image

Page  3 

  Multi-material topology optimization for the light weight design of an electric engine   

Request for Proposal 

 

Use or disclosure of the data contained on this sheet is subject to the restriction on the title page 

1.1 

Hybrid Electric Propulsion (HEP) System Development Project 

 

Korea Aerospace Research Institute (hereinafter “KARI”), a government-funded research institute is 
responsible for the development of Hybrid Electric Propulsion (HEP) system. 

 

 
1.2 

Objective of RFP 

 

KARI is issuing this Request for Proposal (hereinafter “RFP”) to Bidders who are willing to collaborate 
with KARI in successfully performing the multi-material topology  optimization for the light weight 
design of an electric engine. This RFP document explains the procedures to be undertaken by Bidders 
seeking to respond to the RFP for related services. This RFP also details the requirements, terms, and 
conditions for the proposal and contract. 

 
1.3 

Contract Concepts 

 

In the phase of the issuance of RFP, this RFP is written and issued by KARI. The contract will be made 
with one contractor who satisfies the scope of RFP with the experience and ability of research and 
submit the lowest bid price. 

In  the  evaluation  and  contract  phases,  Bidder’s  Proposal  will  be  evaluated  by  the  evaluation 
committee according to the related rules. 

 
1.4 

Schedule of Contract   

 

2024. 10    [TBC]    : Completion of contract between KARI and bidder [TBC] 

2024. 11    [TBC]    : Kick-off meeting [TBC] 

2024. 11  [TBC]    : Interim presentation [TBC] 

2024. 12  [TBC]    : Submission of final report [TBC] 

2024. 12  [TBC]    : Final presentation [TBC] 

 
1.5 

Terminology 

 

Unless otherwise specified elsewhere, the following terms as used herein shall have the meaning as 
assigned to them: 

 

1.5.1 

Bid means solicitation of KARI for the submittal of the Proposal in response to the RFP. 

 

1.5.2 

Bidder(s) means person(s) or corporation(s) who submits the Proposal in response to the 
RFP. 

 

1.5.3 

Contract  means  a  contract  to  be  executed  between  KARI  and  Contractor  for  the  multi-


background image

Page  4 

  Multi-material topology optimization for the light weight design of an electric engine   

Request for Proposal 

 

Use or disclosure of the data contained on this sheet is subject to the restriction on the title page 

material topology optimization for the light weight design of an electric engine pursuant to 
the RFP. 

 

1.5.4 

Contractor means the party who has entered into the Contract. 

 

1.5.5 

KARI means Korea Aerospace Research Institute as designated by the  government of the 
Republic of Korea (“Korea”) for the issuance of the RFP. 

 

1.5.6 

Proposal means any set of documents effectively submitted by a Bidder in response to this 
RFP. 

 

1.5.7 

RFP or Request for Proposal means all documents, including those attached or incorporated 
by reference, used for soliciting Proposal as set forth in Section 2.2 (Structure of the RFP) of 
Part II of the RFP. 

 
1.5.8 

Successful Bidder means the Bidder with the lowest Bid Price in the price evaluation, after 
having  passed  technical  evaluation,  who  is  expected  to  formalize  a  Contract  in  Annex  B 
hereof.   

 

1.5.9 

TBD means “To Be Determined” by KARI before the award of the Contract. 

 

1.5.10  TBC  means  “To  Be  Confirmed”  mutually  by  KARI  and  Bidder  as  to  any  requirements 

suggested. 

 
 


background image

Multi-material topology optimization for light weight design of electric engine   

Request for Proposal 

 

Use or disclosure of the data contained on this sheet is subject to the restriction on the title page 

 

 
 
 
 
 
 
 

Part II. General Instruction to Bidder 

 

 


background image

Page  6 

  Multi-material topology optimization for the light weight design of an electric engine   

Request for Proposal 

 

Use or disclosure of the data contained on this sheet is subject to the restriction on the title page 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

This page is intentionally left blank. 

 

 


background image

Page  7 

  Multi-material topology optimization for the light weight design of an electric engine   

Request for Proposal 

 

Use or disclosure of the data contained on this sheet is subject to the restriction on the title page 

2.1 

Purpose   

 

This  section  describes  the  requirements  for  preparing  and  submitting  the  Bidder’s  Proposals  in 
response to this RFP. 

 
2.2 

Structure of the RFP   

 

This RFP consists of the following Parts: 

 

Part I  

Introduction 

Part II   

General Instruction to Bidders 

Part III 

Technical Requirements 

Part IV 

Statement of Work 

 

Annex A.   

Suggested Proposal 

Annex B. 

Terms and Conditions 

 

Part I provides introduction to this RFP document. 

 

Part  II  illustrates  general  instructions  for  the  preparation  and  submission  of  the  Proposal,  and 
principles of evaluation of the Proposal. 

 

Part III outlines conceptual design of a hybrid propulsion system and electric engine nacelles. 

