KARI PROPRIETARY
Request For Proposal
For
Hydraulic Supply System for Pad-Bearing
and Technical Support
November 2016
Space Test Division
Korea Aerospace Research Institute
169-84 Gwahangno, Yuseong-gu, Daejeon, 305-806,
KOREA
Phone : 82(42)860-2562, Fax : 82(42)860-2234
KARI PROPRIETARY
2016. 11
i
Space Test Division
Request For Proposal
for
Hydraulic Supply System
for Pad-Bearing and Technical Support
IMPORTANT
1. This RFP should be kept in confidentiality and should neither
be copied nor distributed to the third parties.
2. The questions and opinions on this RFP can be asked or
suggested to Korea Aerospace Research Institute before
submission of the proposal.
3. This RFP shall be legal bind after the contract is awarded
unless the bidder explicitly expresses the differences from the
RFP in the compliance sheet.
November 2016
Space Test Division
Korea Aerospace Research Institute
169-84 Gwahangno, Yuseong-gu
DAEJEON, 305-806, KOREA
Phone : 82(42)860-2562, FAX : 82(42)860-2234
e-mail :acoust@kari.re.kr
2016. 11
ii
Space Test Division
Table of Contents
I.
OVERVIEW ........................................................................................................................ 1
1. OVERVIEW OF THE PROJECT ................................................................................................ 1
2. REQUISITES OF PARTICIPANTS ............................................................................................. 1
3. DELIVERABLES .................................................................................................................. 2
4. WARRANTY ....................................................................................................................... 2
5. PRODUCT SUPPLY SCHEDULE .............................................................................................. 2
6. PAYMENT SCHEDULE .......................................................................................................... 2
II.
STATEMENT OF WORK ............................................................................................... 4
1. TOTAL SYSTEM CONFIGURATION ........................................................................................ 4
2. TECHNICAL REQUIREMENTS OF HYDRAULIC SUPPLY SYSTEM FOR PAD-BEARING.................... 5
3. TECHNICAL REQUIREMENTS OF WOOD SHIMS .................................................................... 10
4. TECHNICAL REQUIREMENTS OF TECHNICAL SUPPORT ......................................................... 10
III.
FORMAT OF PROPOSAL ........................................................................................... 11
IV.
INSTRUCTION TO BIDDERS .................................................................................... 13
1.1.
QUALIFICATION OF BIDDERS ......................................................................................... 13
1.2.
SUBMITTAL OF PROPOSAL ............................................................................................. 13
1.3.
BIDDING SCHEDULE ..................................................................................................... 14
1.4.
VALIDITY OF PROPOSAL ................................................................................................ 14
1.5.
BID BOND .................................................................................................................... 14
1.6.
QUESTIONS AND MODIFICATIONS .................................................................................. 14
1.7.
NO CONTRACTUAL OBLIGATION ................................................................................... 14
1.8.
ACCEPTANCE/REJECTION OF BIDS ................................................................................. 15
1.9.
SELECTION OF SUCCESSFUL BIDDER ............................................................................. 15
1.10.
CONTRACT ............................................................................................................... 15
1.11. LANGUAGE AND MEASUREMENT UNIT .......................................................................... 15
1.12.
PRICING REQUIREMENTS .......................................................................................... 15
1.13.
CERTIFICATE AND GOVERNMENT APPROVALS ............................................................ 15
1.14.
CONFIDENTIALITY .................................................................................................... 15
1.15.
WITHDRAWAL OF PROPOSAL ..................................................................................... 15
1.16.
PROPERTY OF PROPOSAL ........................................................................................... 15
1.17.
EXPENSES ................................................................................................................ 16
1.18.
GOVERNING LAW ..................................................................................................... 16
1.19.
ARBITRATION ........................................................................................................... 16
V. GENERAL TERMS AND CONDITION .......................................................................... 17
2016. 11
1
Space Test Division
I. OVERVIEW
1.
Overview of the project
1.1
To increase the vibration shaker capability and improve the accessibility to satellite for the
safe environmental testing, new QUAD vibration system is built.
1.2
KARI acknowledge the necessity of hydraulic supply system for pad bearings and technical
support for head expander manufacturing in KARI QUAD vibration system and KARI wants to
procure hydraulic supply system and related technical support
1.3
The purposes of this project are ;
1.3.1
To supply the hydraulic supply system for pad bearing
1.3.2
To supply the wood shims
1.3.3
To supply technical support for magnesium head expander
manufacturing
1.4
The supplier should submit the proposal to KARI.
1.5
All the descriptions in this RFP are minimum requirements and the supplier can suggest a
better one to improve the overall performance and cost. But in this case, the proposal should
clearly indicate the improvements from KARI’s requirements.
2.
Requisites of participants
2.1
The participants shall also have experience in manufacturing and delivery of a 3m vibration
system
2016. 11
2
Space Test Division
3. Deliverables
The hardware deliveries & technical support shall include, as a minimum, the following:
Description (set)
Hardware supply
Hydraulic supply system
Wood shims
-
Shim 1 (4ea) 520 x 500 (T) 280
-
Shim 2 (4ea) 520 x 500 (T) 253
-
Shim 3 (32ea) 520 x 500 (T) 230
Technical Support
Services
1.First visit: Report for support for Mg. welding & heat treatment
2. Second visit: Report for inspection of guiding box in H/E
3. Third visit: Report for support on the machining process
4. Warranty
5.1
The system shall be warranted for a duration of 1 year from the completion date of Inspection
and Site Acceptance to KARI.
5.2
The warranty covers the replacement of faulty parts, the labor required for repair, traveling cost,
living fees and all associated necessary costs.
5.3
The contractor or A/S teams shall submit the written plan for repair within 48 hours after the
reception of the notification of fault. The contractor or A/S teams shall completely finish the
repair within 30 days after the reception of the notification of fault.
5. Product Supply Schedule
The contractor shall meet the key points schedule as below;
Items
Key Points Schedule
Hydraulic Supply
System
-
Factory Acceptance Test at Contractor site
: February 2017
6. Payment Schedule
The KARI will pay to Contractor the Contract Price in accordance with the following schedule:
(a) Hardware supply
No.
Payment milestone
(in Month)
Payment due date
Percentage of
Contract Price (%)
1
EDC
EDC+ 1M
30
2016. 11
3
Space Test Division
2
FAR (EDC+ 2M)
EDC+ 3M
60
3
Inspection of Hydraulic
Supply System
(EDC+ 4M)
EDC+ 5M
10
Total
100 %
* “EDC” means the Effective Date of this Contract.
* “FAR” means the Factory Acceptance Review at Contractor site.
(b) Technical Support Services
No.
Payment milestone
(in Month)
Payment due date
Percentage of
Contract Price (%)
1
EDC
EDC+ 1M
40
2
Delivery of report
(EDC+ 3M)
EDC+ 4M
60
Total
100 %
2016. 11
4
Space Test Division
II. Statement of Work
1.
Total System Configuration
This document covers the technical requirements applicable to the oil supply system for pad bearing
and technical support in KARI QUAD vibration system.
To control the overturning moment during the vertical vibration testing, 16 pad-bearings are installed
which was designed so that a compression status between the bearings and slide plates is always
maintained (minimum compression force of 90kN at each bearing).
The configuration of 16 pad bearings are shown in below.
The roles of pad bearing oil supply system (oil supply system for abbreviation) are to supply hydraulic
oil for pad bearing operation, to monitor oil flow and to control the safety operation of bearings including
other components of shaker system.
<Configuration of pad-bearings>
2016. 11
5
Space Test Division
< Configuration of electrical cabinet for hydraulic group>
2.
Technical Requirements of hydraulic supply system for pad-bearing
During this work package the following tasks shall be performed:
2.1.1
Design
The design of the hydraulic supply system shall be carried out to manage KARI existing pad bearing
and potential future bearings.
The design of oil flow monitoring unit shall be carried out to monitor the oil flow from oil supply to pad
bearings. Four oil flow sensor shall be applied as a minimum.
2.1.2
Manufacturing
The system hardware shall be manufactured according to the design. All manufacturing operations shall
be planned in co-ordination with inspections and tests. This planning shall be documented in a concise
Manufacturing and Inspection Plan.
2.1.3
Factory acceptance
The Factory Acceptance objective is to verify that the requirements detailed in technical requirements
are fulfilled.
The factory acceptance tests and inspections shall be performed according to a Factory Acceptance
Plan, which shall identify all the activities to be performed and the requirements intended to be verified.
The Factory Acceptance Review meeting in order to review the results of the implementation of the
Factory Acceptance plan shall be organised.
2.1.4
Installation
N/A.
2.1.5
Support on test of functionalities
Based on the knowledge of all the functions required for the safety logic diagram (including hydraulic
groups, H/E over travel, resting pads, air supply), Contractors shall supply test plan and procedures to
be carried out on the electrical cabinet (including PLC system) which is designed and manufactured by
KARI sub-contractor
During the warranty period, attendance of engineer shall be performed to support operation and to
check the functionalities of whole vertical shaker system including safety logic.
