KARI proprietary
The data/information contained in this document shall not be disclosed, disseminated or reproduced, in whole or in part,
without the express prior written approval of KARI.
REQUEST FOR PROPOSAL
THERMAL PACKAGE OPTIMIZATION &
CABLE/PIPE ROUTING DESIGN FOR
ENGINE NACELLE
March 22, 2023
Korea Aerospace Research Institute
169-84 Gwahak-ro, Yuseong-gu,
Daejeon, 34133, Republic of Korea
KARI proprietary
The data/information contained in this document shall not be disclosed, disseminated or reproduced, in whole or in part,
without the express prior written approval of KARI.
This page is intentionally left blank.
i
Thermal Package Optimization and Cable/Pipe Routing Design for Engine Nacelle
Request for Proposal, Table of Contents
Use or disclosure of the data contained on this sheet is subject to the restriction on the title page
Table of Contents
PART II. GENERAL INSTRUCTION TO BIDDER....................................................6
2.10 LANGUAGE AND MEASUREMENT UNIT........................................................................12
2.11 PRICING REQUIREMENTS..........................................................................................13
2.12 CONFIDENTIALITY....................................................................................................14
2.13 PROPRIETARY RIGHTS..............................................................................................14
2.14 WITHDRAWAL OF PROPOSAL.....................................................................................14
2.15 PROPERTY OF PROPOSAL..........................................................................................14
2.16 EXPENSES..............................................................................................................14
2.17 GOVERNING LAW....................................................................................................14
2.18 CERTIFICATE AND GOVERNMENT APPROVAL..................................................................14
2.19 ARBITRATION.........................................................................................................15
PART III. TECHNICAL REQUIREMENTS FOR CONTRACT...................................17
PART IV. STATEMENT OF WORK....................................................................21
ii
Thermal Package Optimization and Cable/Pipe Routing Design for Engine Nacelle
Request for Proposal, Table of Contents
Use or disclosure of the data contained on this sheet is subject to the restriction on the title page
THERMAL PACKAGE OPTIMIZATION & CABLE/PIPE ROUTING DESIGN.................................23
MEETING ROOM FOR KICK-OFF AND FINAL MEETINGS......................................................25
ANNEX A. SUGGESTED PROPOSAL.................................................................27
ANNEX B. TERMS AND CONDITIONS..............................................................31
1
Thermal Package Optimization and Cable/Pipe Routing Design for Engine Nacelle
Request for Proposal, Table of Contents
Use or disclosure of the data contained on this sheet is subject to the restriction on the title page
Part I. Introduction
Page 2
Thermal Package Optimization and Cable/Pipe Routing Design for Engine Nacelle
Request for Proposal, Part I
Use or disclosure of the data contained on this sheet is subject to the restriction on the title page
This page is intentionally left blank.
Page 3
Thermal Package Optimization and Cable/Pipe Routing Design for Engine Nacelle
Request for Proposal, Part I
Use or disclosure of the data contained on this sheet is subject to the restriction on the title page
1.1
Aircraft Electric Engine Development Project
Korea Aerospace Research Institute (hereinafter “KARI”), a government-funded research institute is
responsible for the development of aircraft electric engine.
1.2
Objective of RFP
KARI is issuing this Request for Proposal (hereinafter “RFP”) to Bidders who are willing to collaborate
with KARI in successfully performing the thermal package optimization and cable/pipe routing design
for engine nacelle. This RFP document explains the procedures to be undertaken by Bidders seeking
to respond to the RFP for related services. This RFP also details the requirements, terms, and
conditions for the proposal and contract.
1.3
Contract Concepts
In the phase of the issuance of RFP, this RFP is written and issued by KARI. the contract will be made
with one contractor who satisfies the scope of RFP with the experience and ability of research and
submit the lowest bid price.
In the evaluation and contract phases, Bidder’s Proposal will be evaluated by the evaluation
committee according to the related rules.
1.4
Schedule of Contract
2023. 4 [TBC] : Completion of contract between KARI and bidder [TBC]
2023. 4 [TBC] : Kick-off meeting [TBC]
2023. 7 [TBC] : Interim presentation [TBC]
2023. 10 [TBC] : Submission of final report [TBC]
2023. 11 [TBC] : Final presentation [TBC]
1.5
Terminology
Unless otherwise specified elsewhere, the following terms as used herein shall have the meaning as
assigned to them:
1.5.1
Bid means solicitation of KARI for the submittal of the Proposal in response to the RFP.
1.5.2
Bidder(s) means person(s) or corporation(s) who submits the Proposal in response to the
RFP.
1.5.3
Contract means a contract to be executed between KARI and Contractor for Thermal
Page 4
Thermal Package Optimization and Cable/Pipe Routing Design for Engine Nacelle
Request for Proposal, Part I
Use or disclosure of the data contained on this sheet is subject to the restriction on the title page
Package Optimization and Cable/Pipe Routing Design for Engine Nacelle pursuant to the RFP.