 

Part IV states the Statement of Work, which shall be provided by the Contractor to KARI during the 
entire course of Contract. This Statement of Work will be the baseline for the Contract. 

 

Annex A outlines the Bidder how to develop the Proposal. 

 

Annex B presents the baseline of the general terms and conditions, which is the basic guideline for 
the Bidder to prepare the Proposals and for KARI, and the Contractor to form the Contract. 

 
2.3 

Qualification of Bidder 

 

2.3.1 

Bidder shall have demonstrated track records in the multi-material topology optimization 
for the light weight design of an electric engine. 

 

2.3.2   

The  qualifying  statement  for  the  above  requirements  and  support  materials  shall  be 
provided in the Proposal. 

 


background image

Page  8 

  Multi-material topology optimization for the light weight design of an electric engine   

Request for Proposal 

 

Use or disclosure of the data contained on this sheet is subject to the restriction on the title page 

2.4 

Submittal of Proposal 

 

2.4.1   

Proposal Documents 

 

Bidder  shall  submit  their  Proposals  in  the  following  four  (4)  Volumes  as  presented  in  Annex  A, 
Suggested Proposal, with any other required certificate and evidences under the RFP. 

 

Volume 1. 

Executive Summary 

Volume 2. 

Technical Proposal 

Volume 3. 

Statement of Work Proposal 

Volume 4. 

Price Proposal (to be sealed in a separate envelope) 

 

The detailed instructions for each Volume can be founded in the Suggested Proposal given in Annex 
A of this RFP. It is recommended that Bidders submit the Proposals in the same sequence as enlisted 
in the Suggested Proposal. 
 

A4 size paper shall be used. If the larger paper should be used for the explanation, foldout can be 
used. 

 

2.4.2   

Number of Copies 

 

Bidders shall submit one (1) original hardcopy marked as “ORIGINAL COPY” on the cover and six (6) 
duplicate hardcopies, without Volume 4 Price Proposal. For Volume 4 Price Proposal,  only one (1) 
hardcopy shall be submitted in a separate envelope. In addition, the electronic files of the Proposal 
in  Microsoft  Office  Word  for  Windows  and  Portable  Document  Format  (PDF)  shall  be  submitted 
(except for Volume 4 Price Proposal). In order to substantiate a Proposal, all relevant data shall be 
submitted as attachments. 

 

In case of any discrepancy between the original copy and electronic file or the other hardcopies, the 
original copy, which is marked as “ORIGINAL COPY” on the cover, shall prevail. 

 

2.4.3   

Bid Closing Date 

 
The closing date and time for the Proposal is specified in the notice of this Bid (“Bid Closing Date”). If 
any  part  of the  Proposal  or  the  bid bond  as required under  this  RFP  is  received by  KARI  after  the 
stipulated closing time, the entire Proposal will be rejected. 

 

2.4.4   

Method of Submittal 

 

The Proposal shall be hand-carried or delivered using a registered mail service to the following KARI 
personnel or his designee:   


background image

Page  9 

  Multi-material topology optimization for the light weight design of an electric engine   

Request for Proposal 

 

Use or disclosure of the data contained on this sheet is subject to the restriction on the title page 

Mr. Won-Suk LEE 

Overseas Contracts Office 

 

Korea Aerospace Research Institute 

169-84 Gwahak-ro, Yuseong-gu 

Daejeon, 34133, Korea 

Tel) +82-42-860-2406 

e-mail) wsl@kari.re.kr 

 

The communication between KARI and Bidder for contractual matters (Terms and Conditions) shall 
be controlled through the following designee:   

 

Mrs. Eun-Jung Lee 

Overseas Contract Office 

 

Korea Aerospace Research Institute 

169-84 Gwahak-ro, Yuseong-gu 

Daejeon, 34133, Korea 

Tel) +82-42-860-2148 

e-mail) monicalee@kari.re.kr 

 

2.4.5   

Point of Contact 

 

Besides the Proposal submission, the point of contact for all communications for technical matters 
shall be   

 

Dr. Jae-Sung HUH 

Aeropropulsion Research Division 

 
Korea Aerospace Research Institute 

169-84 Gwahak-ro, Yuseong-gu 

Daejeon, 34133, Korea 

Tel) +82-42-860-2831 

e-mail) jshuh@kari.re.kr 

 

Bidder shall specify its single point of contact in the Volume I of its Proposal, “Executive Summary”, 
for  KARI  to  communicate  in  connection  with  the  RFP,  Proposal  and  the  subsequent  evaluation. 
Bidder’s information on the point of contact shall include the name, title/position, telephone no., and 
e-mail address. 


background image

Page  10 

  Multi-material topology optimization for the light weight design of an electric engine   

Request for Proposal 

 

Use or disclosure of the data contained on this sheet is subject to the restriction on the title page 

2.4.6   

Bid Bond 

 
Bidder shall establish a bid bond in accordance with the bid notice for this RFP. 