As a minimum, two weeks of period, engineer supervises the all functional test for QUAD vibration
shaker system at KARI site
During this period, the contractor should supply the engineering support to solve the problem related
with QUAD system
In this proposal, hydraulic supply system shall meet the requirements described below.
[Req_1] Design Requirement
▣ Req_1.1: Hydraulic supply system shall be comprise hydraulic group(or pump) and oil flow
monitoring unit.
2016. 11
6
Space Test Division
▣ Req_1.2: The design of system shall be compatible with the use of two types of TEAM corporation
pad bearing system such as 410-10 bearings and 410-12 bearings, which compatible with KARI
supplied hydraulic hose and manifold design.
<Specification of bearing 410-10>
[Req_2] Hydraulic Group
The hydraulic group shall have the following requirement as minimum:
▣ Req_2.1: One supply pump system comprises electrical motor and variable volume pump to supply
the existing pad bearings and potential pad bearings including hydraulic lines and manifolds.
Flow : 50 litters/ min for minimum
Pressure : 210 bars minimum
▣ Req_2.2: One cooling & filtration group comprise:
Pump driven by electrical motor (50 litters/min)
Heat exchanger chilled water
Interface for filling the oil group
Filter - 3μm with electrical clogging indicator
▣ Req_2.3: A tank (300 litters) including:
Electrical oil level indicator (two levels)
Air filter
Temperature probe
Oil retention tray
▣ Req_2.4: Mounting plate fitted with:
2016. 11
7
Space Test Division
Oil supply electro-valve
Bypass electro-valve
Pressure regulator
Filtering element - 3μm with electrical clogging indicator
Pressure probe
▣ Req_2.5: Scavenge pump
[Req_3] Oil Flow Monitoring unit
▣ Req_3.1: Oil flow monitoring unit consists in oil flow meters to be installed on the pressure manifolds
of the hydraulic system.
▣ Req_3.2: To check the operation status of hydraulic group and pad bearings, the design of
installation of the flow meters shall be performed such as flow meter selection and definition of hydraulic
adapters and manifolds.
▣ Req_3.3: The oil flow monitoring unit shall monitor all bearings status by four positions of oil flow
sensors as minimum.
[Req_4] Control Panel
Control panel (electrical panel) shall have the following requirements as minimum:
▣ Req_4.1: KARI subcontract will supply the control panel component such as PLC hardware &
operation programing
▣ Req_4.3: Control panel shall operate all the functions for the safety logical diagram, which is
supplied by KARI, including hydraulic group, HE over travel, resting pads defaults and air supply
defaults
▣ Req_4.4: Contract shall supply test plan describing all the tests that must be done to verify the PLC
and describing the expected results of the system
▣ Req_4.5: Contractor shall supervise the overall function test in the KARI site.
▣ Req_4.6: During the maintenance period, KARI will test the all functionalities of electrical cabinet
including PLC and send a report to Contractor. Contractor shall review the test report.
< Functions fulfilled by control panel >
Defaults
Effect on vibration system
Oil temperature
High
Warning lamp flashing
Too high
Alarm lamp lighting
Horn ringing
Oil pump off
With pressure ramp down
B&K interlock 2 open
B&K interlock 1 open after 5s
Restart the system
Default displayed on PLC
Reset the system from local console
Start the hydraulic system
Oil level in the reservoir
Low
Warning lamp flashing
Too low
Alarm lamp lighting
Horn ringing
Oil pump off
With pressure ramp down
B&K interlock 2 open
B&K interlock 1 open after 5s
Restart the system
Default displayed on PLC
2016. 11
8
Space Test Division
Reset the system from local console
Start the hydraulic system
Filter clogging on HP
line
High
Warning lamp flashing
Too high
Alarm lamp lighting
Horn ringing
Oil pump off
With pressure ramp down
B&K interlock 2 open
B&K interlock 1 open after 5s
Restart the system
Default displayed on PLC
Reset the system from local console
Start the hydraulic system
Filter clogging on
Circulation Line
High
Warning lamp flashing
Too high
Alarm lamp lighting
Horn ringing
Oil pump off
With pressure ramp down
B&K interlock 2 open
B&K interlock 1 open after 5s
Restart the system
Default displayed on PLC
Reset the system from local console
Start the hydraulic system
Defaults
Effect on vibration system
Main air pressure supply
Pressure off
Alarm lamp lighting
Horn ringing
Oil pump on
B&K interlock 2 open
B&K interlock 1 open after 5s
Restart the system
Remove the default
Reset the system from local console
Start the hydraulic system
HP oil flow (overall)
Min or max warning
Warning lamp flashing
Min or max Alarm
Alarm lamp lighting
Horn ringing
Oil pump off
With pressure ramp down
B&K interlock 2 open
B&K interlock 1 open after 5s
Restart the system
Default displayed on PLC
Reset the system from local console
Start the hydraulic system
HP oil flow (for each
group of 4 bearings)
min or max warning
Warning lamp flashing
Min or max Alarm
Alarm lamp lighting
Horn ringing
Oil pump off
2016. 11
9
Space Test Division
With pressure ramp down
B&K interlock 2 open
B&K interlock 1 open after 5s
Restart the system
Default displayed on PLC
Reset the system from local console
Start the hydraulic system
HP oil pressure
Low
Warning lamp flashing
Too low
Alarm lamp lighting
Horn ringing
Oil pump off
With pressure ramp down
B&K interlock 2 open
B&K interlock 1 open after 5s
Restart the system
Default displayed on PLC
Reset the system from local console
Start the hydraulic system
HE over travel
up
1 of the 2
contacts on
Alarm lamp lighting
down
B&K interlock 1 open
B&K interlock 2 open after 5s
Restart the system
Default displayed on PLC
Reset the system from local console
Oil pump on
Defaults
Effect on vibration system
Resting
pad
default
when
vibration ready
Default
Alarm lamp lighting
B&K interlock 1 open
B&K interlock 2 open after 5s
Restart the system
Default displayed on PLC
Reset the system from local console
Oil pump on
Resting
pad
default
when
operating them
Default
Alarm lamp lighting
Restart the system
Default displayed on PLC
Reset the system from local console
Oil pump on
Resting pad/static load
compensation air supply
default
Air supply default
Alarm lamp lighting
B&K interlock 1 open
B&K interlock 2 open after 5s
Restart the system
Default displayed on PLC
Reset the system from local console
Oil pump on
Emergency stop
Emergency stop on
Everything stops
Air pressure supply to static weight compensation and
2016. 11
10
Space Test Division
shaker PIC drop down to zero bar
Re-Start
[Req_5] Support on test
Engineering support shall have the following requirements as minimum:
▣ Req_5.1: Contractor shall supply hydraulic group handling
▣ Req_5.2: Contractor shall supply supervision of hydraulic group installation
▣ Req_5.3: Contractor shall supply supervision of piping work& hose installation
▣ Req_5.4: Contractor shall support operation and check the functionalities of whole vertical shaker
system including safety logic.
▣ Req_5.5: During this period, the contractor should supply the engineering support to solve the
problem related with QUAD system
3.
Technical Requirements of wood shims
[Req_6] Wood shims
▣ Req_6.1: Supplied wood shim shall have the characteristics that the perpendicular compressive
strength shall be better than 5 MPa to support the mass.
▣ Req_6.2: Contractor should supervise lifting activity of the seismic mass. Mass of seismic is about
300 tons and required lifting height is 1m.
4.
Technical Requirements of technical support
Contract shall supply assistance for the manufacturing of the magnesium head expander and related
work. Three times of visit should be performed as minimum. The schedule of visit and detailed contents
can be changed according to the progress of head expander manufacturing.
[Req_7] Technical Support
▣ Req_7.1: During this first visit, Contractor shall will review together the other participants the
preparation work (procedures, preliminary tests, chamfering of the plates) and inspect the very first
welds (welding of the central cross on the top plate). A review of the characteristics of the heat furnace
(for heat treatment) shall also be performed.
▣ Req_7.2: A second visit would be to inspect the guiding boxes before they are welded on the
top plate. The same persons as for the first visit must be present
▣ Req_7.3: A last visit would be after the heat treatment and the dimensional measurement after
the heat treatment. KARI will supply the dimensional measurement report (in English) before the
visit. The main objective of this meeting is to advise on the way to do the machining taking into
account flatness of the HE
2016. 11
11
Space Test Division
III. Format of Proposal
The proposal shall consist of 6 section(S).
S 1 : Bidder's Qualification Document
S 2 : Executive Summary (Overview)
S 3 : Technical Proposal
S 4 : Warranty Proposal
S 5 : Bidder's Confirmation Document for Fully Understanding of the RFP
S 6 : Price Proposal
The bidder shall present 6 copies of the proposal. A4 or letter size paper shall be used. The bidder is
requested to strictly follow the following illustrated format (tabular form). This is very important
to compare and evaluate different bidders’ proposal. Consequently, disregard for this rule may end up
with disqualification. Also, well-prepared and well-organized proposal will be highly appreciated and
evaluated. The landscape orientation will be acceptable for tables. The suggested contents in each WP
are minimum requirements and works for reminiscences. Ambiguous expression will act adversely to
the bidder.
