PDF문서Technical Requirements.pdf

닫기

background image

Technical Requirements

 

 
 

○ Article Name: Cryogenic Globe Valves 
 
○ Order Information 

No. Item 

Requirements 

Q'ty

DN 15 
Pneumatic 
Cryogenic 
Globe Valves 

Operating Temperature Range 

Cryogenic (-196℃~50℃), 

6ea

Actuator Type 

Pneumatic, 

Valve Type 

On/Off, Normally closed 

Service Fluid 

LN2 

PN (Nominal Pressure) 

18 bar or higher 

Kv 1.89 

m

3/h or higher 

Power Supply 

DC 24V 

Steam Sealing 

By bellows 

Leakage 

To atmosphere < 1×10

-8 mbar*1/s 

through seat < 1×10

-6 mbar*1/s 

Seat Sealing 

PCTFE 

DN 25 
Pneumatic 
Cryogenic 
Globe Valves 

Operating Temperature Range 

Cryogenic (-196℃~50℃), 

6ea

Actuator Type 

Pneumatic, 

Valve Type 

On/Off, Normally closed 

Service Fluid 

LN2 

PN (Nominal Pressure) 

25 bar or higher 

Kv 8 

m

3/h or higher 

Power Supply 

DC 24V 

Steam Sealing 

By bellows 

Leakage 

To atmosphere < 1×10

-8 mbar*1/s 

through seat < 1×10

-6 mbar*1/s 

Seat Sealing 

PCTFE 

DN 50 
Pneumatic 
Cryogenic 
Globe Valves 

Operating Temperature Range 

Cryogenic (-196℃~50℃), 

2ea

Actuator Type 

Pneumatic, 

Valve Type 

On/Off, Normally closed 

Service Fluid 

LN2 

PN (Nominal Pressure) 

40 bar or higher 

Kv 32.3 

m

3/h or higher 

Power Supply 

DC 24V 

Steam Sealing 

By bellows 

Leakage 

To atmosphere < 1×10

-8 mbar*1/s 

through seat < 1×10

-6 mbar*1/s 

Seat Sealing 

PCTFE 


background image

DN 50 
Pneumatic 
Cryogenic 
Regulation 
Valve 

Operating Temperature Range 

Cryogenic (-196℃~50℃), 

1ea

Actuator Type 

Pneumatic, 

Valve Type 

Regulation, Normally closed 

Service Fluid 

LN2 

PN (Nominal Pressure) 

40 bar or higher 

Kv 32 

m

3/h or higher 

Power Supply 

DV 24V 

IP Regulator 

4~20 mA 

Steam Sealing 

By bellows 

Leakage 

To atmosphere < 1×10

-8 mbar*l/s 

through seat < 1×10

-6 mbar*l/s 

Seat Sealing 

PCTFE 

 
○ All valves shall be compatible with vacuum jacketed pipe, therefore brackets (rims) for 

vacuum jacket shall be welded on the valves.   

 
○ Contractor shall provide to KARI the documents of Certificate of Conformity (CoC), LN2 

test results, leak test results and manual on the delivery of above Items   

 
○ Delivery Date : Within 12Weeks After Receipt of Order 
 
○ Warranty Period : 1 year after the delivery of Items