 
2.5 

Bidding Schedule 

 

2.5.1 

The  following  schedule  is  a  tentative  milestone  for  the  eventual  Contract  and  may  be 
changed at KARI’s sole discretion:   

 

[1] 

Bid Notice and RFP Release: T0   

[2] 

Bid Closing Date: T1 = T0 + 30 calendar days 

[3] 

Evaluation of Proposal: T2 = T1 + 10 calendar days 

[4] 

Expected Contract Date: T3 = T2 + 10 calendar days   

 
2.6 

Questions and Modifications 

 
2.6.1
 

Any questions as to the intent and clarity of the RFP may be directed to KARI’s point of 
contact as specified in Section 2.4.4 & 2.4.5 of the Part II of this RFP by e-mail, and shall be 
received no later than five (5) days before the Bid Closing Date. 

 

2.6.2   

KARI  may  ask  a  Bidder  in  writing  for  clarifications,  amendments,  revisions,  or 
supplementation of the Proposal  and  any other documents  submitted  by  Bidder  at any 
time before the execution of the Contract. KARI may also ask Bidder to submit and supply 
additional information or documents necessary for evaluation of the Proposal. 

 

2.6.3 

After the Bid Closing Date, Bidder shall not amend, modify, or supplement the Proposal, or 
submit any other documents to KARI, except with KARI's written request.   

 
2.7 

Acceptance/Rejection of Bids 

 

KARI reserves the right to accept or reject any Bidding, and to amend the Bidding process and reject 
all Biddings at any time prior to the award of the Contract without thereby incurring any liability to 
the affected Bidder, and KARI is not under any obligation to inform the affected Bidder of the ground 
for its action. 

 
2.8 

Evaluation of Proposal 

 

The  evaluation  of  the  Proposals  will  be  made  by  the  evaluation  committee,  which  will  be  acting 
through KARI. 

 
 


background image

Page  11 

  Multi-material topology optimization for the light weight design of an electric engine   

Request for Proposal 

 

Use or disclosure of the data contained on this sheet is subject to the restriction on the title page 

The following evaluation process is for information only, and the evaluation committee reserves the 
right to modify the evaluation process and criteria without any prior notification to Bidders. 

 

2.8.1 

Evaluation Process 

 

2.8.1.1 

During the Bid evaluation, KARI may send to Bidders a set of questions for clarification and 
request any supplement to the Proposals and the evaluation will be made based on the 
Proposal, the answers to KARI questions and the supplement received from Bidders. The 
Proposal which is improvable, unrealistic, unreliable or based on vague presumptions shall 
not get good scores.   

   

2.8.1.2 

The evaluation shall be in two (2) stages: the technical evaluation and the price evaluation.   
First, technical proposals shall be evaluated by the evaluation committee in order to select 
the Bidders technically qualified to perform the work under this RFP. The total score for 
technical proposal is one hundred (100) points and the Bidders with eighty (80) points or 
higher shall be considered in the next stage of price evaluation. In the second stage, the 
Bidder  with  the  lowest  bid  price  which  shall  be  less  than  or  equal  to  KARI’s  estimated 
budget will be selected as the Successful Bidder. 

 

2.8.1.3 

Subject  to  an  evaluation  of  the  Proposal,  the  evaluation  committee  will  judge  whether 
Bidder provides Proposal enough to meet the requirements in this RFP. 

 

2.8.1.4 

The  result  of  evaluation  is  at  the  proposal  evaluation  committee’s  discretion  based  on 
evaluation  process  and  Bidders  shall  not  raise  any  objection  regarding  the  proposal 
evaluation committee’s decision thereupon. 

 
2.9 

Contract 

 

2.9.1   

The Terms and Conditions as presented in Annex B of this RFP is the baseline requirement 
for the Contract with the Successful Bidder, and will be the basis of the Contract. 

 
2.10  Language and Measurement Unit 
 

2.10.1 

The Proposal and any documents submitted to KARI under the RFP and communication 
and the Contract language shall be in English. 

 

2.10.2 

"Système  Internationale"  (SI,  hereafter)  units  shall  be  used  for  measurements  and 
quantities in the Proposal and all the accompanying documents. However, British unit of 
power and weight could be used as a complementary unit. In this case, SI unit comes first 
and British unit shall be put in parentheses. 

 
2.11  Pricing Requirements 
 


background image

Page  12 

  Multi-material topology optimization for the light weight design of an electric engine   

Request for Proposal 

 

Use or disclosure of the data contained on this sheet is subject to the restriction on the title page 

2.11.1 

Any price  or  rate  for  Contract  shall  be  firm  and fixed, not  subject to  change  for  a  price 
escalation for the entire period of the Contract. Therefore, the proposed price shall reflect 
possible fluctuations in labor costs, material prices and others. The Contractor shall not 
demand to reflect the fluctuation on the Contract.   