S 1 : Bidder's Qualification Document
(*) Bidder's Qualification : The followings shall be included in WP1.
The participants shall also have experience in manufacturing and delivery of a 3m vibration
system
The followings shall be included in this Section.
(a) Bidder's experiences on the prescribed system in this "Request for Proposal" including :
(1) design
(2) manufacturing
(3) installation (specifications, performance, purchaser, supplied year)
(4) training (operation and maintenance) of the facility
(b) The installation information (including personnel's information in charge of the facility, address, FAX
number, etc.) from the well known institutes or companies which are using the facilities installed by
the bidder and/or subcontractor.
(c) Other information
1. Total Employees
- Total number of Employees (Engineer / Technician)
- Number of Employees for the directly related area
2. Plant Scale
- Total area of space
- Factory & Building area
3. General brochure
4. Any documents with which the bidder can show his/her financial and technical abilities (e.g.
technical awards, bank balance, etc.)
(d) Bidder’s Qualification Evidence Documents.
S 2 : Executive Summary (Overview)
This WP shall include the summary of the all section. The tabular form is recommended.
S 3 : Technical Proposal
This WP (Technical Proposal) shall be written in English. Concise and clear expression is required.
A long sentence should be broken down into several sentences. Detailed block diagrams, figures and
2016. 11
12
Space Test Division
photos are recommended for clear illustration.
All the descriptions in this RFP is minimum requirements and the bidders can suggest the better
one to improve the overall performance and cost. But in this case, the proposal should clearly
indicate the improvements on the KARI’s requirements with their detail drawings and explicit calculation
results.
The contents of proposal will be the measurement of the bidder’s technical capabilities. Bidder’s
proposal will be reviewed by a number of experts at KARI and other institutes.
The bidder shall prepare tables for the check list to show the bidder’s compliance with the “Request for
Proposal”. This table shall be located in front of the Technical Proposal part. The articles in the “Work
description” and “Technical Requirements” of the RFP shall be completely enumerated in the table. The
table format is as follows:
Check Lists for “Part I Overview work description” and “Part II Technical Requirements
ANR
: Article Number in the “Part II & III Technical Requirements” in the RFP.
Y/N
: Compliance (Yes or No.)
CAP
: Corresponding Article number in the bidder’s Proposal to ANR
AAM
: Article number of Added Material in the bidder’s proposal which is not mentioned in the RFP.
Part
I
Or
Part
II
ANR
Y/N
CAP
Remark
AAM
Remark
1)
yes
1)
ditto
2)
yes
2)
ditto
3)
yes
3)
ditto
4)
yes
4)
The specifications look
old. We updated them.
N/A
N/A
N/A
N/A
5)
We currently
developed a
new method.
5)
yes
6)
ditto
6)
no
7)
The resolution is high
above the necessity.
The current technology
for the system …..
7)
yes
8)
ditto
8)
no
9)
This specification is not
compatible with 8) in the
proposal. We suggest
other approach.
9)
yes
10)
ditto
# ditto : The same as stated above or before
S 4 : Warranty Proposal
4.1 Baseline warranty (1 years)
- plan for the prompt repair
- information on A/S team
S 5 : Bidder's Confirmation Document for Fully Understanding of the RFP
This document shall confirm that the bidder has completely understood the whole RFP, which was
written in English.
S 6 : Price Proposal
Price proposal in Euro
2016. 11
13
Space Test Division
IV. INSTRUCTION TO BIDDERS
1.1. Qualification of Bidders
(1) Bidder shall also have experience in manufacturing and delivery of a 3m vibration system.
1.2. Submittal of Proposal
The proposal shall be hand-carried or sent via appropriate express courier to KARI personnel or his designee
within the Bid Closing Date and Time. A deputy shall submit the power of attorney and a copy of his identification.
1.2.1.
Number of copies
The Proposal should be made in six (6) copies in English. In case of any discrepancies between the Proposals,
the original hardcopy shall prevail.
1.2.2.
Bid closing date
The closing for the Proposal is specified in Bid summary. If any part of the Proposal as required under this RFP
is submitted after the stipulated closing time, the entire Proposal will not be accepted.
1.2.3.
Point of contact
Besides the Proposal submission, the point of contact for all communications for technical matters shall be
Dr. Jong-Min Lim
Space Test Division
Korea Aerospace Research Institute (KARI)
169-84 Gwahak-ro, Yuseong-Gu
Daejeon, 34133, Korea
Tel : +82-42-860-2562
Fax: +82-42-860-2234
E-mail : acoust@kari.re.kr
The communication between KARI and prospective Bidders for contractual matters (Terms and Conditions) shall
be controlled through the following designee:
Mr. Jung-Nam CHO
Senior Administrator of Procurement Team
Korea Aerospace Research Institute (KARI)
169-84 Gwahak-ro, Yuseong-Gu
Daejeon, 34133, Korea
Tel : +82-42-860-2613
Fax: +82-42-860-2666
E-mail : jncho@kari.re.kr
Bidder’s information on the points of contact shall include the name, title/position, telephone number, E-mail
address, and facsimile number.
1.2.4.
Information on the evaluation
The evaluation of the Proposals will be performed by the evaluation committee in KARI. The following
evaluation guidelines are for information only, and the evaluation committee reserves the right to modify the
guidelines without any prior notification to Bidders.
Principles of evaluation are as follows;
(1) Subject to an initial review of the Proposal, KARI may send to Bidders a set of questions for clarification
and supplementation to the Proposal, and the evaluation will be made based on the Proposal and the
answers received from Bidders.
(2) First, the evaluation will be performed for the technical part of the proposal and the Qualified Bidders
will be selected as a result of technical evaluation. Second, the lowest price proposal among the Qualified
Bidders will be selected as Successful Bidder.
(3) The evaluation will be based on the baseline work scope. Any optional propositions will be evaluated
separately.
2016. 11
14
Space Test Division
(4) The result of the evaluation is at the proposal evaluation committee’s discretion based on the evaluation
process and any Bidders shall not raise any objection regarding proposal evaluation committee’s decision
thereupon.
1.3. Bidding Schedule
The following schedule is a tentative milestone for the eventual Contract and may be changed at KARI’s sole
discretion:
[1] RFP Release: T0
[2] Proposal Closing Date: T1 = T0 + 10 days
[3] Review of Proposal: T1 + 7 days
[4] Question and Answer: T1 + 7 days
1.4. Validity of Proposal
Proposal shall be valid for three (3) months from the Bid closing date and upon KARI’s request, shall be
extended for another three (3) months.
1.5. Bid Bond
1.5.1.
Amount of Bid Bond
Bidder shall establish a bid bond in favor of KARI not later than the Bid Closing Date and submit the certificate
to KARI along with this Proposal. The total amount of the bid bond shall be at least five (5) percent of the total
bidding price. The bid bond shall remain valid for three (3) months, and if the Bid validity is extended as per
Section 1.4, the bid bond shall also be extended accordingly.
1.5.2.
Bid Bond Establishment Method
The bid bond in Section 1.5.1 hereinabove shall be issued by first class international bank in the form of an
irrevocable letter of credit and advised through “Woori Bank” (Daejeon Branch at 29 Munye-ro, Seo-gu,
Daejeon, 35241 Korea, Tel: +82-42-488-9704, Ext. 312 / Fax:+82-505-003-0759). The bond shall be available
by KARI's draft at sight drawn on the Bank, accompanied by the statement of KARI stating that Bidder has
refused to enter into a Contract with the terms and conditions in the RFP as amended, if any, that Bidder has
hindered the fair bidding by fraud or misrepresentation, or that Bidder has withdrawn its Proposal after the Bid
Closing Date. The bid bond shall contain the substantial part of the terms and conditions of the bond, date of
establishment, account, amount, payment terms, and date of expiry, etc.
1.5.3.
Bid Bond Return
The bid bonds except for those of the Successful Bidder and the other Qualified Bidders will be released upon
the instructions of KARI to the Non-Qualified Bidders, without interest, promptly after KARI’s selection of the
Successful Bidder. The bid bond of the Successful Bidder and the other Qualified Bidders shall be likewise
released to the corresponding Bidder with whom KARI decides not to enter into a Contract.
1.5.4.
Contractor’s Bid Bond
When the Contract is executed, the bid bond shall be released upon the instructions of KARI to the Contractor,
without interest, promptly after the Contractor shall establish a performance bond or amend a bid bond in favor
of KARI.
1.6. Questions and Modifications
Any questions as to the intent and clarity of the RFP may be asked to KARI’s point of contact as specified in
Section 1.2.3 by E-mail, fax or letter no later than three (3) days before the Bid Closing Date.
After the Bid Closing Date, Bidders shall not amend, modify, or supplement the Proposal, or submit any other
documents to KARI, except with KARI's written request.