1.5.4
Contractor means the party who has entered into the Contract.
1.5.5
KARI means Korea Aerospace Research Institute as designated by the government of the
Republic of Korea (“Korea”) for the issuance of the RFP.
1.5.6
Proposal means any set of documents effectively submitted by a Bidder in response to this
RFP.
1.5.7
RFP or Request for Proposal means all documents, including those attached or incorporated
by reference, used for soliciting Proposal as set forth in Section 2.2 (Structure of the RFP) of
Part II of the RFP.
1.5.8
Successful Bidder means the Bidder with the lowest Bid Price in the price evaluation, after
having passed technical evaluation, who is expected to formalize a Contract in Annex B
hereof.
1.5.9
TBD means “To Be Determined” by KARI before the award of the Contract.
1.5.10 TBC means “To Be Confirmed” mutually by KARI and Bidder as to any requirements
suggested.
5
Thermal Package Optimization and Cable/Pipe Routing Design for Engine Nacelle
Request for Proposal, Table of Contents
Use or disclosure of the data contained on this sheet is subject to the restriction on the title page
Part II. General Instruction to Bidder
Page 6
Thermal Package Optimization and Cable/Pipe Routing Design for Engine Nacelle
Request for Proposal, Part II
Use or disclosure of the data contained on this sheet is subject to the restriction on the title page
This page is intentionally left blank.
Page 7
Thermal Package Optimization and Cable/Pipe Routing Design for Engine Nacelle
Request for Proposal, Part II
Use or disclosure of the data contained on this sheet is subject to the restriction on the title page
2.1
Purpose
This section describes the requirements for preparing and submitting the Bidder’s Proposals in
response to this RFP.
2.2
Structure of the RFP
This RFP consists of the following Parts:
Part I
Introduction
Part II
General Instruction to Bidders
Part III
Technical Requirements for Contract
Part IV
Statement of Work
Annex A.
Suggested Proposal
Annex B.
Terms and Conditions
Part I provides introduction to this RFP document.
Part II illustrates general instructions for the preparation and submission of the Proposal, and
principles of evaluation of the Proposal.
Part III outlines the key performance for thermal package optimization and cable/pipe routing design
for engine nacelle.
Part IV states the Statement of Work, which shall be provided by the Contractor to KARI during the
entire course of Contract. This Statement of Work will be the baseline for the Contract.
Annex A outlines the Bidder how to develop the Proposal.
Annex B presents the baseline of the general terms and conditions, which is the basic guideline for the
Bidder to prepare the Proposals and for KARI, and the Contractor to form the Contract.
2.3
Qualification of Bidder
2.3.1
Bidder shall have demonstrated track records in thermal package optimization and
cable/pipe routing design for engine nacelle.
2.3.2
The qualifying statement for the above requirements and support materials shall be
provided in the Proposal.
Page 8
Thermal Package Optimization and Cable/Pipe Routing Design for Engine Nacelle
Request for Proposal, Part II
Use or disclosure of the data contained on this sheet is subject to the restriction on the title page
2.4
Submittal of Proposal
2.4.1
Proposal Documents
Bidder shall submit their Proposals in the following four (4) Volumes as presented in Annex A,
Suggested Proposal, with any other required certificate and evidences under the RFP.
Volume 1.
Capability and Experience
Volume 2.
Technical Proposal
Volume 3.
Statement of Work Proposal
Volume 4.
Price Proposal (to be sealed in a separate envelope)
The detailed instructions for each Volume can be founded in the Suggested Proposal given in Annex A
of this RFP. It is recommended that Bidders submit the Proposals in the same sequence as enlisted in
the Suggested Proposal.
A4 size paper shall be used. If the larger paper should be used for the explanation, foldout can be
used.
2.4.2
Number of Copies
Bidders shall submit one (1) original hardcopy marked as “ORIGINAL COPY” on the cover and six (6)
duplicate hardcopies, without Volume 4 Price Proposal. For Volume 4 Price Proposal, only one (1)
hardcopy shall be submitted in a separate envelope. In addition, the electronic files of the Proposal in
Microsoft Office Word for Windows and Portable Document Format (PDF) shall be submitted (except
for Volume 4 Price Proposal). In order to substantiate a Proposal, all relevant data shall be submitted
as attachments.
In case of any discrepancy between the original copy and electronic file or the other hardcopies, the
original copy, which is marked as “ORIGINAL COPY” on the cover, shall prevail.
2.4.3
Bid Closing Date
The closing date and time for the Proposal is specified in the notice of this Bid (“Bid Closing Date”). If
any part of the Proposal or the bid bond as required under this RFP is received by KARI after the
stipulated closing time, the entire Proposal will be rejected.
