Request For Proposal 

For 

Hydraulic Supply System for Pad-Bearing 

and Technical Support 

 

November 2016 

 

Space Test Division 

Korea Aerospace Research Institute 

 

169-84 Gwahangno, Yuseong-gu, Daejeon, 305-806, 

KOREA 

Phone : 82(42)860-2562, Fax : 82(42)860-2234 

 

 

KARI PROPRIETARY 

 

 


background image

 

 

2016. 11 

 

 
 
 

Space Test Division 

Request For Proposal 

for 

Hydraulic Supply System   

for Pad-Bearing and Technical Support 

 

 

IMPORTANT 

 

1. This RFP should be kept in confidentiality and should neither 
be copied nor distributed to the third parties. 

 

2. The  questions  and  opinions  on  this  RFP  can  be  asked  or 
suggested  to  Korea  Aerospace  Research  Institute  before 
submission of the proposal. 

 

3. This  RFP  shall  be  legal  bind  after  the  contract  is  awarded 
unless  the  bidder  explicitly  expresses  the  differences  from  the 
RFP in the compliance sheet. 

 

 

November 2016 

Space Test Division 

Korea Aerospace Research Institute 

169-84 Gwahangno, Yuseong-gu 

DAEJEON, 305-806, KOREA 

Phone : 82(42)860-2562, FAX : 82(42)860-2234 

e-mail :acoust@kari.re.kr 

 

 


background image

 

 

2016. 11 

 

 
 
 

ii 

Space Test Division 

Table of Contents 

I. 

OVERVIEW ........................................................................................................................ 1 

1.  OVERVIEW OF THE PROJECT ................................................................................................ 1 

2.  REQUISITES OF PARTICIPANTS ............................................................................................. 1 

3.  DELIVERABLES .................................................................................................................. 2 

4.  WARRANTY ....................................................................................................................... 2 

5.  PRODUCT SUPPLY SCHEDULE .............................................................................................. 2 

6.  PAYMENT SCHEDULE .......................................................................................................... 2 

II. 

STATEMENT OF WORK ............................................................................................... 4 

1.  TOTAL SYSTEM CONFIGURATION ........................................................................................ 4 

2.  TECHNICAL REQUIREMENTS OF HYDRAULIC SUPPLY SYSTEM FOR PAD-BEARING.................... 5 

3.  TECHNICAL REQUIREMENTS OF WOOD SHIMS .................................................................... 10 

4.  TECHNICAL REQUIREMENTS OF TECHNICAL SUPPORT ......................................................... 10 

III. 

FORMAT OF PROPOSAL ........................................................................................... 11 

IV. 

INSTRUCTION TO BIDDERS .................................................................................... 13 

1.1. 

QUALIFICATION OF BIDDERS ......................................................................................... 13 

1.2. 

SUBMITTAL OF PROPOSAL ............................................................................................. 13 

1.3. 

BIDDING SCHEDULE ..................................................................................................... 14 

1.4. 

VALIDITY OF PROPOSAL ................................................................................................ 14 

1.5. 

BID BOND .................................................................................................................... 14 

1.6. 

QUESTIONS AND MODIFICATIONS .................................................................................. 14 

1.7. 

NO CONTRACTUAL OBLIGATION ................................................................................... 14 

1.8. 

ACCEPTANCE/REJECTION OF BIDS ................................................................................. 15 

1.9. 

SELECTION OF SUCCESSFUL BIDDER ............................................................................. 15 

1.10. 

CONTRACT ............................................................................................................... 15 

1.11.  LANGUAGE AND MEASUREMENT UNIT .......................................................................... 15 

1.12. 

PRICING REQUIREMENTS .......................................................................................... 15 

1.13. 

CERTIFICATE AND GOVERNMENT APPROVALS ............................................................ 15 

1.14. 

CONFIDENTIALITY .................................................................................................... 15 

1.15. 

WITHDRAWAL OF PROPOSAL ..................................................................................... 15 

1.16. 

PROPERTY OF PROPOSAL ........................................................................................... 15 

1.17. 

EXPENSES ................................................................................................................ 16 

1.18. 

GOVERNING LAW ..................................................................................................... 16 

1.19. 

ARBITRATION ........................................................................................................... 16 

V.  GENERAL TERMS AND CONDITION .......................................................................... 17 


background image

 

 

2016. 11 

 

 
 
 

Space Test Division 

I.  OVERVIEW 

 
1. 

Overview of the project 

 

1.1 

To  increase  the vibration  shaker  capability  and  improve  the  accessibility  to  satellite for  the 
safe environmental testing, new QUAD vibration system is built. 

 

 

1.2 

KARI acknowledge the necessity of hydraulic supply system for pad bearings and technical 
support for head expander manufacturing in KARI QUAD vibration system and KARI wants to 
procure hydraulic supply system and related technical support 

 

1.3 

The purposes of this project are ; 

1.3.1 

To supply the hydraulic supply system for pad bearing   

1.3.2 

To supply the wood shims 

1.3.3 

To supply technical support for magnesium head expander 
manufacturing 

 

1.4 

The supplier should submit the proposal to KARI.   

1.5 

All the  descriptions  in  this  RFP  are minimum  requirements  and  the  supplier  can  suggest  a 
better one to improve the overall performance and cost. But in this case, the proposal should 
clearly indicate the improvements from KARI’s requirements. 

 

2. 

Requisites of participants 

 

2.1 

The participants shall also have experience in manufacturing and delivery of a 3m vibration 
system 

 


background image

 

 

2016. 11 

 

 
 
 

Space Test Division 

 
3.  Deliverables 
 
The hardware deliveries & technical support shall include, as a minimum, the following: 
 

Description (set) 

Hardware supply 

Hydraulic supply system 

Wood shims 

Shim 1 (4ea) 520 x 500 (T) 280 

Shim 2 (4ea) 520 x 500 (T) 253 

Shim 3 (32ea) 520 x 500 (T) 230 

Technical Support 
  Services 

1.First visit: Report for support for Mg. welding & heat treatment 

2. Second visit: Report for inspection of guiding box in H/E 

3. Third visit: Report for support on the machining process 

 
 
4.  Warranty   
 
5.1 

The system shall be warranted for a duration of 1 year from the completion date of Inspection 
and Site Acceptance to KARI. 