 

2.11.2 

Any kinds of taxes and duties arising in connection with Bidder’s work under this RFP and 
under the eventual Contract shall be Bidder’s responsibility, except for the customs duties 
and VAT levied in Korea and the price shall be inclusive of any cost or charge incurred due to 
delivery of any hardware, software, equipment, spare parts, 

and documentation to KARI or its 

designated point of delivery. 

 

2.11.3    The currency quoted in the Price Proposal shall be expressed in the same currency used in 

KARI’s  bid  notice  for  this  RFP.  However,  other  currency  may  be  allowed.  If  Bidder’s 
proposed price is in a currency other than the currency of the estimated budget specified 
in KARI’s bid notice of this RFP, then for the conversion of the Bidder’s proposed price, the 
1st basic exchange rate announced by KEB Hana Bank on the price evaluation date shall be 
used. 

 

2.11.4    Likewise, the currency of the Contract  may be Contractor’s national currency within the 

value of Bidder’s bid price, in which case, the 1st basic exchange rate announced by KEB 
Hana  Bank  on price evaluation  date  shall  be applied  for the  exchange  rate  for  currency 
change. 

 

2.11.5 

Bidder  shall  include  all  cost  items  to  cover  all  activities  in  the  Proposal  and  itemize 
requested items.   

 

2.11.6 

Korean corporation tax (hereinafter referred to as ‘Applicable Tax’) in Korea will be withheld 
under  the  Contract.  Therefore,  KARI  shall  withhold  the  Applicable  Tax  and  pay  to  the 
relevant  Korean  taxing  authority  on  behalf  of  Contractor  in  accordance  with  applicable 
Korean law and international tax treaty between Korea and Bidder’s country. After paying 
the Applicable Tax to the relevant Korean taxing authority, KARI will convey the certificate 
of the withholding Tax to Contractor within ninety (90) days of such payment.   

 
2.12  Confidentiality 
 

2.12.1 

There  shall  be  no  news  releases,  public  announcements,  denials  or  confirmation  in 
connection with this RFP or contract award without prior written approval of KARI. Also, 
Bidder shall not disclose any part of this RFP to third parties without prior written approval 
of KARI. 

 

2.12.2 

All documentation submitted in response to this RFP shall be marked "COMMERCIALS-IN-
CONFIDENCE" on the first page of each document. All elements of the RFP shall be kept 
confidential, and shall not be intentionally disclosed by Bidder to third parties. 

 


background image

Page  13 

  Multi-material topology optimization for the light weight design of an electric engine   

Request for Proposal 

 

Use or disclosure of the data contained on this sheet is subject to the restriction on the title page 

2.13  Proprietary Rights 
 

KARI shall have the irrevocable, royalty-free, and exclusive right to use any data and the results of 
the multi-material topology optimization for the light weight design of an electric engine. 

 
2.14  Withdrawal of Proposal 
 

Bidder may withdraw its Proposal at any time before the Bid Closing Date. Withdrawal shall be made 
in writing, and shall be received by KARI before the Bid Closing Date. 

 
2.15  Property of Proposal 
 

All  documents  submitted  in  response  to  the  RFP  shall  become  the  property  of  KARI  and  will  be 
retained by KARI. 

 
2.16  Expenses 
 

Expenses  incurred  by  Bidder  in  connection  with  the  preparation,  submittal,  and  any  subsequent 
clarification  or  any  other  activities  for  this  Bidding  are  for  their  own  account  and  will  not  be 
reimbursed by KARI. 

 
2.17  Governing Law 
 

This RFP and the Contract shall be construed in accordance with and governed by the laws of the 
Republic of Korea. 

 
2.18  Certificate and Government Approval   
 

Bidders  shall  obtain  the  government  approval  and  certificates  (e.g.  export  licenses)  in  relevant 
countries, if any, necessary for Bidder's work for this Proposal. Bidder's ability and plan to get such 
approval and certificates shall be submitted to KARI, together with any appropriate assurance letters 
from the relevant governments, in the proposal. 

 
2.19  Arbitration 
 
Any  disputes  arising  out  of  or  in  connection  with  this  RFP  and  Contract  shall  be  finally  settled  by 
arbitration  in  Seoul,  Korea,  in  accordance  with  the  International  Arbitration  Rules  of  the  Korean 
Commercial Arbitration Board. 
 


background image

Multi-material topology optimization for light weight design of electric engine   

Request for Proposal 

 

Use or disclosure of the data contained on this sheet is subject to the restriction on the title page 

 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

This page is intentionally left blank.