2.4.4
Method of Submittal
The Proposal shall be hand-carried or delivered using a registered mail service to the following KARI
Page 9
Thermal Package Optimization and Cable/Pipe Routing Design for Engine Nacelle
Request for Proposal, Part II
Use or disclosure of the data contained on this sheet is subject to the restriction on the title page
personnel or his designee:
Mr. Won-Suk LEE
Overseas Contracts Office
Korea Aerospace Research Institute
169-84 Gwahak-ro, Yuseong-gu
Daejeon, 34133, Korea
Tel) +82-42-860-2406
e-mail) wsl@kari.re.kr
The communication between KARI and Bidder for contractual matters (Terms and Conditions) shall be
controlled through the following designee:
Ms. Ji-Young LIM
Overseas Contract Office
Korea Aerospace Research Institute
169-84 Gwahak-ro, Yuseong-gu
Daejeon, 34133, Korea
Tel) +82-42-860-2615
e-mail) jylim1@kari.re.kr
2.4.5
Point of Contact
Besides the Proposal submission, the point of contact for all communications for technical matters
shall be
Dr. Jae-Sung HUH
Aeropropulsion Research Division
Korea Aerospace Research Institute
169-84 Gwahak-ro, Yuseong-gu
Daejeon, 34133, Korea
Tel) +82-42-860-2831
e-mail) jshuh@kari.re.kr
with C.C to
Dr. Sangook Jun
Aeropropulsion Research Division
Page 10
Thermal Package Optimization and Cable/Pipe Routing Design for Engine Nacelle
Request for Proposal, Part II
Use or disclosure of the data contained on this sheet is subject to the restriction on the title page
Korea Aerospace Research Institute
169-84 Gwahak-ro, Yuseong-gu
Daejeon, 34133, Korea
Tel) +82-42-860-2237
e-mail) sangookjun@kari.re.kr
Bidder shall specify its single point of contact in the Volume I of its Proposal, “Capability and
Experience”, for KARI to communicate in connection with the RFP, Proposal and the subsequent
evaluation. Bidder’s information on the point of contact shall include the name, title/position,
telephone no., and e-mail address.
2.4.6
Bid Bond
Bidder shall establish a bid bond in accordance with the bid notice for this RFP.
2.5
Bidding Schedule
2.5.1
The following schedule is a tentative milestone for the eventual Contract and may be
changed at KARI’s sole discretion:
[1]
Bid Notice and RFP Release: T0
[2]
Bid Closing Date: T1 = T0 + 10 calendar days
[3]
Evaluation of Proposal: T2 = T1 + 10 calendar days
[4]
Expected Contract Date: T3 = T2 + 10 calendar days
2.6
Questions and Modifications
2.6.1
Any questions as to the intent and clarity of the RFP may be directed to KARI’s point of
contact as specified in Section 2.4.6 of the Part II of this RFP by e-mail or letter, and shal be
received no later than five (5) days before the Bid Closing Date.
2.6.2
KARI may ask a Bidder in writing for clarifications, amendments, revisions, or
supplementation of the Proposal and any other documents submitted by Bidder at any
time before the execution of the Contract. KARI may also ask Bidder to submit and supply
additional information or documents necessary for evaluation of the Proposal.
2.6.3
After the Bid Closing Date, Bidder shall not amend, modify, or supplement the Proposal, or
submit any other documents to KARI, except with KARI's written request.
2.7
Acceptance/Rejection of Bids
Page 11
Thermal Package Optimization and Cable/Pipe Routing Design for Engine Nacelle
Request for Proposal, Part II
Use or disclosure of the data contained on this sheet is subject to the restriction on the title page
KARI reserves the right to accept or reject any Bidding, and to amend the Bidding process and reject all
Biddings at any time prior to the award of the Contract without thereby incurring any liability to the
affected Bidder, and KARI is not under any obligation to inform the affected Bidder of the ground for
its action.
2.8
Evaluation of Proposal
The evaluation of the Proposals will be made by the evaluation committee, which will be acting
through KARI.
The following evaluation process is for information only, and the evaluation committee reserves the
right to modify the evaluation process and criteria without any prior notification to Bidders.
2.8.1
Evaluation Process
2.8.1.1
During the Bid evaluation, KARI may send to Bidders a set of questions for clarification and
request any supplement to the Proposals and the evaluation will be made based on the
Proposal and the answers and the supplement received from Bidders. The Proposal which
is improvable, unrealistic, unreliable or based on vague presumptions shall not get good
scores.
2.8.1.2
The evaluation shall be in two (2) stages: the technical evaluation and the price evaluation.