   
5.2 

The warranty covers the replacement of faulty parts, the labor required for repair, traveling cost, 
living fees and all associated necessary costs.   

 
5.3   

The contractor or A/S teams shall submit the written plan for repair within 48 hours after the 
reception  of  the  notification  of  fault.  The  contractor  or  A/S  teams  shall  completely  finish  the 
repair within 30 days after the reception of the notification of fault.   

 
5.  Product Supply Schedule   

 

The contractor shall meet the key points schedule as below; 

Items 

Key Points Schedule 

Hydraulic Supply 

System 

Factory Acceptance Test at Contractor site   
: February 2017 

 
6.  Payment Schedule 

 

The KARI will pay to Contractor the Contract Price in accordance with the following schedule:

   

(a)  Hardware supply 

 

No. 

Payment milestone 

(in Month) 

Payment due date 

Percentage of 

Contract Price (%) 

1

 

EDC 

 

EDC+ 1M

 

30 


background image

 

 

2016. 11 

 

 
 
 

Space Test Division 

2

 

FAR (EDC+ 2M)

 

EDC+ 3M

 

60 

3

 

Inspection of Hydraulic 

Supply System 

(EDC+ 4M)

 

EDC+ 5M

 

10 

Total 

100 % 

*    “EDC” means the Effective Date of this Contract. 
*    “FAR” means the Factory Acceptance Review at Contractor site. 
 

(b) Technical Support Services 

No. 

Payment milestone 

(in Month) 

Payment due date 

Percentage of 

Contract Price (%) 

1

 

EDC 

 

EDC+ 1M

 

40 

2

 

Delivery of report 

(EDC+ 3M)

 

EDC+ 4M

 

60 

Total 

100 % 

 
 
 
 
 

 


background image

 

 

2016. 11 

 

 
 
 

Space Test Division 

 

II.  Statement of Work 

 
1. 

Total System Configuration 

 

This document covers the technical requirements applicable to the oil supply system for pad bearing 
and technical support in KARI QUAD vibration system. 

 

To control the overturning moment during the vertical vibration testing, 16 pad-bearings are installed 
which  was  designed  so  that  a  compression  status  between  the  bearings  and  slide  plates  is  always 
maintained (minimum compression force of 90kN at each bearing). 
The configuration of 16 pad bearings are shown in below. 
The roles of pad bearing oil supply system (oil supply system for abbreviation) are to supply    hydraulic 
oil for pad bearing operation, to monitor oil flow and to control the safety operation of bearings including 
other components of shaker system.   
 

 

  <Configuration of pad-bearings> 

 


background image

 

 

2016. 11 

 

 
 
 

Space Test Division 

 

< Configuration of electrical cabinet for hydraulic group> 

 

2. 

Technical Requirements of hydraulic supply system for pad-bearing 

During this work package the following tasks shall be performed: 

 
2.1.1 

Design 

The design of the hydraulic supply system shall be carried out to manage KARI existing pad bearing 
and potential future bearings. 
The design of oil flow monitoring unit shall be carried out to monitor the oil flow from oil supply to pad 
bearings. Four oil flow sensor shall be applied as a minimum.   
 
2.1.2 

Manufacturing 

The system hardware shall be manufactured according to the design. All manufacturing operations shall 
be planned in co-ordination with inspections and tests. This planning shall be documented in a concise 
Manufacturing and Inspection Plan. 
 
2.1.3 

Factory acceptance 

The Factory Acceptance objective is to verify that the requirements detailed in technical requirements 
are fulfilled.   
The factory acceptance tests and inspections shall be performed according to a Factory Acceptance 
Plan, which shall identify all the activities to be performed and the requirements intended to be verified. 
The  Factory Acceptance  Review meeting in  order to  review  the  results  of  the implementation  of  the 
Factory Acceptance plan shall be organised.   
 
2.1.4 

Installation 

N/A.   
 
2.1.5 

Support on test of functionalities 

Based on the knowledge of all the functions required for the safety logic diagram (including hydraulic 
groups, H/E over travel, resting pads, air supply), Contractors shall supply test plan and procedures to 
be carried out on the electrical cabinet (including PLC system) which is designed and manufactured by 
KARI sub-contractor 
During  the  warranty  period,  attendance  of  engineer  shall  be  performed  to  support  operation  and  to 
check the functionalities of whole vertical shaker system including safety logic.   
As  a  minimum,  two  weeks  of  period,  engineer  supervises  the  all  functional  test  for  QUAD  vibration 
shaker system at KARI site 
During this period, the contractor should supply the engineering support to solve the problem related 
with QUAD system 
 
In this proposal, hydraulic supply system shall meet the requirements described below. 

     

[Req_1] Design Requirement 

▣   Req_1.1:  Hydraulic  supply  system  shall  be  comprise  hydraulic  group(or  pump)  and  oil  flow 
monitoring unit.   


background image

 

 

2016. 11 

 

 
 
 

Space Test Division 

▣  Req_1.2: The design of system shall be compatible with the use of two types of TEAM corporation 
pad  bearing  system  such  as  410-10  bearings  and  410-12  bearings,  which  compatible  with  KARI 
supplied hydraulic hose and manifold design. 

 

 
 
 

<Specification of bearing 410-10> 

 

[Req_2] Hydraulic Group 
The hydraulic group shall have the following requirement as minimum:   
 

▣  Req_2.1: One supply pump system comprises electrical motor and variable volume pump to supply 
the existing pad bearings and potential pad bearings including hydraulic lines and manifolds. 