 

 

 


background image

Page  15 

  Multi-material topology optimization for the light weight design of an electric engine   

Request for Proposal 

 

Use or disclosure of the data contained on this sheet is subject to the restriction on the title page 

 
 
 
 
 
 
 

Part III. Technical Requirements 

 
 

 

 


background image

Page  16 

  Multi-material topology optimization for the light weight design of an electric engine   

Request for Proposal 

 

Use or disclosure of the data contained on this sheet is subject to the restriction on the title page 

 
 
 
 
 
 
 
 
 
 
 
 
 
 

This page is intentionally left blank. 


background image

Page  17 

  Multi-material topology optimization for the light weight design of an electric engine   

Request for Proposal 

 

Use or disclosure of the data contained on this sheet is subject to the restriction on the title page 

3.1 

Project Information 

 

A Hybrid Electric Propulsion (HEP) system development project launched in 2021 is a basic technology 
R&D project which is led by Korea Aerospace Research Institute and funded by the ROK government. 
This  project  was  initiated  by  the  needs  of  adopting  a  gas  turbine  engine  based-hybrid  electric 
propulsion system for a long endurance and high payload eVTOL (e-Vertical Take-Off and Landing). All 
electric VTOL is known as to have limitations of payload and range due to restricted energy density of 
Li-Ion  battery.  The  goal of  this  project  covers to  establish  an  optimal  design  of the  hybrid  electric 
propulsion system and to do the HEP system performance test at a newly constructed ground test 
facility. The HEP system has many components such as a turboshaft engine, a generator, a rectifier, 
several battery packs, motors, inverters, heat exchangers, and etc. It requires the light weight design 
using DfAM (Design for Additive Manufacturing). Therefore, this technical project will cover the multi-
material topology optimization for the light weight design of an electric engine.   

   

 
3.2  Introduction 
 

3.2.1    Conceptual design of a hybrid propulsion system 

 

A schematic design of a series hybrid propulsion system is shown in Fig. 1, and in general, the system 
features  a  couple  of  cruise  propellers  (or  prop-rotors)  and  several  lift  prop-rotors.  Each  cruise 
propeller or lift prop-rotor connects to an electric motor and an inverter which are installed in an 
electric engine nacelle as shown in Fig. 1.   

 

 

Figure 1. Schematic of HEP system 

 

3.2.2    Electric Engine   

 


background image

Page  18 

  Multi-material topology optimization for the light weight design of an electric engine   

Request for Proposal 

 

Use or disclosure of the data contained on this sheet is subject to the restriction on the title page 

An electric engine (EE) is installed in an engine nacelle and rotates the prop-blades as shown in Fig. 2. 
An eVTOL for Advanced Air Mobility generally has distributed propulsion system, which has multiple 
prop-rotors due to high safety requirement, and is expected to experience various loading condition 
due to vertical take-off/landing, transition, and cruise conditions. Therefore, it is important to have 
robust and light weight design under complex loading conditions. 

 

 

Figure 2. Example of electric engine nacelles 

 

 


background image

Page  19 

  Multi-material topology optimization for the light weight design of an electric engine   

Request for Proposal 

 

Use or disclosure of the data contained on this sheet is subject to the restriction on the title page 

 
 
 
 
 
 
 

Part IV. Statement of Work 

 
 

 


background image

Page  20 

  Multi-material topology optimization for the light weight design of an electric engine   

Request for Proposal 

 

Use or disclosure of the data contained on this sheet is subject to the restriction on the title page 

 
 
 
 
 
 
 
 
 
 
 
 
 
 

This page is intentionally left blank. 

 
 

 

 


background image

Page  21 

  Multi-material topology optimization for the light weight design of an electric engine   

Request for Proposal 

 

Use or disclosure of the data contained on this sheet is subject to the restriction on the title page 

4.1  Overview   
 

This section defines the work to be performed by the Contractor, including the provision of reports 
and data for the multi-material topology optimization for the light weight design of an electric engine. 
The contents, which will be included in a contract document, will be determined based on this RFP 
and the Contractor's Proposal. 

 

 
4.2  General Description 
 

The  goal  of  this  project  is  to  define  the  enhanced  mathematical  model  and  formulation  for  light 
weight design based on the KARI’s request, and to solve the optimization problem with advanced in-
house code that the contractor has. Finally, the optimized geometry shall be proposed.   

 

 
4.3  Multi-material topology optimization of an electric engine 
 

4.3.1  KARI will provide the detailed geometry of an electric engine as shown in Fig. 3, and the shaft 

and stator geometry, respectively. 

 

   

 

Fig. 3. Geometry of an electric engine and design domains (green and blue area) 

 

4.3.2 

The contractor shall define the design domain of the electric engine from the CAD model 
provided from KARI and shall consider the axisymmetric layout of the rotor and stator of the 
electric engine. 

 

4.3.3 

The  contractor  shall  define  the  mathematical  problem  for  multi-material  topology 
optimization of the electric engine for light weight design, and the formulation shall consider 
structural integrity and vibration characteristics. However, these performance functions are 
not limited. 

 


background image

Page  22 

  Multi-material topology optimization for the light weight design of an electric engine   

Request for Proposal 

 

Use or disclosure of the data contained on this sheet is subject to the restriction on the title page 

4.3.4 

KARI will provide the various loading conditions generated from the prop-blades during a 
variety of operation conditions. 