First, technical proposals shall be evaluated by the evaluation committee in order to select
the Bidders technically qualified to perform the work under this RFP. The total score for
technical proposal is one hundred (100) points and the Bidders with eighty (80) points or
higher shall be considered in the next stage of price evaluation. In the second stage, the
Bidder with the lowest bid price which shall be less than or equal to KARI’s estimated
budget will be selected as the Successful Bidder.
2.8.1.3
Subject to an evaluation of the Proposal, the evaluation committee will judge whether
Bidder provides Proposal enough to meet the requirements in this RFP.
2.8.1.4
The result of evaluation is at the proposal evaluation committee’s discretion based on
evaluation process and Bidders shall not raise any objection regarding the proposal
evaluation committee’s decision thereupon.
2.9
Contract
2.9.1
The Terms and Conditions as presented in Annex B of this RFP is the baseline requirement
for the Contract with the Successful Bidder, and will be the basis of the Contract.
2.10 Language and Measurement Unit
Page 12
Thermal Package Optimization and Cable/Pipe Routing Design for Engine Nacelle
Request for Proposal, Part II
Use or disclosure of the data contained on this sheet is subject to the restriction on the title page
2.10.1
The Proposal and any documents submitted to KARI under the RFP and communication and
the Contract language shall be in English.
2.10.2
"Système Internationale" (SI, hereafter) units shall be used for measurements and
quantities in the Proposal and all the accompanying documents. However, British unit of
power and weight could be used as a complementary unit. In this case, SI unit comes first
and British unit shall be put in parentheses.
2.11 Pricing Requirements
2.11.1
Any price or rate for Contract shall be firm and fixed, not subject to change for a price
escalation for the entire period of the Contract. Therefore, the proposed price shall reflect
possible fluctuations in labor costs, material prices and others. The Contractor shall not
demand to reflect the fluctuation on the Contract.
2.11.2
Any kinds of taxes and duties arising in connection with Bidder’s work under this RFP and
under the eventual Contract shall be Bidder’s responsibility, except for the customs duties
and VAT levied in Korea and the price shal be inclusive of any cost or charge incurred due to
delivery of any hardware, software, equipment, spare parts,
and documentation to KARI or its
designated point of delivery.
2.11.3
The currency quoted in the Price Proposal shall be expressed in the same currency used in
KARI’s bid notice for this RFP. However, other currency may be allowed. If Bidder’s
proposed price is in a currency other than the currency of the estimated budget specified in
KARI’s bid notice of this RFP, then for the conversion of the Bidder’s proposed price, the 1st
basic exchange rate announced by of KEB Hana Bank on the price evaluation date shall be
used.
2.11.4
Likewise, the currency of the Contract may be Contractor’s national currency within the
value of Bidder’s bid price, in which case, the 1st basic exchange rate announced by KEB
Hana Bank on price evaluation date shall be applied for the exchange rate for currency
change.
2.11.5
Bidder shall include all cost items to cover the all activities in the Proposal and itemize
requested items.
2.11.6
Korean corporation tax (herein referred to as ‘Applicable Tax’) in Korea will be withheld
under the Contract. Therefore, KARI shall withhold the Applicable Tax and pay to the
relevant Korean taxing authority on behalf of Contractor in accordance with applicable
Korean law and international tax treaty between Korea and Bidder’s country. After paying
the Applicable Tax to the relevant Korean taxing authority, KARI will convey the certificate of
the withholding Tax to Contractor within ninety (90) days of such payment.
Page 13
Thermal Package Optimization and Cable/Pipe Routing Design for Engine Nacelle
Request for Proposal, Part II
Use or disclosure of the data contained on this sheet is subject to the restriction on the title page
2.12 Confidentiality
2.12.1
There shall be no news releases, public announcements, denials or confirmation in
connection with this RFP or contract award without prior written approval of KARI. Also,
Bidder shall not disclose any part of this RFP to third parties without prior written approval
of KARI.
2.12.2
All documentation submitted in response to this RFP shall be marked "COMMERCIALS-IN-
CONFIDENCE" on the first page of each document. All elements of the RFP shall be kept
confidential, and shall not be intentionally disclosed by Bidder to third parties.
2.13 Proprietary Rights
KARI shall have the irrevocable, royalty-free, and exclusive right to use any data and the results of
thermal package optimization and cable/pipe routing design for engine nacelle.
2.14 Withdrawal of Proposal
Bidder may withdraw its Proposal at any time before the Bid Closing Date. Withdrawal shall be made
in writing, and shall be received by KARI before the Bid Closing Date.
2.15 Property of Proposal
All documents submitted in response to the RFP shall become the property of KARI and will be
retained by KARI.
2.16 Expenses
Expenses incurred by Bidder in connection with the preparation, submittal, and any subsequent
clarification or any other activities for this Bidding are for their own account and will not be
reimbursed by KARI.