  Flow : 50 litters/ min for minimum 
  Pressure : 210 bars minimum   

▣  Req_2.2: One cooling & filtration group comprise: 

  Pump driven by electrical motor (50 litters/min) 
  Heat exchanger chilled water 
  Interface for filling the oil group 
  Filter - 3μm with electrical clogging indicator 

▣  Req_2.3: A tank (300 litters) including: 

  Electrical oil level indicator (two levels) 
  Air filter   
  Temperature probe 
  Oil retention tray 

▣  Req_2.4: Mounting plate fitted with: 


background image

 

 

2016. 11 

 

 
 
 

Space Test Division 

  Oil supply electro-valve 
  Bypass electro-valve 
  Pressure regulator 
  Filtering element - 3μm with electrical clogging indicator 
  Pressure probe 

▣  Req_2.5: Scavenge pump 
 
[Req_3] Oil Flow Monitoring unit 

▣  Req_3.1: Oil flow monitoring unit consists in oil flow meters to be installed on the pressure manifolds 
of the hydraulic system. 

▣   Req_3.2:  To  check  the  operation  status  of  hydraulic  group  and  pad  bearings,  the  design  of 
installation of the flow meters shall be performed such as flow meter selection and definition of hydraulic 
adapters and manifolds. 

▣  Req_3.3: The oil flow monitoring unit shall monitor all bearings status by four positions of oil flow 
sensors as minimum.     
   
[Req_4] Control Panel 
Control panel (electrical panel) shall have the following requirements as minimum: 

▣  Req_4.1:  KARI  subcontract  will  supply  the  control  panel  component  such  as  PLC  hardware  & 
operation programing 

▣  Req_4.3:  Control  panel  shall  operate  all  the  functions  for  the  safety  logical  diagram,  which  is 
supplied  by  KARI,  including  hydraulic  group,  HE  over  travel,  resting  pads  defaults  and  air  supply 
defaults 

▣  Req_4.4: Contract shall supply test plan describing all the tests that must be done to verify the PLC 
and describing the expected results of the system 

▣  Req_4.5: Contractor shall supervise the overall function test in the KARI site. 

▣  Req_4.6: During the maintenance period, KARI will test the all functionalities of electrical cabinet 
including PLC and send a report to Contractor. Contractor shall review the test report. 

 
 

< Functions fulfilled by control panel > 

 

Defaults 

Effect on vibration system 

Oil temperature 

 

High 

Warning lamp flashing 

Too high 

Alarm lamp lighting 
Horn ringing 
Oil pump off 
With pressure ramp down 
B&K interlock 2 open 
B&K interlock 1 open after 5s 

Restart the system 

Default displayed on PLC 
Reset the system from local console 
Start the hydraulic system 

Oil level in the reservoir 

 

Low 

Warning lamp flashing 

Too low 

Alarm lamp lighting 
Horn ringing 
Oil pump off 
With pressure ramp down 
B&K interlock 2 open 
B&K interlock 1 open after 5s 

Restart the system 

Default displayed on PLC 


background image

 

 

2016. 11 

 

 
 
 

Space Test Division 

Reset the system from local console 
Start the hydraulic system 

Filter clogging on HP 
line 

 

High 

Warning lamp flashing 

Too high 

Alarm lamp lighting 

 

Horn ringing 

 

Oil pump off 
With pressure ramp down 

 

B&K interlock 2 open 
B&K interlock 1 open after 5s 

Restart the system 

Default displayed on PLC 
Reset the system from local console 
Start the hydraulic system 

Filter clogging on 
Circulation Line
 

 

High 

Warning lamp flashing 

Too high 

 Alarm lamp lighting 
Horn ringing 
Oil pump off 
With pressure ramp down 
B&K interlock 2 open 
B&K interlock 1 open after 5s 

Restart the system 

Default displayed on PLC 
Reset the system from local console 
Start the hydraulic system 

 
 
 

Defaults 

Effect on vibration system 

Main air pressure supply   
Pressure off 

Alarm lamp lighting 
Horn ringing 
Oil pump on 
B&K interlock 2 open 
B&K interlock 1 open after 5s 

Restart the system 

Remove the default 

 

Reset the system from local console 

 

Start the hydraulic system 

HP oil flow (overall) 

 

Min or max warning 

Warning lamp flashing 

Min or max Alarm 

Alarm lamp lighting 
Horn ringing 
Oil pump off 
With pressure ramp down 
B&K interlock 2 open 
B&K interlock 1 open after 5s 

Restart the system 

Default displayed on PLC 
Reset the system from local console 
Start the hydraulic system 

HP oil flow (for each 
group of 4 bearings)
 

 

min or max warning 

Warning lamp flashing 

Min or max Alarm 

Alarm lamp lighting 
Horn ringing 
Oil pump off 


background image

 

 

2016. 11 

 

 
 
 

Space Test Division 

With pressure ramp down 
B&K interlock 2 open 
B&K interlock 1 open after 5s 

Restart the system 

Default displayed on PLC 
Reset the system from local console 
Start the hydraulic system 

HP oil pressure 

 

Low 

Warning lamp flashing 

Too low 

Alarm lamp lighting 
Horn ringing 
Oil pump off 
With pressure ramp down 
B&K interlock 2 open 
B&K interlock 1 open after 5s 

Restart the system 

Default displayed on PLC 

 

Reset the system from local console 

 

Start the hydraulic system 

HE over travel 

 

up 

1 of the 2 
contacts on 

Alarm lamp lighting 

down 

B&K interlock 1 open 
B&K interlock 2 open after 5s 

Restart the system 

Default displayed on PLC 
Reset the system from local console 
Oil pump on 

 

 

 
 

Defaults 

Effect on vibration system 

Resting 

pad 

default 

when 
vibration ready 

 

Default 

Alarm lamp lighting 
B&K interlock 1 open 
B&K interlock 2 open after 5s 

Restart the system 

Default displayed on PLC 
Reset the system from local console 
Oil pump on 

Resting 

pad 

default 

when 
operating them 

 