 

 

Fig. 4. Loading conditions from prop-blades 

 

4.3.5 

If necessary, the contractor shall customize the in-house code that the contractor has been 
developing, and then solve the multi-material topology optimization problem. 

 

4.3.6 

The  contractor  shall  post-process  the  optimized  geometry  and  shall  propose  both  of  the 
interim design of the electric engine and the next process for optimizing the full model of 
the electric engine rotor and shaft. 

 

 
4.4  Schedule of Works 
 

Time* 

Event 

Within one week after 
contract 

KARI provide document for design of an electric 
engine   

November, 2024 

Kick-off meeting 

November, 2024 

Interim presentation 

One week before final 
meeting 

Submission of final report 

Early of December, 2024 

Final presentation 

18st December, 2024 

End of Contract 

 

    *) Earlier is better 

 

4.4.1 

Kick off meeting shall be performed at the Contractor site but it can be changed. (exact date 
will be determined later). 

 

4.4.2    Final meeting shall be held at the KARI. (exact date and location will be fixed later) 
 

 


background image

Page  23 

  Multi-material topology optimization for the light weight design of an electric engine   

Request for Proposal 

 

Use or disclosure of the data contained on this sheet is subject to the restriction on the title page 

4.5    Kick-off and final meeting 
 

4.5.1 

The Contractor shall prepare for kick-off and final meeting as stated in 4.4. A meeting room 
for kick-off meeting shall be prepared by Contractor, if it is held at the Contractor’s location, 
and the meeting room shall be equipped with free WIFI.   

 

4.5.2 

To leave an evidence for kick-off and final meetings, lecture materials presented during kick-
off meeting and final meeting shall be provided to KARI in electronic file format. 

 

4.5.3    If sensitive information is included, it should be removed and provided to KARI. 

 

 
4.6    Deliverable Items 
 

The following items written in English should be submitted to KARI.   
 

(a)  The optimization report;   

(b) Advisory review report; and 

(c)  Other materials relevant for the performance of Contract such as presentation slides. 

 

The  optimization  report and  Advisory review  report  shall  be  submitted  one  week  before  the final 
meeting and prepared in MS Word or MS Power Point format. 

 

For late delivery of the report above, the liquidated damages for delay shall apply. 

 

 
 

 


background image

Multi-material topology optimization for light weight design of electric engine   

Request for Proposal 

 

Use or disclosure of the data contained on this sheet is subject to the restriction on the title page 

 

 
 
 
 
 
 
 
 
 
 
 
 
 
 

This page is intentionally left blank. 

 

 


background image

Page  25 

  Multi-material topology optimization for the light weight design of an electric engine   

Request for Proposal 

 

Use or disclosure of the data contained on this sheet is subject to the restriction on the title page 

 

 

 
 
 
 
 
 

Annex A. Suggested Proposal 

 

 


background image

Page  26 

  Multi-material topology optimization for the light weight design of an electric engine   

Request for Proposal 

 

Use or disclosure of the data contained on this sheet is subject to the restriction on the title page 

 
 
 
 
 
 
 
 
 
 
 
 
 
 

This page is intentionally left blank. 

 
 

 


background image

Page  27 

  Multi-material topology optimization for the light weight design of an electric engine   

Request for Proposal 

 

Use or disclosure of the data contained on this sheet is subject to the restriction on the title page 

1. Volume 1 : EXECUTIVE SUMMARY 
 

This volume shall describe Bidder’s introduction and Proposal summary. The Bidder’s experience for 
the consulting work relevant to the multi-material topology optimization for the light weight design 
of an electric engine should be included. Bidder shall describe current or past work similar to this RFP, 
which is being implemented or has been done by Bidder. 

 

 
2. Volume 2 : TECHNICAL PROPOSAL 
 

Bidder shall describe technical information, methodology, analysis, performance, and etc. to comply 
with  RFP  requirements.  Bidder  shall  describe  this  technical  proposal  with  as  many  illustrations  as 
possible to make it clear.   

 

 
3. Volume 3 : STATEMENT OF WORK PROPOSAL 
 

Bidder shall submit Statement of Work proposal in this volume. Bidder shall describe work scope of 
the Bidder for key topics in detail including the respective plan. In order to substantiate a proposal, 
all relevant data shall be submitted as attachments. The proposal which is improvable or based on 
vague presumptions shall be excluded. The basic unit shall be SI unit. British unit of power and weight 
could be used as a complementary unit. SI unit comes first and British unit shall be put in parentheses. 

 

 
4. Volume 4 : PRICE PROPOSAL 
 

Bidder  shall  submit  Price  Proposal  in  this  volume.  In  this  volume,  Bidder  shall  provide  the  price 
breakdown of the price proposed by the Bidder in detail. Price shall be proposed in Korean WON and 
the proposed price shall reflect possible fluctuations in labor costs, material prices and others in the 
proposed price. And Bidder shall seal and submit this Price Proposal in separate.   