2.17 Governing Law
This RFP and the Contract shall be construed in accordance with and governed by the laws of the
Republic of Korea.
2.18 Certificate and Government Approval
Bidders shall receive the government approval and certificates (e.g. export licenses) in relevant
countries, necessary for Bidder's work for this Proposal. Bidder's ability and plan to get such approval
Page 14
Thermal Package Optimization and Cable/Pipe Routing Design for Engine Nacelle
Request for Proposal, Part II
Use or disclosure of the data contained on this sheet is subject to the restriction on the title page
and certificates shall be submitted to KARI, together with any appropriate assurance letters from the
relevant governments, in the proposal.
2.19 Arbitration
Any disputes arising out of or in connection with this RFP and Contract shall be finally settled by
arbitration in Seoul, Korea, under the in accordance with the International Rules of the Korean
Commercial Arbitration Board.
15
Thermal Package Optimization and Cable/Pipe Routing Design for Engine Nacelle
Request for Proposal, Table of Contents
Use or disclosure of the data contained on this sheet is subject to the restriction on the title page
Part III. Technical Requirements for Contract
Page 16
Thermal Package Optimization and Cable/Pipe Routing Design for Engine Nacelle
Request for Proposal, Part III
Use or disclosure of the data contained on this sheet is subject to the restriction on the title page
This page is intentionally left blank.
Page 17
Thermal Package Optimization and Cable/Pipe Routing Design for Engine Nacelle
Request for Proposal, Part III
Use or disclosure of the data contained on this sheet is subject to the restriction on the title page
3.1
Project Information
A Hybrid Electric Propulsion (HEP) system development project launched in 2021 is a basic technology
R&D project which is led by Korea Aerospace Research Institute and funded by the ROK government.
This project was initiated by the needs of adopting a gas turbine engine based-hybrid electric
propulsion system for a long endurance and high payload eVTOL (e-Vertical Take-Off and Landing). All
electric VTOL is known as to have limitations of payload and range due to restricted energy density of
Li-Ion battery. The goal of this project covers to establish an optimal design of the hybrid electric
propulsion system and to do the HEP system performance test at a newly constructed ground test
facility. The HEP system has many components such as a turboshaft engine, a generator, a rectifier,
several battery packs, motors, inverters, heat exchangers, and etc. It requires the layout design for
effective and compact package and simultaneously electrical/mechanical routing design such as wire
harness or pipeline for cooling. Therefore, this technical project will cover the packaging optimization
and the cable/pipe routing design of an engine nacelle.
3.2
Introduction
3.2.1 Conceptual design of a hybrid propulsion system
A schematic design of a series hybrid propulsion system is shown in Fig. 1, and in general, the system
features a couple of cruise propellers (or prop-rotors) and several lift prop-rotors. Each cruise
propeller or lift prop-rotor connects to an electric motor and an inverter which are installed in an
electric engine nacelle with accessary components for thermal management system and tilting
mechanism as shown in Fig. 2.
Figure 1. Schematic of HEP system
3.2.2 Electric Engine Nacelle
Various components such as a motor, inverter, heat exchanger, pump, fluid tank and fan are installed
inside the engine nacelle. It is important to package them compactly in a limited space, considering
their shapes and sizes. Additionally, during design, performance degradation due to heat generation
of each component and electrical/mechanical connection between components must be considered.
Page 18
Thermal Package Optimization and Cable/Pipe Routing Design for Engine Nacelle
Request for Proposal, Part III
Use or disclosure of the data contained on this sheet is subject to the restriction on the title page
Figure 2. Example of electric engine nacelles
Figure 3. Example of connecting between components
3.3
Scope of Work
Contractor shall perform the following works under the Contract with KARI and please refer to the
PART IV “Statement of Work” for more detailed performance.
Package for electric engine nacelle;
Conduction of the packaging design for compactness
Consideration for the thermal effect of components and the electrical/mechanical
connection
Simultaneous conduction of the packaging and routing design
19
Thermal Package Optimization and Cable/Pipe Routing Design for Engine Nacelle
Request for Proposal, Table of Contents
Use or disclosure of the data contained on this sheet is subject to the restriction on the title page
Part IV. Statement of Work
Page 20
Thermal Package Optimization and Cable/Pipe Routing Design for Engine Nacelle
Request for Proposal, Part IV
Use or disclosure of the data contained on this sheet is subject to the restriction on the title page
This page is intentionally left blank.
Page 21
Thermal Package Optimization and Cable/Pipe Routing Design for Engine Nacelle
Request for Proposal, Part IV
Use or disclosure of the data contained on this sheet is subject to the restriction on the title page
4.1
Overview
This section defines the work to be performed by the Contractor, including the provision of reports
and data for thermal package optimization and cable/pipe routing design for engine nacelle. The
contents, which will be included in a contract document, will be determined based on this RFP and
the Contractor's Proposal.