Default 

Alarm lamp lighting 

Restart the system 

Default displayed on PLC 
Reset the system from local console 
Oil pump on 

Resting pad/static load 
compensation air supply 
default
 

 

Air supply default 

Alarm lamp lighting 
B&K interlock 1 open 
B&K interlock 2 open after 5s 

Restart the system 

Default displayed on PLC 
Reset the system from local console 
Oil pump on 

Emergency stop 

 

Emergency stop on 

Everything stops 
Air pressure supply to static weight compensation and 


background image

 

 

2016. 11 

 

 
 
 

10 

Space Test Division 

shaker PIC drop down to zero bar 
Re-Start 

 
[Req_5] Support on test

 

Engineering support shall have the following requirements as minimum: 
▣  Req_5.1: Contractor shall supply hydraulic group handling 

▣  Req_5.2: Contractor shall supply supervision of hydraulic group installation   

▣  Req_5.3: Contractor shall supply supervision of piping work& hose installation   

▣  Req_5.4: Contractor shall support operation and check the functionalities of whole vertical shaker 
system including safety logic. 

▣  Req_5.5:  During  this  period,  the  contractor  should  supply  the  engineering  support  to  solve  the 
problem related with QUAD system 
 
3. 

Technical Requirements of wood shims 

 
  [Req_6] Wood shims

 

▣  Req_6.1:  Supplied  wood  shim  shall  have  the  characteristics  that  the  perpendicular  compressive 
strength shall be better than 5 MPa to support the mass. 

▣  Req_6.2: Contractor should supervise lifting activity of the seismic mass. Mass of seismic is about 
300 tons and required lifting height is 1m. 
 
 
4. 

Technical Requirements of technical support 

Contract shall supply assistance for the manufacturing of the magnesium head expander and related 
work. Three times of visit should be performed as minimum. The schedule of visit and detailed contents 
can be changed according to the progress of head expander manufacturing. 

 

  [Req_7] Technical Support

 

▣  Req_7.1:  During  this  first  visit,  Contractor  shall  will  review  together  the  other  participants  the 
preparation  work  (procedures,  preliminary  tests,  chamfering  of  the  plates)  and  inspect  the  very  first 
welds (welding of the central cross on the top plate). A review of the characteristics of the heat furnace 
(for heat treatment) shall also be performed. 

 

▣  Req_7.2: A second visit would be to inspect the guiding boxes before they are welded on the 
top plate. The same persons as for the first visit must be present   
 

▣  Req_7.3: A last visit would be after the heat treatment and the dimensional measurement after 
the heat treatment. KARI will supply the dimensional measurement report (in English) before the 
visit. The main objective of this meeting is to advise on the way to do the machining taking into 
account flatness of the HE 

 
 
 

 


background image

 

 

2016. 11 

 

 
 
 

11 

Space Test Division 

III.  Format of Proposal 

 
The proposal shall consist of 6 section(S). 
 

 

 

S 1      : Bidder's Qualification Document 

 

S 2      : Executive Summary (Overview)   

 

S 3      : Technical Proposal 

 

S 4      : Warranty Proposal 

 S 5      : Bidder's Confirmation Document for Fully Understanding of the RFP 

 

S 6      : Price Proposal 

 
The bidder shall present 6 copies of the proposal. A4 or letter size paper shall be used. The bidder is 
requested to strictly follow the following illustrated format (tabular form)
. This is very important 
to compare and evaluate different bidders’ proposal. Consequently, disregard for this rule may end up 
with  disqualification.  Also,  well-prepared  and  well-organized  proposal  will  be  highly  appreciated  and 
evaluated. The landscape orientation will be acceptable for tables. The suggested contents in each WP 
are minimum requirements and works for reminiscences. Ambiguous expression will act adversely to 
the bidder.   
 
S 1 : Bidder's Qualification Document 
 

(*) Bidder's Qualification : The followings shall be included in WP1. 

The participants shall also have experience in manufacturing and delivery of a 3m vibration 

system 

 
The followings shall be included in this Section. 
 
(a) Bidder's experiences on the prescribed system in this "Request for Proposal" including : 
 

(1) design 

 

(2) manufacturing   

 

(3) installation (specifications, performance, purchaser, supplied year) 

 

(4) training (operation and maintenance) of the facility   

(b) The installation information (including personnel's information in charge of the facility, address, FAX 

number, etc.) from the well known institutes or companies which are using the facilities installed by 
the bidder and/or subcontractor. 

 
(c) Other information 
 

1. Total Employees 

             

 

- Total number of Employees (Engineer / Technician) 

             

 

- Number of Employees for the directly related area 

     

2. Plant Scale 

             

 

- Total area of space 

             

 

- Factory & Building area 

       

3. General brochure 

4. Any documents with which the bidder can show his/her financial and technical abilities (e.g. 

technical awards, bank balance, etc.) 

(d) Bidder’s Qualification Evidence Documents
 
S 2 : Executive Summary (Overview) 

This WP shall include the summary of the all section. The tabular form is recommended. 

 
S 3 : Technical Proposal 
 

This WP (Technical Proposal) shall be written in English. Concise and clear expression is required.   

A long sentence should be broken down into several sentences. Detailed block diagrams, figures and 


background image

 

 

2016. 11 

 

 
 
 

12 

Space Test Division 

photos are recommended for clear illustration. 
 
All the descriptions in this RFP is minimum requirements and the bidders can suggest the better 
one  to  improve  the  overall  performance  and  cost
.  But  in  this  case,  the  proposal  should  clearly 
indicate the improvements on the KARI’s requirements with their detail drawings and explicit calculation 
results. 
 
The contents of proposal will be the measurement of the bidder’s technical capabilities. Bidder’s 
proposal will be reviewed by a number of experts at KARI and other institutes. 
 
The bidder shall prepare tables for the check list to show the bidder’s compliance with the “Request for 
Proposal”. This table shall be located in front of the Technical Proposal part. The articles in the “Work 
description” and “Technical Requirements” of the RFP shall be completely enumerated in the table. The 
table format is as follows: 
Check Lists for “Part I Overview work description” and “Part II Technical Requirements 
 
ANR 

: Article Number in the “Part II & III Technical Requirements” in the RFP. 