 
 

 


background image

Multi-material topology optimization for light weight design of electric engine   

Request for Proposal 

 

Use or disclosure of the data contained on this sheet is subject to the restriction on the title page 

 

 
 
 
 
 
 
 
 
 
 
 
 
 
 

This page is intentionally left blank. 

 

 


background image

Page  29 

  Multi-material topology optimization for the light weight design of an electric engine 

Request for Proposal 

 

Use or disclosure of the data contained on this sheet is subject to the restriction on the title page 

 
 
 
 
 
 
 

Annex B. Terms and Conditions 

 

 


background image

Page  30 

  Multi-material topology optimization for the light weight design of an electric engine 

Request for Proposal 

 

Use or disclosure of the data contained on this sheet is subject to the restriction on the title page 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

This page is intentionally left blank. 

 

 


background image

http://www.kari.re.kr 

169-84 Gwahak-ro, Yuseong-gu, Daejeon, 34133, Republic of Korea 
Telephone: +82-42-860-2406    Fax : +82-42-879-4370 

Page  31 

 

 

 

  Multi-material topology optimization for the light weight design of an electric engine   

Request for Proposal 

 

Use or disclosure of the data contained on this sheet is subject to the restriction on the title page 

 

[TBD], 2024 

 
[Name] 
[Title] 
 
[Contractor name] 
[Address] 
 
Tel: [TBD]     
e-mail: [TBD] 
 
Subject: Purchase Order (“PO”) No. KARI-24-[TBD] for for the multi-material topology optimization 

for the light weight design of an electric engine 

 
Dear [TBD]
 
Korea  Aerospace  Research  Institute  (hereinafter  “KARI”)  hereby  places  an  order  with  [Contractor] 
(hereinafter “Contractor”) for following service in accordance with Attachment B “Statement of Work” 
based on the terms and conditions below. Please provide your acknowledgement by signature after 
receipt of the PO with KARI’s signature, and send us by e-mail the fully signed PO and proceed the 
work at your earliest convenience.   
 
A. Order Information: As per the Contractor’s proposal submitted to KARI dated [TBD], 2024 

-  Total Price: KRW [TBD] (firm and fixed; Korean Value-Added Tax (VAT) not included) 
-  Item:  Multi-material  topology  optimization  for  the  light  weight  design  of  an  electric  engine 

(hereinafter referred to as “the Task”) in accordance with Attachment B “Statement of Work”. 

 

 

Description 

Price (KRW) 

Task 

Multi-material topology optimization for the light weight design of 
an electric engine in accordance with Attachment A & B   

[TBD] 

Total Price (firm and fixed) 

[TBD] 

 
B. Terms of Payment   

No. 

Milestone 

Payment Due date 

Price (KRW) 

Percentage 

(%) 

P-Bond (Section F) + Kick-off 
meeting 

Milestone completion 
+ 30 days 

[TBD] 

30 

Receipt of the Task Reports 

Receipt of Task Report 
+ 30 days 

[TBD] 

70 

Total Price (firm and fixed) 

[TBD] 

100 

 


background image

http://www.kari.re.kr 

169-84 Gwahak-ro, Yuseong-gu, Daejeon, 34133, Republic of Korea 
Telephone: +82-42-860-2406    Fax : +82-42-879-4370 

Page  32 

 

 

 

  Multi-material topology optimization for the light weight design of an electric engine   

Request for Proposal 

 

Use or disclosure of the data contained on this sheet is subject to the restriction on the title page 

 
-  The  payment  shall  be  made  by  wire  transfer  to  the  bank  account  below  as  designated  by 

Contractor,  within  thirty  (30)  days  after  receipt  of  payment  invoice  and  completion  of  each 
milestone. 

-  All  banking  charges  incurred  in  Korea  shall  be  borne  by  KARI,  and  those  charges  incurred 

outside of Korea shall be borne by Contractor.   

 
-  Bank account information for payment to Contractor 

Beneficiary‘s  bank  including  branch 
name and address 

 

SWIFT/BIC/Routing No./Transit No./ABA 
No., etc. 

 

Beneficiary‘s Name 

 

Account Number/IBAN 

 

 
C. Taxes 

-  Korean VAT is not included in Contract Price and shall be the responsibility of KARI. 
-  Unless  it  is  proved  that  Contract  Price  under  this  PO  is  not  taxable  in  Korea  as  Korean 

corporation tax (herein referred to as ‘Applicable Tax’), such tax will be withheld by KARI and 
KARI shall pay to the relevant Korean taxing authority on behalf of Contractor  as required in 
accordance  with  the  applicable  Korean  law  and  international  tax  treaty  between  the 
governments of Korea and [TBD]. In such case, KARI shall forward the certificate for payment 
of the withheld tax to Contractor within ninety (90) days of such payment.   