4.2
General Description
The goal of this project is to define the enhanced mathematical model and formulation for thermal
packaging optimization and cable/pipe routing design based on the KARI’s request, and to solve the
optimization problem with advanced in-house code that the Contractor has. Finally, the optimized
geometry and the next work scope shall be proposed.
4.3
Thermal Package Optimization & Cable/Pipe Routing Design
4.3.1
KARI will provide the detailed geometry of the electric engine nacelle and all components in
it, which could include a motor, inverters, a heat exchanger, at least two water pumps, a
water tank, a cooling fan, and etc., and will also give basic information from which the
Contractor can obtain thermal effects of them.
4.3.2
The Contractor should consider the routing problem of the wire harness and pipeline for
cooling.
- The electrical & mechanical inlet/outlet positions of each component are determined in
discussion with KARI.
- The routing design can use the open source such as Dijkstra or A* algorithm, and
concurrently or sequentially perform with the packaging design.
- High voltage wire harnesses and cooling lines have a circular cross-section and the
minimum bending radius. These values will be provided by KARI.
- The envelope of nacelle designed in KARI should be used for more realistic results.
- Not only 1:1 connection between components, but also 1:n connection shall be considered.
- The position and size of the brackets to fix the components and routing must also be
considered.
4.3.3
The Contractor should consider the thermal effect as follows during packaging design.
- The nacelle has the intake and exit, which the external air flows into and out of it.
- A cooling fan is installed inside the nacelle to supply the external air to the heat exchanger
(forced convection).
- The motor and inverter have the water cooling device, and the coolant flows in the order
of the inverter and the motor. The hot coolant from the motor is cooled again through the
Page 22
Thermal Package Optimization and Cable/Pipe Routing Design for Engine Nacelle
Request for Proposal, Part IV
Use or disclosure of the data contained on this sheet is subject to the restriction on the title page
heat exchanger, and then supplied to the inverter.
- The thermal model, which should consider forced convection effect, for packaging
optimization should be developed and verified.
4.3.4
The Contractor shall generate a detailed model, which can also describe the interface with
other components, of all components in the electric engine nacelle.
4.3.5
The Contractor shall define the enhanced mathematical model/formulation for thermal
packaging optimization which can describe the compact layout of all components and
thermal effects in the nacelle envelope and shall discuss it with KARI.
4.3.6
If necessary, the Contractor shall customize the in-house code that the Contractor has been
developing, and then solve the packaging optimization formulation with its own code.
4.3.7
The Contractor shall provide the interim optimized result, and shall suggest the full thermal
packaging optimization problem as next research scope.
4.4
Schedule of Works
Time*
Event
Within one week after
contract
KARI provide document for design of an electric
engine nacelle and geometry of battery cell
April 2023
Kick off meeting
One week after optimization
formulation
Interim presentation
One week before final
meeting
Submission of final report
End of Nov., 2023
Final presentation
15st December 2023
End of Contract
*) Earlier is better
4.4.1
Kick off meeting shall be performed at the Contractor site but it can be changed due to
COVID-19. (exact date will be determined later)
4.4.2
Final meeting shall be held at the KARI. (exact date and location will be fixed later)
4.5
Kick-off and final meeting
4.5.1
The Contractor shall prepare for kick off and final meeting as stated in 4.5.
Page 23
Thermal Package Optimization and Cable/Pipe Routing Design for Engine Nacelle
Request for Proposal, Part IV
Use or disclosure of the data contained on this sheet is subject to the restriction on the title page
4.5.2
To leave an evidence for kick-off and final meetings, lecture materials presented during kick-
off meeting and final meeting shall be provided to KARI in electronic file format.
4.5.3
If sensitive information is included, it should be removed and provided to KARI.
4.6
Meeting room for kick-off and final meetings
4.6.1
A meeting room shall be prepared by Contractor for kick-off meeting at Contractor location.
4.6.2
The meeting room shall be equipped with free WIFI.
4.7
Deliverable Items
The following items written in English should be submitted to KARI.
(a) The optimization report and the plan; and
(b) Final report; and
(c) Other materials relevant for the performance of Contract such as presentation slides.
For late delivery of the final report, the liquidated damages for delay shall apply.
Page 24
Thermal Package Optimization and Cable/Pipe Routing Design for Engine Nacelle
Request for Proposal, Part IV
Use or disclosure of the data contained on this sheet is subject to the restriction on the title page
This page is intentionally left blank.
25
Thermal Package Optimization and Cable/Pipe Routing Design for Engine Nacelle
Request for Proposal, Table of Contents
Use or disclosure of the data contained on this sheet is subject to the restriction on the title page
Annex A. Suggested Proposal
Page 26
Thermal Package Optimization and Cable/Pipe Routing Design for Engine Nacelle
Request for Proposal, Annex A
Use or disclosure of the data contained on this sheet is subject to the restriction on the title page
This page is intentionally left blank.