Y/N 

: Compliance (Yes or No.) 

CAP 

: Corresponding Article number in the bidder’s Proposal to ANR 

AAM 

: Article number of Added Material in the bidder’s proposal which is not mentioned in the RFP. 

 

Part 

 

Or 

 

Part 

II 

ANR 

 

Y/N 

CAP 

Remark 

AAM 

Remark 

1) 

 

yes 

1) 

ditto 

 

 

2) 

 

yes 

2) 

ditto 

 

 

3) 

 

yes 

3) 

ditto 

 

 

4) 

 

yes 

4) 

The  specifications  look 
old. We updated them. 

 

 

N/A 

 

N/A 

N/A 

N/A 

5) 

We  currently 
developed  a 
new method. 

5) 

 

yes 

6) 

ditto 

 

 

6) 

 

no 

7) 

The  resolution  is  high 
above  the  necessity. 
The  current  technology 
for the system ….. 

 

 

7) 

 

yes 

8) 

ditto 

 

 

8) 

 

no 

9) 

This  specification  is  not 
compatible with 8) in the 
proposal.  We  suggest 
other approach. 

 

 

9) 

 

yes 

10) 

ditto 

 

 

# ditto : The same as stated above or before 
S 4 : Warranty Proposal 
4.1 Baseline warranty (1 years) 
 

- plan for the prompt repair 
- information on A/S team   
 

S 5 : Bidder's Confirmation Document for Fully Understanding of the RFP 
This  document  shall  confirm  that  the  bidder  has  completely  understood  the  whole  RFP,  which  was 
written in English. 
 
S 6 : Price Proposal 
Price proposal in Euro 
 

 
 
 
 


background image

 

 

2016. 11 

 

 
 
 

13 

Space Test Division 

 
 

IV.  INSTRUCTION TO BIDDERS 

 
1.1.  Qualification of Bidders 

(1)  Bidder shall also have experience in manufacturing and delivery of a 3m vibration system. 

 

1.2.  Submittal of Proposal 
The  proposal  shall  be hand-carried  or  sent  via appropriate express  courier  to  KARI  personnel  or his  designee 
within the Bid Closing Date and Time. A deputy shall submit the power of attorney and a copy of his identification. 
 

1.2.1. 

Number of copies 

The Proposal should be made in six (6) copies in English. In case of any discrepancies between the Proposals, 
the original hardcopy shall prevail. 

 

1.2.2. 

Bid closing date 

The closing for the Proposal is specified in Bid summary. If any part of the Proposal as required under this RFP 
is submitted after the stipulated closing time, the entire Proposal will not be accepted. 

 

1.2.3. 

Point of contact 

Besides the Proposal submission, the point of contact for all communications for technical matters shall be 

Dr. Jong-Min Lim 
Space Test Division 
Korea Aerospace Research Institute (KARI) 
169-84 Gwahak-ro, Yuseong-Gu 
Daejeon, 34133, Korea 
Tel : +82-42-860-2562 
Fax: +82-42-860-2234 
E-mail : acoust@kari.re.kr 

The communication between KARI and prospective Bidders for contractual matters (Terms and Conditions) shall 
be controlled through the following designee: 

 
Mr. Jung-Nam CHO 
Senior Administrator of Procurement Team 
Korea Aerospace Research Institute (KARI) 
169-84 Gwahak-ro, Yuseong-Gu 
Daejeon, 34133, Korea 
Tel : +82-42-860-2613 
Fax: +82-42-860-2666 
E-mail : jncho@kari.re.kr 

 
Bidder’s information on the points of contact shall include the name, title/position, telephone number, E-mail 
address, and facsimile number. 

 

1.2.4. 

Information on the evaluation 

The  evaluation  of  the  Proposals  will  be  performed  by  the  evaluation  committee  in  KARI.  The  following 
evaluation guidelines are for information only, and the evaluation committee reserves the right to modify the 
guidelines without any prior notification to Bidders. 
Principles of evaluation are as follows; 

 
(1) Subject to an initial review of the Proposal, KARI may send to Bidders a set of questions for clarification 

and  supplementation  to  the  Proposal,  and  the  evaluation  will  be  made  based  on  the  Proposal  and  the 
answers received from Bidders. 

(2) First, the evaluation will be performed for the technical part of the proposal and the Qualified Bidders 

will be selected as a result of technical evaluation. Second, the lowest price proposal among the Qualified 
Bidders will be selected as Successful Bidder.   

(3) The evaluation will be based on the baseline work scope. Any optional propositions will be  evaluated 

separately. 


background image

 

 

2016. 11 

 

 
 
 

14 

Space Test Division 

(4) The result of the evaluation is at the proposal evaluation committee’s discretion based on the evaluation 

process and any Bidders shall not raise any objection regarding proposal evaluation committee’s decision 
thereupon.   

 

1.3.  Bidding Schedule 
The following schedule is a tentative milestone for the eventual Contract and may be changed at KARI’s sole 
discretion: 
 
[1] RFP Release: T0 
[2] Proposal Closing Date: T1 = T0 + 10 days   
[3] Review of Proposal: T1 + 7 days 
[4] Question and Answer: T1 + 7 days 
 
1.4.  Validity of Proposal 
Proposal shall be valid for three (3) months from the Bid closing date and upon KARI’s request, shall be 
extended for another three (3) months. 
 
 
1.5.  Bid Bond 

1.5.1. 

Amount of Bid Bond 

Bidder shall establish a bid bond in favor of KARI not later than the Bid Closing Date and submit the certificate 
to KARI along with this Proposal. The total amount of the bid bond shall be at least five (5) percent of the total 
bidding price. The bid bond shall remain valid for three (3) months, and if the Bid validity is extended as per 
Section 1.4, the bid bond shall also be extended accordingly. 