KARI may ask, in writing, questions as to the intent and clarity of the Proposal to Bidders or request the Bidders
to provide supplementary information or data.
1.7. No Contractual Obligation
This RFP shall not be interpreted as an offer for a Contract or any type of guarantee by KARI. It is KARI's sole
2016. 11
15
Space Test Division
discretion whether or not to allow the Contract award to any Bidder. KARI owes no responsibility or obligation
to select the Contractor among Bidders.
This solicitation for the Proposal shall neither be construed to create an obligation on KARI to enter into a
contractual instrument, nor shall it serve as a basis for any claim for reimbursement of costs for the effort to
prepare, submit, amend, revise or supplement the Proposal, and other related documents expended by Bidder
regardless of whether or not Bidder is successful in receiving an award as a result of the solicitation.
1.8. Acceptance/Rejection of Bids
KARI reserves the right to accept or reject any Bidding, and to amend the Bidding process and reject all Biddings
at any time prior to the award of the Contract without thereby incurring any liability to the affected Bidder(s), and
KARI is not under any obligation to inform the affected Bidder(s) of the ground for its action.
1.9. Selection of Successful Bidder
First, the evaluation will be performed for the technical part of the proposal, and the Qualified Bidders will be
selected as a result of technical evaluation. Second, the lowest price proposal among the Qualified Bidders will
be selected as Successful Bidder.
1.10. Contract
The Terms and Conditions as presented in Chapter V. of this RFP is the baseline requirement for the Contract
negotiation, and will be the basis of the Contract.
1.11. Language and Measurement Unit
The Proposal and any documents submitted to KARI under this RFP and communication and the Contract
language shall be in English or Korean.
"Système Internationale" (SI, hereafter) units shall be used for measurements and quantities in the Proposal and
all the accompanying documents.
1.12. Pricing Requirements
Any price or rate proposed by Bidder shall be firm and fixed, not subject to change for a price escalation for the
entire period of the Contract.
Any kinds of taxes and duties arising in connection with Bidder’s work under this RFP and under the eventual
Contract shall be Bidder’s responsibility, except for the customs duties levied in Korea.
The price shall be inclusive of any cost or charge incurred due to delivery of any equipment, hardware, software
or documentation to KARI or its designated point of delivery.
1.13. Certificate and Government Approvals
Bidders shall receive the government approval and certificates (e.g. E/L) in relevant countries, necessary for
Bidder's work for this Proposal. Bidder's ability and plan to get such approval and certificates shall be submitted
to KARI, together with any appropriate assurance letters from the relevant governments, in the proposal.
1.14. Confidentiality
There shall be no news releases, public announcements, denials or confirmation in connection with this RFP or
Contract award without the prior written approval of KARI.
All documentation submitted in response to this RFP shall be marked "COMMERCIALS-IN-CONFIDENCE" on
the first page of each document. All elements of the RFP shall be kept confidential, and shall not be intentionally
disclosed by Bidder to the third parties.
1.15. Withdrawal of Proposal
Bidder may withdraw its Proposal at any time before the Bid Closing Date. Withdrawal shall be made in writing,
and shall be received by KARI before the Bid Closing Date.
1.16. Property of Proposal
All documents submitted in response to this RFP shall become the property of KARI and will be retained by
2016. 11
16
Space Test Division
KARI.
1.17. Expenses
Expenses incurred by Bidders in connection with the preparation, submittal, and any subsequent clarification or
negotiation activities are for their own account and will not be reimbursed by KARI.
1.18. Governing Law
This RFP and the Contract shall be construed in accordance with and governed by the laws of the Republic of
Korea.
1.19. Arbitration
Any disputes in relation to, and under the RFP and the Contract shall be resolved through arbitration in Seoul,
Korea, under the Rules of the Korean Commercial Arbitration Board.
2016. 11
17
Space Test Division
V. GENERAL TERMS AND CONDITION
Article 1. Definition
In this Contract, the following words and phrases shall have the meanings as indicated below, unless the context
wherein they are used clearly indicates another meaning:
1.1
Associates mean all individual or legal entities organized under public or private law, who shall act,
directly or indirectly, on behalf of KARI or Contractor, or at the direction of either Party to this Contract
to fulfill the obligations undertaken by such Party in this Contract, including, without limitation, the
employees of each Party, their suppliers and Subcontractors.
1.2
Contract means this Contract for the Hydraulic supply system for pad bearing and the technical support
for manufacturing of the magnesium head expander, including Appendices as attached hereto, and all
amendments that may be subsequently agreed to by the Parties in accordance with the terms and
conditions of this Contract.
1.3
Contractor means TBD.
1.4
Contract Price means the amount of Contract. If there is any change in Contract Price due to any reason,
then the Contract Price means current total amount of Contract.
1.5
Deliverable Data means any technical data as enlisted in Appendix B-1 “Statement of Work” that
Contractor shall deliver to KARI and any related data thereof under this Contract.
1.6
Deliverable (Delivery) Item(s) means hydraulic supply system and deliverable data as enlisted in
Appendix B-1 “Statement of Work” that Contractor shall deliver to KARI.
1.7
EDC means the Effective Date of this Contract.
1.8
Event(s) of Force Majeure means any act of God, war, whether or not declared, act or failure to act of
any government in its sovereign capacity, fire, earthquake, flood, epidemic, quarantine, nuclear incident,
or any other act beyond the reasonable control and without the fault of either Party or its Subcontractors.
1.9
Factory Acceptance means KARI’s pre-shipment inspection or audit including the testing activities for
Deliverable Item at Subcontractor’s facility.
1.10
Hydraulic Group means the supplying and collecting part for oil of pad bearing. It includes supply
pump, tank, scavenge pump and related valve as minimum.
1.11
Hydraulic Supply System means equipment to supply and monitor the hydraulic oil to pad bearings of
vertical vibration system. It includes hydraulic group and oil flow monitoring unit as minimum.
1.12
KARI means Korea Aerospace Research Institute.
1.13
Magnesium Head Expander means structure that supplies interfaces to pad-bearing. It is made of many
magnesium plates by welding method, heat treatment and machining.
1.14
Oil Flow Monitoring Unit means the system that consists in oil flow meters to be installed on the
pressure manifolds of the hydraulic system. It consists of 4 flow meters and manifolds.
1.15
Party or Parties means KARI or Contractor, or both, according to the context.
1.16
QUAD vibration system means vertical vibration system composed of 4 shakers.
1.17
Subcontract means any subcontract, including purchase orders and all similar forms of agreements at any
tier under this Contract.
2016. 11
18
Space Test Division
1.18
Subcontractor means a contractor under any Subcontract including suppliers and vendor.
1.19
Technical support means activity to review and give solution for the manufacturing of the magnesium
head and related with hydraulic supply system
1.20
Third Party(ies) means any individual or legal entity other than the Associates and the Parties.
1.21 Wood shims means part for reaction mass lifting of 300 tons
1.22
Work(s) means whole or any part of the work, but not limited to review meeting, delivery, installation,
test, training, warranty and maintenance, to be executed by a Contractor in accordance with this Contract.
2016. 11
19
Space Test Division
Article 2. Objective
2.1
The objective of this Contract is to procure the hydraulic supply system, wood shims and technical support
for QUAD vibration system through the effort of the Contractor. To accomplish this objective, Contractor
shall perform all the Works under this Contract required for design, manufacture, test, installation,
warranty and technical support as well as the delivery of Deliverable Item to meet the requirements and
specification of this Contract.
2016. 11
20
Space Test Division
Article 3. Contract Documents
3.1
This Contract shall comprise the following documents, as amended from time to time by written agreement
by and between both Parties:
[A] Terms and Conditions
[B] Appendices
B-1. Statement of Work
B-2. Contractor’s proposal
3.2
In the event of any inconsistency or discrepancy between or among the Contract documents as listed in
Article 3.1 above, the Contract documents shall be applied in the decreasing order of precedence.
3.3
In the event of any dispute or difference between the Parties in the interpretation of this Contract as a result
of the application of the Appendices as specified in Article 3.1, Contractor's Proposal dated
submitted to KARI in anticipation of this Contract in response to KARI's Request for Proposal dated
shall be used as a reference document to identify and clarify the intention and understanding of the Parties
as contemplated in this Contract, and both Parties shall in good faith seek an agreement or a compromise
acceptable to both Parties without modification or amendment to this Contract.
2016. 11
21
Space Test Division
Article 4. Responsibilities of the Parties
4.1
Responsibilities of KARI
4.1.1
KARI shall make a payment to Contractor in accordance with Article 6 “Terms of Payment”.
4.1.2
In accordance with Appendix B-1 “Statement of Work”, KARI shall provide any reasonable support
including facilities, equipment and information in order for Contractor to fulfill the technical support at
KARI site.
4.1.3
KARI shall provide reasonable cooperation and support in order for Contractor to obtain any government
approval.
4.1.4
KARI shall have the right to monitor and access the work in progress at Contractor’s
and its Subcontractor’s facilities.