Page 27
Thermal Package Optimization and Cable/Pipe Routing Design for Engine Nacelle
Request for Proposal, Annex A
Use or disclosure of the data contained on this sheet is subject to the restriction on the title page
1. Volume 1 : CAPABILITY AND EXPERIENCE
This volume shall describe Contractor's introduction and technical capability. The facilities and tools of
the Bidder related to the development experience for thermal package optimization and cable/pipe
routing design for engine nacelle should be included. Bidder shall describe current or past work
similar to this RFP, which is being implemented or has been done by Bidder.
2. Volume 2 : TECHNICAL PROPOSAL
Bidder shall describe technical information, methodology, analysis, performance, and etc. to comply
with RFP requirements. Bidder shall describe this technical proposal with as many illustrations as
possible to make it clear.
3. Volume 3 : STATEMENT OF WORK PROPOSAL
Bidder shall submit Statement of Work proposal in this volume. In this volume, Bidder shall describe
work scope of the Bidder in detail including the respective plan.
4. Volume 4 : PRICE PROPOSAL
Bidder shall submit Price Proposal in this volume. In this volume, Bidder shall provide the price
breakdown of the price proposed by the Bidder in detail. And Bidder shall seal and submit this Price
Proposal in separate.
Page 28
Thermal Package Optimization and Cable/Pipe Routing Design for Engine Nacelle
Request for Proposal, Annex A
Use or disclosure of the data contained on this sheet is subject to the restriction on the title page
This page is intentionally left blank.
29
Thermal Package Optimization and Cable/Pipe Routing Design for Engine Nacelle
Request for Proposal, Table of Contents
Use or disclosure of the data contained on this sheet is subject to the restriction on the title page
Annex B. Terms and Conditions
Page 30
Thermal Package Optimization and Cable/Pipe Routing Design for Engine Nacelle
Request for Proposal, Annex B
Use or disclosure of the data contained on this sheet is subject to the restriction on the title page
This page is intentionally left blank.
169-84 Gwahak-ro, Yuseong-gu, Daejeon, 34133, Republic of Korea
Telephone: +82-42-860-2406 Fax : +82-42-879-4370
Page 31
Thermal Package Optimization and Cable/Pipe Routing Design for Engine Nacelle
Request for Proposal, Annex B
Use or disclosure of the data contained on this sheet is subject to the restriction on the title page
[TBD], 2023
[Name]
[Title]
[Contractor name]
[Address]
Tel: [TBD]
e-mail: [TBD]
Subject: Purchase Order (“PO”) No. KARI-23-
[ TBD
] for
Thermal Package Optimization and Cable/Pipe
Routing Design for Engine Nacelle
Dear [TBD],
Korea Aerospace Research Institute (hereinafter “KARI”) hereby places an order with [Contractor]
(hereinafter “Contractor”) for following service in accordance with Attachment B “Statement of
Work” based on the terms and conditions below. Please provide your acknowledgement by signature
after receipt of the PO with KARI’s signature, and send us by e-mail the fully signed PO and proceed
the work at your earliest convenience.
A. Order Information: As per the Contractor’s proposal submitted to KARI dated TBD, 2023
- Total Price: KRW [ TBD
] (firm and fixed; Korean Value-Added Tax (VAT) not included)
- Item: Thermal Package Optimization and Cable/Pipe Routing Design for Engine Nacelle
(hereinafter referred to as “the Task”) in accordance with Attachment B “Statement of Work”.
Description
Price (KRW)
Task
Thermal Package Optimization and Cable/Pipe Routing Design for
Engine Nacelle in accordance with Attachments A and B
[ TBD
]
Total Price (firm and fixed)
[ TBD
]
B. Terms of Payment
No.
Milestone
Payment Due date
Price (KRW) Percentage
(%)
1
P-Bond (Section F) + Kick-off
meeting
Milestone
completion + 30
days
[ TBD
]
30
2
Receipt of Final Report
Receipt of Design
Report + 30 days
[ TBD
]
70
Total Price (firm and fixed)
[TBD]
100
* EDC means the Effective Date of Contract on which both Parties have duly signed this PO.
- The payment shall be made by wire transfer to the bank account below as designated by
Contractor, within thirty (30) days after receipt of payment invoice.
http://www.kari.re.kr
169-84 Gwahak-ro, Yuseong-gu, Daejeon, 34133, Republic of Korea
Telephone: +82-42-860-2406 Fax : +82-42-879-4370
Page 32
Thermal Package Optimization and Cable/Pipe Routing Design for Engine Nacelle
Request for Proposal, Annex B
Use or disclosure of the data contained on this sheet is subject to the restriction on the title page
- All banking charges incurred in Korea shall be borne by KARI, and those charges incurred
outside of Korea shall be borne by Contractor.