 
1.5.2. 

Bid Bond Establishment Method 

The bid bond in Section 1.5.1 hereinabove shall be issued by  first class international bank in the form of an 
irrevocable  letter  of  credit  and  advised  through  “Woori  Bank”  (Daejeon  Branch  at  29  Munye-ro,  Seo-gu, 
Daejeon, 35241 Korea, Tel: +82-42-488-9704, Ext. 312 / Fax:+82-505-003-0759). The bond shall be available 
by KARI's draft at sight drawn on the Bank, accompanied by the statement of KARI stating that Bidder has 
refused to enter into a Contract with the terms and conditions in the RFP as amended, if any, that Bidder has 
hindered the fair bidding by fraud or misrepresentation, or that Bidder has withdrawn its Proposal after the Bid 
Closing Date. The bid bond shall contain the substantial part of the terms and conditions of the bond, date of 
establishment, account, amount, payment terms, and date of expiry, etc. 

 
1.5.3. 

Bid Bond Return 

The bid bonds except for those of the Successful Bidder and the other Qualified Bidders will be released upon 
the instructions of KARI to the Non-Qualified Bidders, without interest, promptly after KARI’s selection of the 
Successful  Bidder. The  bid  bond  of  the  Successful  Bidder  and the  other  Qualified  Bidders  shall  be  likewise 
released to the corresponding Bidder with whom KARI decides not to enter into a Contract. 

 
1.5.4. 

Contractor’s Bid Bond 

When the Contract is executed, the bid bond shall be released upon the instructions of KARI to the Contractor, 
without interest, promptly after the Contractor shall establish a performance bond or amend a bid bond in favor 
of KARI. 

 

1.6.  Questions and Modifications 
Any questions as to the intent and clarity of the RFP may be asked to KARI’s point of contact as specified in 
Section 1.2.3 by E-mail, fax or letter no later than three (3) days before the Bid Closing Date. 
 
After the Bid Closing Date, Bidders shall not amend, modify, or supplement the Proposal, or submit any other 
documents to KARI, except with KARI's written request. 
 
KARI may ask, in writing, questions as to the intent and clarity of the Proposal to Bidders or request the Bidders 
to provide supplementary information or data. 
 
1.7.  No Contractual Obligation 
This RFP shall not be interpreted as an offer for a Contract or any type of guarantee by KARI. It is KARI's sole 


background image

 

 

2016. 11 

 

 
 
 

15 

Space Test Division 

discretion whether or not to allow the Contract award to any Bidder. KARI owes no responsibility or obligation 
to select the Contractor among Bidders. 
 
This  solicitation  for  the  Proposal  shall  neither  be  construed  to  create  an  obligation  on  KARI  to  enter  into  a 
contractual instrument, nor  shall  it  serve  as  a  basis  for  any  claim  for  reimbursement  of  costs  for  the  effort to 
prepare,  submit,  amend,  revise  or  supplement  the  Proposal,  and  other  related  documents  expended  by  Bidder 
regardless of whether or not Bidder is successful in receiving an award as a result of the solicitation. 
 
1.8.  Acceptance/Rejection of Bids 
KARI reserves the right to accept or reject any Bidding, and to amend the Bidding process and reject all Biddings 
at any time prior to the award of the Contract without thereby incurring any liability to the affected Bidder(s), and 
KARI is not under any obligation to inform the affected Bidder(s) of the ground for its action. 
 
1.9.  Selection of Successful Bidder 
First, the evaluation will be performed for the technical part of the proposal, and the Qualified Bidders will be 
selected as a result of technical evaluation. Second, the lowest price proposal among the Qualified Bidders will 
be selected as Successful Bidder.   
 
1.10.   Contract 
The Terms and Conditions as presented in Chapter V. of this RFP is the baseline requirement for the Contract 
negotiation, and will be the basis of the Contract. 
 
1.11.    Language and Measurement Unit 
The  Proposal  and  any  documents  submitted  to  KARI  under  this  RFP  and  communication  and  the  Contract 
language shall be in English or Korean. 
 
"Système Internationale" (SI, hereafter) units shall be used for measurements and quantities in the Proposal and 
all the accompanying documents. 
 
1.12.    Pricing Requirements 
Any price or rate proposed by Bidder shall be firm and fixed, not subject to change for a price escalation for the 
entire period of the Contract. 
 
Any kinds of taxes and duties arising in connection with Bidder’s work under this RFP and under the eventual 
Contract shall be Bidder’s responsibility, except for the customs duties levied in Korea. 
The price shall be inclusive of any cost or charge incurred due to delivery of any equipment, hardware, software 
or documentation to KARI or its designated point of delivery. 

 

1.13.  Certificate and Government Approvals 
Bidders  shall  receive  the  government  approval  and  certificates  (e.g.  E/L)  in  relevant  countries,  necessary  for 
Bidder's work for this Proposal. Bidder's ability and plan to get such approval and certificates shall be submitted 
to KARI, together with any appropriate assurance letters from the relevant governments, in the proposal. 
 

1.14.  Confidentiality 
There shall be no news releases, public announcements, denials or confirmation in connection with this RFP or 
Contract award without the prior written approval of KARI. 
 
All documentation submitted in response to this RFP shall be marked "COMMERCIALS-IN-CONFIDENCE" on 
the first page of each document. All elements of the RFP shall be kept confidential, and shall not be intentionally 
disclosed by Bidder to the third parties. 
 
1.15.    Withdrawal of Proposal 
Bidder may withdraw its Proposal at any time before the Bid Closing Date. Withdrawal shall be made in writing, 
and shall be received by KARI before the Bid Closing Date. 
 
1.16.    Property of Proposal 
All  documents  submitted  in response  to  this  RFP  shall  become  the property  of  KARI  and  will  be  retained  by 


background image

 

 

2016. 11 

 

 
 
 

16 

Space Test Division 

KARI. 
 