4.2
Responsibilities of Contractor
4.2.1
Contractor shall have all responsibilities for the delivery of hydraulic supply system for pad bearing to
KARI in a timely manner as required and defined under this Contract without any charges to KARI.
4.2.2
Contractor shall provide all Work including the installation, training, warranty and technical support
required and stated under this Contract to KARI.
4.2.3
Contractor shall provide as sufficient as engineering manpower for the timely
completion of the tasks as set forth in Appendix B-1. “Statement of Work”. If the tasks
are not completed with manpower foreseen due to Contractor’s fault, Contractor shall
provide any additional manpower to accomplish its scope of work without any
additional cost to KARI.
4.2.4
Contractor shall provide any technical information or assistance as may be needed for
KARI to understand Technical Data or output of Contractor’s work hereunder, without
any additional charge to KARI.
4.3
Types of Technical Support Services
4.3.1
Contractor’s Services under this Contract shall be performed in the following types:
(a) Report for support for Mg. welding & heat treatment
(b) Report for inspection of guiding box in H/E
(c) Report for support on the machining process
2016. 11
22
Space Test Division
Article 5. Contract Price
5.1
For the full, satisfactory and timely performance of the Work by the Contractor in accordance with the
provisions of the Contract, KARI hereby agrees to pay to the Contractor _______________ U.S
dollars/EUROs (US$/€ ____________), in accordance with the terms of payment as stipulated in Article
6 “Terms of Payment”.
5.2
The Contract Price as specified in Article 5.1 above shall be firm and fixed price that is not subject to any
escalation or to any adjustment or revision by reason of the increase of actual costs incurred by Contractor
in the performance of the Work under this Contract, unless otherwise agreed to by both Parties under
Article 23 “Changes”.
5.3
The Contract Price as specified in Article 5.1 above shall be comprised of the following items.
Description (set)
Price (US$/€)
Hardware supply
Hydraulic supply system
Wood shims
-
Shim 1 (4ea) 520 x 500 (T) 280
-
Shim 2 (4ea) 520 x 500 (T) 253
-
Shim 3 (32ea) 520 x 500 (T) 230
Technical Support
Services
1.First visit: Report for support for Mg. welding
& heat treatment
2. Second visit: Report for inspection of guiding box in
H/E
3. Third visit: Report for support on the machining process
Total
5.4
All banking charges incurred in Korea shall be borne by KARI and those charges incurred outside Korea
shall be borne by Contractor.
2016. 11
23
Space Test Division
Article 6. Terms of Payment
6.1 Payment Schedule
6.1.1 Payment shall be executed after the establishment of performance bond in accordance with Article 7
“Performance Bond”.
6.1.2 KARI shall pay to Contractor the Contract Price as stipulated in Article 5.1 in accordance with the
following schedule:
(c) Hardware supply
No.
Payment milestone
(in Month)
Payment due date
Payment
(US$/€)
Percentage of
Contract Price (%)
1
EDC
EDC+ 1M
30
2
FAR (EDC+ 2M)
EDC+ 3M
60
3
Inspection of Hydraulic
Supply System (EDC+
4M)
EDC+ 5M
10
Total
100 %
* “EDC” means the Effective Date of this Contract in accordance with Article 22 “Effective Date of
Contract”.
* “FAR” means the Factory Acceptance Review at Contractor site.
* “Inspection” means the incoming inspection of the Deliverable Item in accordance with Article 13.
(d) Technical Support Services
No.
Payment milestone
(in Month)
Payment due date
Payment
(US$/€)
Percentage of
Contract Price (%)
1
EDC
EDC+ 1M
40
2
Delivery of report
(EDC+ 3M)
EDC+ 4M
60
Total
100 %
* “EDC” means the Effective Date of this Contract in accordance with Article 22 “Effective Date of
Contract”.
6.2
Billing Procedure
6.2.1
All invoices Contractor submits for payment shall be in duplicate signed by an authorized company
official and received by KARI at least thirty (30) days before the payment due dates as specified in Article
6.1.
6.2.2
All payments shall be made in U.S dollars/EUROs by telegraphic transfer to the bank account as
designated by Contractor in its invoices, by the payment due dates as stipulated in Article 6.1, but or not
later than thirty (30) days after KARI's receipt of Contractor's invoices whichever comes later.
6.3
Suspension of Payment
6.3.1
Notwithstanding any provisions of this Contract, if any payment milestone as set forth in Article 6.1.2
has not been accomplished for any reasons attributable to Contractor, KARI may, with an advance notice,
suspend all payments due until KARI and Contractor agree that the delayed payment milestone has been
accomplished.
6.3.2
In the event of KARI's suspension of payment under Article 6.3, Contractor shall nevertheless continue
to perform its obligations under this Contract regardless of whether KARI is entitled to suspend the
2016. 11
24
Space Test Division
payment.
6.4
Deduction of Payment
6.4.1
All losses, costs, charges, damages and expenses which KARI incurs or sustains by reason of any act,
default or omission of the Contractor in the performance of the Contract and any other amounts which
KARI is entitled to receive from the Contractor may be deducted from any payment that may be or
become due to the Contractor from KARI or may request for those amount to Contractor.
6.4.2
A prior written notice given by KARI accompanied with documents stating the amount due to KARI
referred to in Article 6.4.1 and the reason of deduction shall be prima facie evidence of the matters stated
herein.
2016. 11
25
Space Test Division
Article 7. Performance Bond
7.1
Contractor shall establish a performance bond or deposit cash within three (3) weeks after EDC in favor
of KARI in the value of ten percent (10 %) of the Contract Price, in the form of an irrevocable and
unconditional standby letter of credit available by KARI’s draft at sight.
7.2
The entire amount covered by the performance bond shall be payable to KARI on demand together with
KARI’s written statement to the effect:
(a) that there was a default of the Contractor in the performance of the Contract
(including Subcontractor’s default under the Subcontract), or
(b) that any amount KARI is entitled to receive from Contractor has not been paid by
Contractor to KARI through any other means, or
(c) that the performance of the Delivery Item accepted by KARI pursuant to the Article
13 “Inspection and Site Acceptance” falls below the warranted level specified by
the Contract and as far as no remedy is brought by Contractor, or
(d) that this Contract was terminated by Contractor’s breach as specified in Article 19.2.
Whenever any amount has been withdrawn by KARI due to such cases of (a), (b) or (c) as above,
performance bond shall be replenished.
7.3
The letter of credit shall be issued by first class international bank acceptable to KARI. The letter of credit
shall be drawn in favor of KARI and advised through the Woori Bank (Daejeon Branch at 29 Munye-ro,
Seo-gu, Daejeon, 35241 Korea, Tel: +82-42-488-9704, (Ext. 312)/ Fax: +82-505-003-0759) and the letter
of credit or cash deposit shall remain valid until the end of warranty expiration. The letter of credit shall
not be amended, modified or canceled without KARI's prior written consent.
7.4
It is hereby agreed between the Parties that payment from the Performance Bond under this Article 7 shall
not affect any other KARI's rights, privileges, interests or remedies under this Contract or the applicable
law.
2016. 11
26
Space Test Division
Article 8. Deliveries
8.1
General
8.1.1
Contractor shall deliver Deliverable Item in accordance with the defined schedule and method as set forth
in Appendix B-1 “Statement of Work”.
8.1.2 Contractor shall bear any charges or costs of whatsoever nature that are incurred in relation to such
delivery or provision until such delivery or provision is duly made under this Contract without any non-
conformity and accepted in accordance with Article13 “Inspection and Site Acceptance” hereof, and shall
keep KARI free from any such charges and costs.
8.1.3 Contractor agrees that delivery or provision of time and place under this Contract, whether specifically
provided for or not, or in subsequent amendments thereto, are of the essence of this Contract.
8.1.4 Contractor shall be responsible for all applicable taxes imposed outside Korea including any customs
duties and charges of any nature levied on Deliverable Item, spare parts, spare materials, tools,
consumables and ancillary equipment as well as any charges associated with the transportation.
8.2
Delivery to KARI
8.2.1 Contractor shall deliver Deliverable Item under the rule of FCA France airport (Free Carrier with the
Incoterms 2010) for Hydraulic supply system and the rule of FOB France seaport (Free on Board with the
Incoterms 2010) for Wood shims in accordance with the delivery schedule of this Contract.
8.2.2 Unless otherwise mutually agreed, Contractor shall make the deliverable items ready for shipment and
shall hand over to the KARI's Carrier or Forwarding Agent (Cargo King B.V :Tel: +31 20 405 3230, Attn:
Mr. Willis Shin, willis.shin@cargoking.eu) in accordance with the delivery schedule of this Contract.