- Bank account information for payment to Contractor
Beneficiary‘s bank including branch name and address
SWIFT/BIC/Routing No./Transit No./ABA No., etc.
Beneficiary‘s Name
Account Number/IBAN
C. Taxes
- Korean VAT is not included in Contract Price and shall be the responsibility of KARI.
- Unless it is proved that Contract Price under this PO is not taxable in Korea as Korean
corporation tax (herein referred to as ‘Applicable Tax’), such tax will be withheld by KARI and
KARI shall pay to the relevant Korean taxing authority on behalf of Contractor as required in
accordance with the applicable Korean law and international tax treaty between the
governments of Korea and [ TBD
] . In such case, KARI shall forward the certificate for payment of
the withheld tax to Contractor within ninety (90) days of such payment.
- KARI shall be responsible for customs duties and VAT on the Deliverable Items levied by Korean
tax authority.
D. Deliverable Items (Document) and Intellectual Property Rights
- The list of Deliverable Items and due dates for each Deliverable Item are as set forth in
Attachment B “Statement of Work”.
- The Deliverable Items shall be the property of KARI.
- KARI shall have licence to use any data included in the Deliverable Items necessary for the
purpose of this PO.
E. Delivery term
- The Deliverable Item shall be provided to the following KARI persons by e-mail;
Dr. Jae-Sung HUH (
jshuh@kari.re.kr
),
and Dr.
Sangook Jun
( sangookjun@kari.re.kr)
.
- It is agreed by the Parties that Contractor’s failure to obtain the export licence required for the
Task from the any relevant government within one (1) month after EDC constitutes a failure of
performance under Section F “Performance bond” below.
F. Performance bond
- Contractor shall establish a performance bond in favor of KARI in the value of ten percent (10
%) of the Total Price, in the form of an irrevocable and unconditional standby letter of credit or
bank guarantee available by KARI’s draft at sight, or shall deposit the amount equivalent to ten
percent (10 %) of the Total Price to the following account as security for performance.
http://www.kari.re.kr
169-84 Gwahak-ro, Yuseong-gu, Daejeon, 34133, Republic of Korea
Telephone: +82-42-860-2406 Fax : +82-42-879-4370
Page 33
Thermal Package Optimization and Cable/Pipe Routing Design for Engine Nacelle
Request for Proposal, Annex B
Use or disclosure of the data contained on this sheet is subject to the restriction on the title page
Beneficiary‘s bank
including address
Woori Bank, Daejeon Banking Center, located at 1495, Doonsan-
dong, Yusung-gu, Dajeon, Republic of Korea
SWIFT Code
HVBKKR SEXXX
Beneficiary‘s Name
Korea Aerospace Research Institute
Account Number
1081-600-247322
- If Contractor fails in performance of this Contract, including failure to obtain any export licence
required for the purpose of this Contract, the performance bond will be confiscated by KARI as
liquidated damages. In case of a letter of credit, the bond shall be available by KARI’s draft at
sight without any further requirements other than KARI’s presentation of the statement that:
there was a default of the Contractor in the performance of the Contract.
- Otherwise, the performance bond will be released promptly at the remittance of final payment
by KARI without interest.
G. Liquidated damages
- Liquidated damages to be applied for late delivery of the Deliverable Items in accordance with
Attachment B “Statement of Work” at the rate of zero point one two five percent (0.125%) of
Total Price per day, up to thirty percent (30%) of Total Price in maximum.
H. Confidentiality
- Contractor shall not, in any manner, advertise, publish or release any information related to this
Purchase Order or the work performed or to be performed hereunder without prior approval of
KARI.
I. Point of Contact in KARI
Contractual Matters
Technical Matters
Name : Ms. Ji-Young Lim
Name : Dr. Sangook JUN
Tel : +82-42-860-2615
Tel : +82-42-860-2237
e-mail : jylim1@kari.re.kr
e-mail : sangookjun@kari.re.kr
Thank you in advance for your cooperation.
Sincerely yours,
cc
:
Mr. Won-Suk LEE
Attachment A. “Technical Requirement”
Attachment B. “Statement of Work”
http://www.kari.re.kr
Korea Aerospace Research Institute
P.O acknowledged by: [TBC]
NAME: TBD
Title: TBD / Overseas Contracts Office
Date: TBD
Name: TBD
Title: TBD / Division
Date: TBD
Thermal Package Optimization and Cable/Pipe Routing Design for Engine Nacelle
Request for Proposal, Annex B
Use or disclosure of the data contained on this sheet is subject to the restriction on the title page
The End of Documents