- 1 -
S p e c i f i c a t i o n
□ Details of goods
NO.
Product name(Standard)
unit
Qty
Country of
Manufacture
Manufacturer
Date of
manufacture
1
l Bidders must provide flight historical
information(See below for details on flight
historical information) for
departing
and
arriving flight at Incheon International Airport
during the next three month.
1) April 1, 2015 ~ April 30, 2015
2) December 1, 2015 ~ December 12, 2015
3) January 1, 2016 ~ January 31, 2016
l Bidders must provide flight historical
information(See below for details on flight
historical information) for
departing
and
arriving flight at Jeju International Airport
during the next one month.
1) April 1, 2015 ~ April 30, 2015
l
The flight historical information provided for
each airport shall be at least 50% of the
number of departing and arriving flights at
the airport on a monthly basis.
※ Items of flight historical information
1) Departure or Arrival Date
2) ICAO Carrier Code
3) Airline Name
4) Flight Number
5) Departure ICAO Airport Code
6) Departure Airport Name
7) Arrival ICAO Airport Code
8) Arrival Airport Name
9) Aircraft Type
10) Aircraft Code
11) Aircraft Name
12) Scheduled Gate Departure Time(Local)
13) Actual Gate Departure Time(Local)
14) Actual Take Off Time(Local)
15) Actual Landing Time(Local)
16) Scheduled Gate Arrival Time(Local)
17) Actual Gate Arrival Time(Local)
식
1
※ Delivery of products with the same or equal to the specified standard (quality) (non-genuine delivery such
- 2 -
□ Participant Notice
- Although not specified in the standard, all materials required for the installation and items necessary for
maintaining the basic functions and performance of the equipment. They must be supplied together when
installing the equipment.
- Certificate of Authenticity issued by the manufacturer (for imports)
- In the case of software, it should observe the appendix "Software Specifications".
- The operating manuals (manuals) necessary for the operation and management of equipment or systems
should be delivered together. If we request education, you should do all the training.
- In case of damages to the researcher equipment or facilities during contractor's work, it should be
recovered within the period designated by the person in charge.
- The contractor will deliver the goods and the inspection and technical inspection of the person in charge
of the ordering department and the department head. Payment is made after completion.
- The contractor shall be responsible for the identification of the participant entering and leaving for the
delivery of goods. The security management policy required by the researcher should be faithfully
implemented in relation to access.
as genuine delivery or refurbished delivery)
- Manufacturer's official documents and related documents to certify the same or higher standard (quality)
The comparative evidence must be submitted, and based on the submitted documents,
Approved.