8.2.3 To obtain import certification, Contractor shall notify KARI by e-mail (address is “acoust@kari.re.kr” for
Mr. Jong-Min IM and “jncho@kari.re.kr” for Mr. Jung-Nam CHO) fourteen (14) calendar days prior to
each shipment with one set of proforma invoice and packing list specifying the number of boxes, name of
Items, unit price, and size and volume of each container or box to be shipped. As soon as each shipment
as provided for in this Article is made, Contractor shall send one (1) copy of the following shipping
documents to KARI by e-mail;
(a) Clean on board vessel bill of lading/or airway bill of lading,
(b) Commercial invoice,
(c) Packing list,
(d) Weight and measurement list,
(e) Manufacturer's Inspection Report,
(f) Certificate of Origin issued by Contractor, and
(g) Export License (if possible).
2016. 11
27
Space Test Division
Article 9. Delay
9.1
Excusable Delay
9.1.1
Neither Party shall be responsible to the other Party for any delay in performing its obligations under this
Contract due to any Events of Force Majeure.
9.1.2
The Party whose performance of obligations hereunder has been affected by any Events of Force Majeure
shall notify the other Party within ten (10) days thereafter by sending a detailed statement and sufficient
evidence with respect thereto, and promptly of any subsequent change in the circumstances, if any. The
affected Party shall exercise its best efforts under the circumstances to remove or remedy the Events of
Force Majeure and the effects thereof and resume full performance hereof as soon as possible.
9.1.3
Notwithstanding Article 9.1.1 hereof, any such delay that has not been notified to the other Party or any
delay of performance of the affected Party falling due after delay, failure or incompleteness in exercising
the pertinent best efforts to remove or remedy the pertinent Events of Force Majeure or the effects thereof
pursuant to Article 9.1.2 hereof shall not be excused for any reason whatsoever.
9.1.4
The Party who has received or is entitled to duly receive the notice of Events of Force Majeure under
Article 9.1.2 hereof may suspend performance of its obligations which shall be due subsequent to such
Events of Force Majeure, until the other Party has effected such delayed performance to the full extent
after and in view of such Events of Force Majeure.
9.2
Non-Excusable Delay
9.2.1
In the event that, unless otherwise excused by virtue of this Contract, any reason attributable to KARI or
the governing or applicable law, Contactor delays the provision or delivery of Deliverable Items as
stipulated under this Contract, Contractor shall pay for damages as defined in the Article 9.2.2 to KARI
as a result of such delay.
9.2.2
Contractor acknowledges and agrees that the timely provision or delivery of the Deliverable Item as
stipulated under this Contract or its performance of other obligations under this Contract is essential to
KARI, and that such delay as provided for in Article 9.2.1 hereof may cause substantial financial loss or
damage to KARI’s rights, interests, privileges and benefits, which may not be assessable or recoverable.
Both Parties therefore specifically agree that in the event of such loss or damage caused by delay
attributable to Contractor, its Subcontractor or any of its agents, Contractor shall pay KARI as liquidated
damages zero point one five percent (0.15%) of Contract Price per day of such delay. In no case, however,
shall the aggregated liquidated damages exceed ten percent (10%) of Contract Price. It is also agreed by
both Parties that KARI shall be entitled to terminate this Contract for Contractor’s breach, only if the
aggregated liquidated damages under this Article, excluding those days of delay excused by KARI in
writing, exceeds ten percent (10%) of the Contract Price.
9.2.3
This Article shall not affect other remedies, rights, privileges, interests, benefits of KARI under this
Contract or the governing or applicable law.
9.2.4
For the purpose of this Article, any action or omission of Contractor’s Subcontractor, agent, or servant,
de facto or de jure, shall be deemed to be Contractor’s own.
2016. 11
28
Space Test Division
Article 10. Taxes and Duties
10.1
In the event taxes are charged in Korea, KARI shall be fully responsible for payment of such taxes.
Contractor shall be fully responsible for the payment of all applicable taxes imposed outside Korea
including any customs duties and charges.
10.2
If Korean corporation tax is required to be withheld from amounts paid or payable to Contractor under
this Contract (herein referred to as ‘Applicable Tax’), KARI shall withhold the Applicable Tax and pay
on behalf of Contractor the relevant Korean taxing authority in accordance with applicable Korean law
and international tax treaty between Korea and Germany.
10.3
In case KARI pay the Applicable Tax on behalf of Contractor, KARI shall forward proof of the withheld
Applicable Tax to the Contractor within ninety (90) days of payment.
10.4
Neither Party shall be responsible for paying the customs duties, and related taxes, fees, or charges for
the personnel and the personal belongings of the other Party.
10.5
The Contractor shall further comply with instructions KARI may issue from time to time in order to
facilitate any exemptions or reductions from customs duties and other taxes that might be levied on
KARI and shall impose the same obligations on its Subcontractors.
2016. 11
29
Space Test Division
Article 11. Intellectual Property
11.1
KARI shall own and have a right to use, without any obligation, Deliverable Items provided by Contractor
in its performing this Contract. Contractor shall take all necessary precautions so that all the Deliverable
Items supplied hereunder shall be free from infringement of any patent, design patent, trademark, utility
model or any other industrial property right, copyright, license or any other right thereunder of any Third
Party.
11.2 In the event that any Party other than Contractor claims or threatens to claim infringement by KARI with
respect to such use of the Deliverable Items, Contractor shall defend, hold harmless, and indemnify KARI
from such infringement claims.
11.3 This Article will survive the completion of the Contract, any termination, cancellation or expiration of the
Contract in any manner whatsoever.
2016. 11
30
Space Test Division
Article 12. Factory Acceptance
12.1
The Factory Acceptance of Hydraulic Supply System shall occur only after:
(a) all specified tests to be performed by the Contractor under the Contract for the Hydraulic Supply
System have been completed in accordance with the Contract; and
(b) the Contractor has demonstrated to KARI that the Hydraulic Supply System meet the specifications
and requirements in this Contract; and
(c) all Works and conditions under the Contract to be fulfilled by the Contractor prior to the shipment
of Hydraulic Supply System have been met,
in which case KARI shall accept, in writing, the Hydraulic Supply System subject to the provisions set
forth below.
12.2
Subject to the conditions as set forth in Article 12.1 above, a Factory Acceptance of Hydraulic Supply
System shall be occurred in accordance with Appendix B-1 “Statement of Work”. After the FAR, KARI’s
authorized representative shall notify the result of FAR in writing. If KARI determines that Hydraulic
Supply System is unacceptable, it shall notify the Contractor, in writing, the reasons therefore.
12.3
If Hydraulic Supply System is determined to be unacceptable, Contractor shall, at its expense, promptly
repair or replace Hydraulic Supply System so that it shall comply with the Contract specifications and
requirements, and Contractor shall hold the additional FAR of such repaired or replaced Hydraulic Supply
System for KARI’s confirmation. The Contractor shall present to KARI the root cause and the result of
such repair or replacement on the additional FAR. Such repaired or replaced Hydraulic Supply System
shall be accepted in accordance with the requirements of Article 12.1.
12.4
For the FAR, KARI, at all times during the performance of this Contract, shall have the right to do the
following activities at the Contractor’s facilities or other relevant facilities under this Contract;
(a) Access the Items, testing activities and data, related to, used for, prepared or generated in connection
with this Contract, and
(b) Witness all qualification and acceptance testing of the Deliverable Items to be delivered or provided
under this Contract including all tests used for demonstrating qualification.
12.5 Contractor shall make such data and documentation, equipment and facilities available to KARI upon
KARI’s request and KARI’s selection for such purposes. Contractor shall deliver copies of design and
test data and other technical data, excluding financial data, required to evaluate technical problems or
non-performance that may occur during the performance of this Contract. Such documentation and data
shall also be available for KARI to make copies thereof.
2016. 11
31
Space Test Division
Article 13. Inspection and Site Acceptance
13.1
Notwithstanding the successful FAR, KARI shall carry out incoming inspection of the Deliverable Item
after delivery within one (1) week after delivery. In the event that KARI discovers that any Deliverable
Item provided or delivered pursuant to Article 8 “Deliveries” are defective or non-conformity during the
incoming inspection, KARI shall promptly notify Contractor thereof and provided that such defect or non-
conformity is not attributable to KARI, Contractor shall promptly remedy such defect or non-conformity
and retest. In addition, if remedying such defect or non-conformity would substantially delay as compared
to the period required to complete such substitution, Contractor shall promptly provide substitute Items.
Upon the remedy of such defect or non-conformity that the requirements of this Contract are satisfied in
all respects or upon the provision of substitute Items, Contractor shall notify KARI of the details of the
remedy undertaken by Contractor.
13.2
If Hydraulic Supply System is determined to be unacceptable, both Parties shall jointly investigate the root
cause and if the root cause is attributable to the Deliverable Item, then it shall be considered as non-delivery
and Contractor shall, at its expense, promptly repair or replace Hydraulic Supply System so that it shall
comply with the Contract specifications and requirements. Such repaired or replaced Item shall be
accepted in accordance with the requirements of Article 13.1.
13.3
The Parties agree that the acceptance of the Deliverable Item under this Article shall not be interpreted or
construed to mean that such Item is free of all defects and conform in all respects with the requirements
of this Contract, and Contractor shall not be entitled to any additional costs incurred or to recover any
damages suffered due to defects in the Item or KARI’s rejection of the Item.