1.17.    Expenses 
Expenses incurred by Bidders in connection with the preparation, submittal, and any subsequent clarification or 
negotiation activities are for their own account and will not be reimbursed by KARI. 
 
1.18.    Governing Law 
This RFP and the Contract shall be construed in accordance with and governed by the laws of the Republic of 
Korea. 
 
1.19.    Arbitration 
Any disputes in relation to, and under the RFP and the Contract shall be resolved through arbitration in Seoul, 
Korea, under the Rules of the Korean Commercial Arbitration Board. 
 

 


background image

 

 

2016. 11 

 

 
 
 

17 

Space Test Division 

V.  GENERAL TERMS AND CONDITION 

 
 
Article 1. Definition 
 
In this Contract, the following words and phrases shall have the meanings as indicated below, unless the context 
wherein they are used clearly indicates another meaning: 
 
1.1 

Associates  mean all  individual  or legal  entities  organized under  public  or  private  law,  who  shall act, 
directly or indirectly, on behalf of KARI or Contractor, or at the direction of either Party to this Contract 
to  fulfill  the  obligations  undertaken  by  such  Party  in  this  Contract,  including,  without  limitation,  the 
employees of each Party, their suppliers and Subcontractors. 

 
1.2 

Contract means this Contract for the Hydraulic supply system for pad bearing and the technical support 
for manufacturing of the magnesium head expander, including Appendices as attached hereto, and all 
amendments  that  may  be  subsequently  agreed  to  by  the  Parties  in  accordance  with  the  terms  and 
conditions of this Contract. 

 
1.3 

Contractor means TBD. 

 
1.4 

Contract Price means the amount of Contract. If there is any change in Contract Price due to any reason, 
then the Contract Price means current total amount of Contract.   

 
1.5 

Deliverable  Data  means  any  technical  data  as  enlisted  in  Appendix  B-1  “Statement  of  Work”  that 
Contractor shall deliver to KARI and any related data thereof under this Contract. 

 
1.6 

Deliverable  (Delivery)  Item(s)  means  hydraulic  supply  system  and  deliverable  data  as  enlisted  in 
Appendix B-1 “Statement of Work” that Contractor shall deliver to KARI. 

 
1.7 

EDC means the Effective Date of this Contract. 

 
1.8 

Event(s) of Force Majeure means any act of God, war, whether or not declared, act or failure to act of 
any government in its sovereign capacity, fire, earthquake, flood, epidemic, quarantine, nuclear incident, 
or any other act beyond the reasonable control and without the fault of either Party or its Subcontractors. 

 
1.9 

Factory Acceptance means KARI’s pre-shipment inspection or audit including the testing activities for 
Deliverable Item at Subcontractor’s facility. 

 
1.10 

Hydraulic Group means the supplying and collecting part for oil of pad bearing. It includes supply 
pump, tank, scavenge pump and related valve as minimum. 

 
1.11 

Hydraulic Supply System means equipment to supply and monitor the hydraulic oil to pad bearings of 
vertical vibration system. It includes hydraulic group and oil flow monitoring unit as minimum. 

 
1.12 

KARI means Korea Aerospace Research Institute. 

 
1.13 

Magnesium Head Expander means structure that supplies interfaces to pad-bearing. It is made of many 
magnesium plates by welding method, heat treatment and machining. 

1.14 

Oil  Flow  Monitoring  Unit  means  the  system  that  consists  in  oil  flow  meters  to  be  installed  on  the 
pressure manifolds of the hydraulic system. It consists of 4 flow meters and manifolds. 

 
1.15 

Party or Parties means KARI or Contractor, or both, according to the context. 

 
1.16 

QUAD vibration system means vertical vibration system composed of 4 shakers. 

 
1.17 

Subcontract means any subcontract, including purchase orders and all similar forms of agreements at any 
tier under this Contract. 


background image

 

 

2016. 11 

 

 
 
 

18 

Space Test Division 

 

1.18 

Subcontractor means a contractor under any Subcontract including suppliers and vendor. 

 
1.19 

Technical support means activity to review and give solution for the manufacturing of the magnesium 
head and related with hydraulic supply system   

 
1.20 

Third Party(ies) means any individual or legal entity other than the Associates and the Parties. 

 
1.21      Wood shims means part for reaction mass lifting of 300 tons   
 
1.22 

Work(s) means whole or any part of the work, but not limited to review meeting, delivery, installation, 
test, training, warranty and maintenance, to be executed by a Contractor in accordance with this Contract. 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 


background image

 

 

2016. 11 

 

 
 
 

19 

Space Test Division 

Article 2. Objective 
 
2.1 

The objective of this Contract is to procure the hydraulic supply system, wood shims and technical support 
for QUAD vibration system through the effort of the Contractor. To accomplish this objective, Contractor 
shall  perform  all  the  Works  under  this  Contract  required  for  design,  manufacture,  test,  installation, 
warranty and technical support as well as the delivery of Deliverable Item to meet the requirements and 
specification of this Contract. 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 


background image

 

 

2016. 11 

 

 
 
 

20 

Space Test Division 

Article 3. Contract Documents 
 
3.1 

This Contract shall comprise the following documents, as amended from time to time by written agreement 
by and between both Parties: 

 
 

    [A] Terms and Conditions 

 

    [B] Appendices 

B-1. Statement of Work 
B-2. Contractor’s proposal 

 
3.2 

In the event of any inconsistency or discrepancy between or among the Contract documents as listed in 
Article 3.1 above, the Contract documents shall be applied in the decreasing order of precedence. 

 
3.3 

In the event of any dispute or difference between the Parties in the interpretation of this Contract as a result 
of  the  application  of  the  Appendices  as  specified  in  Article  3.1,  Contractor's  Proposal  dated               
submitted  to  KARI  in  anticipation  of  this  Contract  in  response  to  KARI's  Request  for  Proposal  dated                             
shall be used as a reference document to identify and clarify the intention and understanding of the Parties 
as contemplated in this Contract, and both Parties shall in good faith seek an agreement or a compromise 
acceptable to both Parties without modification or amendment to this Contract. 

