PDF문서Specification.pdf

닫기

background image

-  1  -

S p e c i f i c a t i o n

  □  Details  of  goods

NO.

Product  name(Standard)

unit

Qty

Country  of 

Manufacture

Manufacturer

Date  of 

manufacture

1

l  Bidders  must  provide  flight  historical 

information(See  below  for  details  on  flight 

historical  information)  for 

departing 

and 

arriving  flight  at  Incheon  International  Airport 

during  the  next  three  month. 

  1)  April  1,  2015  ~  April  30,  2015

  2)  December  1,  2015  ~  December  12,  2015

  3)  January  1,  2016  ~  January  31,  2016

l  Bidders  must  provide  flight  historical 

information(See  below  for  details  on  flight 

historical  information)  for 

departing 

and 

arriving  flight  at  Jeju  International  Airport 

during  the  next  one  month. 

  1)  April  1,  2015  ~  April  30,  2015

The  flight  historical  information  provided  for 

each  airport  shall  be  at  least  50%  of  the 

number  of  departing  and  arriving  flights  at 

the  airport  on  a  monthly  basis.

※  Items  of  flight  historical  information

  1)  Departure  or  Arrival  Date

  2)  ICAO  Carrier  Code

  3)  Airline  Name

  4)  Flight  Number

  5)  Departure  ICAO  Airport  Code

  6)  Departure  Airport  Name

  7)  Arrival  ICAO  Airport  Code

  8)  Arrival  Airport  Name

  9)  Aircraft  Type

  10)  Aircraft  Code

  11)  Aircraft  Name

  12)  Scheduled  Gate  Departure  Time(Local)

  13)  Actual  Gate  Departure  Time(Local)

  14)  Actual  Take  Off  Time(Local)

  15)  Actual  Landing  Time(Local)

  16)  Scheduled  Gate  Arrival  Time(Local)

  17)  Actual  Gate  Arrival  Time(Local)

1

  ※  Delivery  of  products  with  the  same  or  equal  to  the  specified  standard  (quality)  (non-genuine  delivery  such 


background image

-  2  -

□  Participant  Notice

      -  Although  not  specified  in  the  standard,  all  materials  required  for  the  installation  and  items  necessary  for 

maintaining  the  basic  functions  and  performance  of  the  equipment.  They  must  be  supplied  together  when 

installing  the  equipment.

      -  Certificate  of  Authenticity  issued  by  the  manufacturer  (for  imports)

      -  In  the  case  of  software,  it  should  observe  the  appendix  "Software  Specifications".

      -  The  operating  manuals  (manuals)  necessary  for  the  operation  and  management  of  equipment  or  systems 

should  be  delivered  together.  If  we  request  education,  you  should  do  all  the  training.

      -  In  case  of  damages  to  the  researcher  equipment  or  facilities  during  contractor's  work,  it  should  be 

recovered  within  the  period  designated  by  the  person  in  charge.

      -  The  contractor  will  deliver  the  goods  and  the  inspection  and  technical  inspection  of  the  person  in  charge 

of  the  ordering  department  and  the  department  head.  Payment  is  made  after  completion.

      -  The  contractor  shall  be  responsible  for  the  identification  of  the  participant  entering  and  leaving  for  the 

delivery  of  goods.  The  security  management  policy  required  by  the  researcher  should  be  faithfully 

implemented  in  relation  to  access.

as  genuine  delivery  or  refurbished  delivery)

        -  Manufacturer's  official  documents  and  related  documents  to  certify  the  same  or  higher  standard  (quality)

The  comparative  evidence  must  be  submitted,  and  based  on  the  submitted  documents,

Approved.