2016. 11
32
Space Test Division
Article 14. Monitoring and Access
14.1
KARI, at all times during the performance of this Contract, shall have the right to do the following
activities at the Contractor’s facilities, Subcontractor’s facilities, supplier’s facilities, or other relevant
facilities under this Contract;
(a) Monitor the Contract performance of Contractor, and
(b) Access the Items in progress, and any design, manufacturing, and testing activities and data,
including development and engineering model testing, related to, used for, prepared or generated
in connection with this Contract, and
(c) Witness all qualification, protoflight, and acceptance testing of all Items to be delivered or
provided under this Contract including all tests used for the purpose of demonstrating
qualification.
14.2 Contractor shall make such data and documentation, equipment and facilities available to KARI upon
KARI’s request and KARI’s selection for such purposes. Contractor shall deliver copies of design and
test data and other Technical Data, excluding financial data, required to evaluate technical problems or
non-performance that may occur during the performance of this Contract. Such documentation and data
shall also be available for KARI to make copies thereof.
14.3
Contractor shall obtain from any of its Associates access by KARI, upon reasonable advance notice to
Contractor, to any pertinent facilities, Work in progress and Technical Data of any of Contractor’s
Associates to inspect Work in progress under this Contract. Contractor shall dispatch its representative or
a technical manager authorized to act on behalf of its representative to accompany KARI’s access
hereunder.
14.4
KARI shall have access to all Technical Data in the Contractor’s control that are required for the
development of the hydraulic supply system and technical support under this Contract.
14.5
If, during the performance of this Contract, the KARI representative or any person designated by KARI
reasonably determines that any of the provisions or delivery of any Items or Contractor’s performance of
its other obligations under this Contract does not conform to the requirements of this Contract, the KARI
representative shall promptly notify the Contractor, and confirm such notification in writing within ten
(10) days, of the particulars in which such provision, delivery or performance does not meet the
requirements of the Contract. The Contractor, upon receipt of such notice, shall promptly make the
corrections of such non-conformity and notify KARI of the result of such corrections, or, if such prompt
corrections are not possible, notify KARI of the reason why such prompt corrections are not possible and
the period required for the corrections.
2016. 11
33
Space Test Division
Article 15. Indemnification
15.1
Contractor shall indemnify and hold KARI, its officers, agents, servants, employees, subsidiaries,
successors, and assignees, or any of them, harmless from any and all loss, damage, liability or expense
resulting from damage to all tangible property and injuries including death, to all persons, in the
circumstances caused by its act or omission in the performance of the Work, and shall pay all expenses,
including reasonable attorneys’ fees, and satisfy all judgments as may be incurred by or rendered against
them, or any of them.
2016. 11
34
Space Test Division
Article 16. Licenses, Clearances and Permits
16.1
Unless otherwise specified in this Contract, each Party is responsible for obtaining all government
approvals from any government authority which has jurisdiction and authority to require such approvals,
including, but not limited to, licenses, visas, and permits necessary to carry out such Party’s obligations
in accordance with this Contract. KARI is responsible for obtaining any necessary Korean government
approvals, and Contractor is responsible for all other government approvals.
16.2
The Parties shall cooperate and provide each other, upon request of and without cost to the other Party,
all reasonable and necessary support in obtaining any and all governmental approvals, which they
respectively are required to obtain pursuant to this Contract.
16.3
Each Party shall be solely responsible for any expenses incurred in obtaining the approvals, which are
required under this Article. The Parties shall provide to each other, upon request of and without cost to
the other Party, suitable documents or other reasonable evidence to show that they have obtained any and
all governmental approvals, which they respectively are required to obtain pursuant to this Contract.
16.4
Contractor shall obtain the export license for the export and/or re-export of all Deliverable Items to
Korea, from Contractor’s government and all other governments other than Korean government, and
for the re-export to Launch site for the transportation of Deliverable Items based upon KARI’s
information. In the event that Contractor fails to obtain the above export licenses, within six (6) months
from the EDC, KARI has the right to terminate this Contract in accordance with Article 19.2. In the
event that Contractor obtains the above export licenses conditionally within six (6) months from EDC,
if KARI determines that such conditions imposed on the export licenses significantly affects the
Launch of KPLO, Article 19.2 shall be applied to as a same manner.
2016. 11
35
Space Test Division
Article 17. Confidentiality
17.1
Each Party shall confidentially treat all documents, data, materials and information supplied by one to
the other, and shall not disclose the above to any Third Party, and shall not use the above for any other
purpose than for the performance of this Contract without prior written consent from the other Party.
However, this Confidentiality obligation shall not be apply to the information which is made available to
the general public.
2016. 11
36
Space Test Division
Article 18. Warranty
18.1
Any patent, utility, design, copyright, technical know-how and any other type of intellectual property
used by Contractor, its Subcontractors, servants, or agents, or delivered or provided to KARI directly or
indirectly in connection with this Contract shall be free of any infringement actions by any Third Party
claiming its rights or interests with regard thereto in disposing with in accordance with this Contract.
18.2
The Deliverable Item and its installation supplied and performed by Contractor or its Subcontractors
hereunder shall be in good working order and free from all defects in workmanship and materials and
shall comply with the requirements of this Contract. Warranty period for the Deliverable Item shall be
one (1) year from the completion date of Inspection and Site Acceptance to KARI.
18.3
Upon the receipt of written notification from KARI that the Deliverable Item delivered by Contractor or
its Subcontractors is defective or non-confirming, the Contractor shall repair or replace, at Contractor’s
option and its own expense, such Deliverable Item so as to comply with the above warranties.
18.4
The Contractor shall not be entitled to any additional costs (for instance, the cost for the repair or
replacement of faulty parts at its option, the labor cost required for repair, traveling cost, per diem and all
associated necessary costs) incurred or to recover any damages suffered due to defect in the Deliverable
Item or rejection of the Deliverable Item by KARI.
18.5
Contractor shall submit the written plan for repair within forty eight (48) hours after the reception of
KARI’s notification of fault and shall completely finish the repair within the agreed time period after the
receipt of KARI’s written notification of fault.
18.6
For an urgent service during any important test period using the Hydraulic Supply System, The remedy
of warranty is five (5) days from the receipt of KARI’s written notification of service. To meet the
deadline of the urgent service, KARI will notify Contractor of the test start date and the period two (2)
weeks prior to the test start date. Contractor shall stand by the A/S crews at Contractor's convenient place
during the test period (up to four (4) weeks). Contractor shall include a plan for these requirements.
18.7
Both Parties acknowledge that the breach of a warranty may result in serious damages to KARI’s right,
interests, privileges, and benefits, de facto or de jure, or loss of KARI’s profits. If a breach of warranty
has not been cured within thirty (30) days from the date of KARI’s written notification to Contractor of
such breach, Contractor shall pay all the damages to KARI due to the breach of any warranty or KARI
shall have the right to terminate this Contract in accordance with Article 19.2.
18.8
The right and remedies provided under this Article 18 are in addition to any other rights or remedies
available to KARI under the Contract or applicable laws.
2016. 11
37
Space Test Division
Article 19. Termination
19.1
Termination for Events of Force Majeure
19.1.1 In the event that the excusable delay under Article 9 “Delay” exceeds three (3) months for any single
Events of Force Majeure or six (6) months in the aggregate for all Events of Force Majeure, KARI, at its
sole discretion, may declare frustration of this Contract, and terminate the whole or any part of this
Contract by sending a three (3) days prior notice to the Contractor.
19.1.2 In the event this Contract is terminated by Article 19.1.1 above, each Party shall effect the restitution to
the other Party of whatever is provided, delivered, or paid to it in the same manner and types as such
provision, delivery or payment was made.
19.2
Termination for Breach
19.2.1 KARI may, by written notice to the Contractor, terminate the whole or any part of the Contract, if any of
the following circumstances occurs;
(a) Contractor fails to deliver any Deliverable Item under Contract in accordance with the delivery
schedule; or
(b) Contractor fails to perform any Work under this Contract or fails to progress with the Work in a
manner which satisfies KARI that Contractor will perform the Contract within the time specified and
in accordance with the terms of the Contract; or
(c) Contractor fails to remedy any or all defects and non-conformity on the Deliverable Item in
accordance with Article 13.
19.2.2 In the event of the circumstances in Article 19.2.1, KARI may notify the Contractor and may suspend
any further performance of its obligation under this Contract. If the Contractor fails, within ten (10) days
from the dispatch of the notice, to produce and notify KARI of reasonable evidence of its intent and
ability to effect due performance of the obligation in breach within thirty (30) days from due dispatch of
written notice, then KARI may terminate this Contract with three (3) days’ prior notice of termination.
19.2.3 In the event this Contract is terminated for Contractor’s breach, the Contractor shall return all the amounts
paid by KARI under the Contract and also pay the termination charge of ten percent (10%) of the total
Contract Price. KARI shall return the Deliverable Item to Contractor, if any.