-  KARI shall be responsible for customs duties and VAT on the Deliverable Items levied by Korean 

tax authority.   

 

D. Deliverable Items (Document) and Intellectual Property Rights 

-  The  list  of  Deliverable  Items  and  due  dates  for  each  Deliverable  Item  are  as  set  forth  in 

Attachment B “Statement of Work”. 

-  The Deliverable Items shall be the property of KARI. 
-  KARI shall have an irrevocable, royalty-free, and exclusive licence to use any data included in 

the Deliverable Items necessary for the purpose of this PO.   

 

E. Delivery term   

-  The Deliverable Items shall be provided to the following KARI persons by e-mail; 

Dr. Jae-Sung HUH (jshuh@kari.re.kr), and Dr. Sangook Jun (sangookjun@kari.re.kr).   

 
F. Performance bond   

-  Contractor shall establish a performance bond in favor of KARI in the value of ten percent (10 %) 

of the Total Price, in the form of an irrevocable and unconditional standby letter of credit or 
bank guarantee available by KARI’s draft at sight, or shall deposit the amount equivalent to ten 
percent (10 %) of the Total Price to the following account as security for performance. 

 


background image

http://www.kari.re.kr 

169-84 Gwahak-ro, Yuseong-gu, Daejeon, 34133, Republic of Korea 
Telephone: +82-42-860-2406    Fax : +82-42-879-4370 

Page  33 

 

 

 

  Multi-material topology optimization for the light weight design of an electric engine   

Request for Proposal 

 

Use or disclosure of the data contained on this sheet is subject to the restriction on the title page 

 

Beneficiary‘s bank 
including address 

Woori  Bank,  Daejeon  Banking  Center,  located  at  1495,  Doonsan-
dong, Yusung-gu, Dajeon, Republic of Korea 

SWIFT Code 

HVBKKR SEXXX 

Beneficiary‘s Name 

Korea Aerospace Research Institute 

Account Number 

1081-600-247322 

 
-  If Contractor fails in performance of this Contract, including failure to obtain any export licence 

required for the purpose of this Contract, the performance bond will be confiscated by KARI as 
liquidated damages. In case of a letter of credit, the bond shall be available by KARI’s draft at 
sight without any further requirements other than KARI’s presentation of the statement that: 
there was a default of the Contractor in the performance of the Contract. 

-  The  performance  bond  shall  remain  valid  until  the  end  of  the  warranty  period  indicated  in 

Section H. “Warranty”.   

 

G. Liquidated damages   

-  Liquidated damages to be applied for late delivery of the Deliverable Items in accordance with 

Attachment B “Statement of Work” at the rate of zero point one two five percent (0.125%) of 
Total Price per day, up to thirty percent (30%) of Total Price in maximum. 

 

H. Warranty   

-  The warranty period shall be one (1) year from the delivery date of Deliverable Items by e-mail. 

 

I. Confidentiality   

-  Contractor shall not, in any manner, advertise, publish or release any information related to 

this  Purchase  Order  or  the  work  performed  or  to  be  performed  hereunder  without  prior 
approval of KARI. 

 

J. Governing Law and Resolution of Dispute 

-  This PO  shall be  construed  in  accordance  with  and  governed by the  laws  of the  Republic of 

Korea and any disputes between both Parties arising out of or in connection with this PO shall 
be finally settled by arbitration in Seoul, Korea, in accordance with the International Arbitration 
Rules of the Korean Commercial Arbitration Board. 

 

K. Point of Contact in KARI 

Contractual Matters 

Technical Matters 

Name : Mr. Eun-Jung Lee 

Name : Dr. Jae Sung Huh 

Tel :      +82-42-860-2148 

Tel :      +82-42-860-2831 

e-mail : monicalee@kari.re.kr                                 

e-mail : jshuh@kari.re.kr 

 
 
 


background image

http://www.kari.re.kr 

169-84 Gwahak-ro, Yuseong-gu, Daejeon, 34133, Republic of Korea 
Telephone: +82-42-860-2406    Fax : +82-42-879-4370 

Page  34 

 

 

 

  Multi-material topology optimization for the light weight design of an electric engine   

Request for Proposal 

 

Use or disclosure of the data contained on this sheet is subject to the restriction on the title page 

 
Thank you in advance for your cooperation.   
 
 
Sincerely yours,   

 
cc : Mr. Won-Suk LEE 
 
Attachment A. Technical Requirements 
Attachment B. Statement of Work 

Korea Aerospace Research Institute 

P.O acknowledged by: [TBC] 

 
 
 
NAME: TBD 
Title: TBD / Overseas Contracts Office 
Date: TBD 

 
 
 
Name: TBD   
Title: TBD / Division 
Date: TBD 


background image

 

  Multi-material topology optimization for the light weight design of an electric engine   

Request for Proposal 

 

Use or disclosure of the data contained on this sheet is subject to the restriction on the title page 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

The End of Documents