19.3
Termination for Special Circumstances
19.3.1 Either Party may terminate this Contract anytime upon or after due dispatch of notice of such effect,
without any other conditions, in the event that the other Party falls within any of the following categories:
(a) the other Party has fallen bankrupt or insolvent;
(b) the other Party passed a resolution for its reorganization (bankruptcy related), dissolution, liquidation
or winding-up; or
(c) a court order for proceedings for the bankruptcy, reorganization (bankruptcy related), dissolution or
winding-up of the other Party has been applied for by any person and such application has not been
dismissed within sixty (60) days.
19.3.2
In the event this Contract is terminated by Article 19.3.1 above, each Party shall effect the restitution to
the other Party of whatever is provided, delivered, or paid to it in the same manner and types as such
provision, delivery or payment was made.
19.4
Termination for Convenience
19.4.1 KARI may terminate this Contract, in whole or in part, for its convenience, with thirty (30) days’ prior
written notice to Contractor. In case of such termination for convenience, Contractor is entitled to receive
payment due which Contractor has already done in accordance with Article 6.1.2 within thirty (30) days
from the date of termination and KARI shall release performance bond at the same time.
2016. 11
38
Space Test Division
Article 20. Resolution of Disputes and Governing Law
20.1
In cases any controversy or claim arises out of or in relation to this Contract or with respect to a breach
hereof, the Parties shall seek to resolve the matter amicably through discussions between themselves. In
the event of any disagreement between KARI and Contractor about the interpretation of the provisions
or definitions used in this Contract, the interpretation of KARI shall govern until and unless otherwise
decided by arbitration conducted pursuant to the following provisions.
20.2
If the Parties cannot resolve such controversy or claim in accordance with Article 20.1 above, it shall be
finally settled by arbitration in Seoul, Korea, before the Korean Commercial Arbitration Board in
accordance with its rules. The proceedings shall be conducted in English. The award rendered by the
board shall be final and binding on the Parties and may be entered in any court of competent jurisdiction
for execution.
20.3
The validity, performance, construction, and effect of this Contract shall be governed by the laws of
Korea.
2016. 11
39
Space Test Division
Article 21. Language and Units
21.1
This Contract shall be executed in English.
21.2
All documents, drawings, plans and other writings as well as communications between both Parties shall
be in English.
21.3
Measurements and quantities for deliverable documentation shall be recorded in units of Système
Internationale.
2016. 11
40
Space Test Division
Article 22. Effective Date of Contract
22.1
The effective date of this Contract ("EDC") is the date when the duly authorized
representatives of both Parties have signed this Contract.
22.2
Any amendment to this Contract shall be effective upon signature by the authorized
representatives of both Parties and the approval of such amendment by the government of
both Parties, if required.
2016. 11
41
Space Test Division
Article 23. Changes
23.1
Changes Requested by KARI
23.1.1 Any changes requested by KARI during the performance of this Contract, within the general
scope of this Contract, which would add or delete Work, affect the design of Work, change
the method of shipment or packing, place or time of delivery, duration of Contract, or would
affect any other requirement of this Contract, shall be submitted in writing to Contractor.
Contractor shall respond to any changes KARI requested in writing within thirty (30) days
after receipt of such request. If such change requested by KARI causes an increase or
decrease in the Contract Price and/or an impact of schedule, Contractor shall submit to KARI
at the time the response to the requested change is submitted, the details of such increase or
decrease.
23.1.2 KARI shall notify Contractor in writing, within thirty (30) days after receipt of Contractor’s
response, whether it agrees with and accepts Contractor’s response. If KARI agrees with
and accepts Contractor’s response, an amendment to the Contract reflecting such change,
Contract Price and/or schedule adjustment, if any, shall be issued, and Contractor shall
proceed with the performance of the Contract as changed. Contractor shall provide updated
information that reflects the final agreed price of the change, if KARI requests. In the event
the Parties are unable to agree on a change requested by KARI or price adjustment, if any,
or both, Contractor shall proceed with the performance of the Contract as unchanged.
23.2
Changes Requested by Contractor
23.2.1 Any changes requested by Contractor during the performance of this Contract, within the
general scope of this Contract, that would add or delete Work, affect the design of Work,
change the method of shipment or packing, place or time of delivery, duration of Contract,
or would affect any other requirement of this Contract, shall be submitted in writing to KARI
thirty (30) days prior to the proposed date of the change. If such change requested by
Contractor causes an increase or decrease in the Contract Price, Contractor shall submit to
KARI at the time the requested change is submitted, the details of such increase or decrease.
23.2.2 KARI shall notify Contractor in writing within thirty (30) days after receipt of the requested
change and Contract Price adjustment, if any, whether or not it agrees with and accepts such
change. If KARI agrees with and accepts change requested by Contractor, an amendment to
the Contract reflecting such change, and Contract Price adjustment, if any, shall be issued,
2016. 11
42
Space Test Division
and Contractor shall proceed with the performance of the Contract as changed. Contractor
shall provide updated information which reflects the final agreed price of the change, if
KARI requests. In the event the Parties are unable to reach an agreement on a change
requested by Contractor, or Contract Price adjustment, if any, or both, Contractor shall
proceed with the performance of the Contract as unchanged.
2016. 11
43
Space Test Division
Article 24. Notices
24.1
All notices, requests, demands, approvals, reports, invoices, and other correspondence to be
provided pursuant to this Contract shall be in writing and shall be deemed to have been duly
given to the Party to be notified: (i) on the date of delivery if delivered in person, (ii) on the
date of dispatch if by facsimile, telex or e-mail, or (iii) on the date of receipt if by registered
airmail or overnight courier.
All notices shall be addressed to the appropriate Party at its address as follows:
For KARI: Korea Aerospace Research Institute
169-84 Gwahakro, Yuseong-gu, Daejeon 34133, Korea
Commercial matters
Technical matters
Mr. Jung-Nam CHO
Tel: +82-42-860-2613
Fax:+82-42-860-2666
E-mail: jncho@kari.re.kr
Mr. Jong-Min IM
Tel: +82-42-860-2562
Fax:+82-42-860-2234
E-mail: acoust@kari.re.kr
For Contractor: Contractor
address
Commercial matters
Technical matters
Mr. TBD
Tel: +TBD
Fax: +TBD
E-mail: TBD
Mr. TBD
Tel: +TBD
Fax: +TBD
E-mail: TBD
24.2
Each Party may change its address for notice by notice given to the other Party in the manner
set forth above. And any notices given as provided herein shall be considered effective seven
(7) days after the registered postage pre-paid airmailing thereof or the day of actual receipt
thereof, whichever occurs first, or on the day of personal delivery, or the day of sending if
by facsimile, telex or e-mail.
2016. 11
44
Space Test Division
Article 25. Miscellaneous
25.1
Effective Date of the Contract
The effective date of this Contract ("EDC") is the date on which the duly authorized
representatives of both Parties have signed this Contract, and any amendment to this
Contract shall be effective only upon signature by the authorized representatives of both
Parties.
25.2
Entire Agreement
This Contract embodies the entire agreements of the Parties with respect to the subject matter
hereof and supersedes and cancels any and all prior understandings or agreements, oral or
written, in relation hereto, which may exist between the Parties. No oral explanation or oral
information by any of the Parties shall alter the meaning or interpretation of this Contract.
25.3
Assignability
This Contract and each and every covenant, term and condition hereof shall be binding upon
and inure to the benefit of the Parties and their respective successors, and neither this Contract
nor any rights and obligations hereunder shall be assignable or delegable directly or indirectly
by either Party without the prior written consent of the other Party.
25.4
Unenforceable Terms
If any term or provision of this Contract shall for any reason be invalid, illegal or
unenforceable in any respect, this Contract shall be interpreted and construed as if such term
or provision had never been included herein.
25.5
Non-waiver
The failure or delay of any Party to require performance by the other Party of any provision
of, or of any right or obligation under this Contract, shall not constitute a waiver thereof, nor
shall such affect that Party’s right to thereafter require performance of such or any other
provision, right or obligation.
25.6
Disclaimer of Agency
2016. 11
45
Space Test Division
This Contract shall not be deemed to constitute any Party to become the agent of the other
Party.
25.7
Headings
The headings in this Contract have been inserted for convenience of reference only and are
not to be used in consulting or interpreting this Contract.
25.8
Language and Unit
All documents, drawings, plans and other writings as well as communications between both
Parties under this Contract shall be in English and measurements and quantities for
Deliverable Data shall be recorded in units of Système Internationale.
25.9
Time Limits
Unless otherwise indicated, any time limits to which this Contract binds Contractor or KARI
shall be counted in calendar days from the day following that of the event marking the start
of the time limit, and shall end on the last day of the period specified. When the last day of a
time limit is a Saturday or Sunday, or a legal holiday in the country in which the particular
contractual performance is required, such time limit shall be extended to the first working day
following.
25.10
Subcontractors
Each Party shall be fully responsible for the work of its Subcontractors under this Contract,
and such subcontracting shall not relieve that Party of its obligation under this Contract.