 
 
 

 


background image

 

 

2016. 11 

 

 
 
 

21 

Space Test Division 

Article 4. Responsibilities of the Parties 
 
4.1 

Responsibilities of KARI 

 
4.1.1 

KARI shall make a payment to Contractor in accordance with Article 6 “Terms of Payment”. 

 
4.1.2 

In  accordance  with  Appendix  B-1  “Statement  of  Work”,  KARI  shall  provide  any  reasonable  support 
including facilities, equipment and information in order for Contractor to fulfill the technical support at 
KARI site. 

 
4.1.3 

KARI shall provide reasonable cooperation and support in order for Contractor to obtain any government 
approval.   

 
4.1.4 

KARI shall have the right to monitor and access the work in progress at Contractor’s           
and its Subcontractor’s facilities. 

 
 
4.2 

Responsibilities of Contractor 

 
4.2.1 

Contractor shall have all responsibilities for the delivery of hydraulic supply system for pad bearing to 
KARI in a timely manner as required and defined under this Contract without any charges to KARI.   

 
4.2.2 

Contractor  shall  provide  all  Work  including  the  installation,  training,  warranty  and  technical  support 
required and stated under this Contract to KARI. 

 
4.2.3 

Contractor  shall  provide  as  sufficient  as  engineering  manpower  for  the  timely 
completion of the tasks as set forth in Appendix B-1. “Statement of Work”. If the tasks 
are not completed with manpower foreseen due to Contractor’s fault, Contractor shall 
provide  any  additional  manpower  to  accomplish  its  scope  of  work  without  any 
additional cost to KARI. 

 
4.2.4 

Contractor shall provide any technical information or assistance as may be needed for 
KARI to understand Technical Data or output of Contractor’s work hereunder, without 
any additional charge to KARI. 

 
4.3 

Types of Technical Support Services 

 
4.3.1 

Contractor’s Services under this Contract shall be performed in the following types: 

 

(a)  Report for support for Mg. welding & heat treatment 
(b) Report for inspection of guiding box in H/E 
(c)  Report for support on the machining process 

 
 
 
 
 
 
 
 
 
 


background image

 

 

2016. 11 

 

 
 
 

22 

Space Test Division 

Article 5. Contract Price 
 
5.1 

For the full, satisfactory and timely performance of the Work by the Contractor in accordance with the 
provisions  of  the  Contract,  KARI  hereby  agrees  to  pay  to  the  Contractor  _______________  U.S 
dollars/EUROs (US$/€ ____________), in accordance with the terms of payment as stipulated in Article 
6 “Terms of Payment”. 

 
5.2 

The Contract Price as specified in Article 5.1 above shall be firm and fixed price that is not subject to any 
escalation or to any adjustment or revision by reason of the increase of actual costs incurred by Contractor 
in the performance of the Work under this Contract, unless otherwise agreed to by  both Parties under 
Article 23 “Changes”. 

 
5.3 

The Contract Price as specified in Article 5.1 above shall be comprised of the following items. 

 

Description (set) 

Price (US$/€) 

Hardware supply 

Hydraulic supply system 

 

Wood shims 

Shim 1 (4ea) 520 x 500 (T) 280 

Shim 2 (4ea) 520 x 500 (T) 253 

Shim 3 (32ea) 520 x 500 (T) 230 

 

Technical Support 
  Services 

1.First visit: Report for support for Mg. welding   

& heat treatment 

2.  Second  visit:  Report  for  inspection  of  guiding  box  in 

H/E 

3. Third visit: Report for support on the machining process 

 

Total 

 

 
5.4 

All banking charges incurred in Korea shall be borne by KARI and those charges incurred outside Korea 
shall be borne by Contractor. 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 


background image

 

 

2016. 11 

 

 
 
 

23 

Space Test Division 

Article 6. Terms of Payment 
 
6.1        Payment Schedule 
 
6.1.1  Payment  shall  be  executed  after  the  establishment  of  performance  bond  in  accordance  with  Article  7 

“Performance Bond”. 

 
6.1.2  KARI  shall  pay  to  Contractor  the  Contract  Price  as  stipulated  in  Article  5.1  in  accordance  with  the 

following schedule: 

 

(c)  Hardware supply 

 

No. 

Payment milestone 

(in Month) 

Payment due date 

Payment 

(US$/€) 

Percentage of 

Contract Price (%) 

EDC   

EDC+ 1M 

 

30 

FAR (EDC+ 2M) 

EDC+ 3M 

 

60 

Inspection of Hydraulic 

Supply System (EDC+ 

4M) 

EDC+ 5M 

 

10 

Total 

 

100 % 

*    “EDC” means the Effective Date of this Contract in accordance with Article 22 “Effective Date of 

Contract”. 

*    “FAR” means the Factory Acceptance Review at Contractor site. 
*    “Inspection” means the incoming inspection of the Deliverable Item in accordance with Article 13. 

 

(d) Technical Support Services 

 

No. 

Payment milestone 

(in Month) 

Payment due date 

Payment   

(US$/€) 

Percentage of 

Contract Price (%) 

EDC   

EDC+ 1M 

 

40 

Delivery of report 

(EDC+ 3M) 

EDC+ 4M 

 

60 

 

 

 

 

 

Total 

 

100 % 

*    “EDC” means the Effective Date of this Contract in accordance with Article 22 “Effective Date of 

Contract”. 

 
6.2 

Billing Procedure 

 
6.2.1 

All  invoices  Contractor  submits  for  payment  shall  be  in  duplicate  signed  by  an  authorized  company 
official and received by KARI at least thirty (30) days before the payment due dates as specified in Article 
6.1.   

 
6.2.2 

All  payments  shall  be  made  in  U.S  dollars/EUROs  by  telegraphic  transfer  to  the  bank  account  as 
designated by Contractor in its invoices, by the payment due dates as stipulated in Article 6.1, but or not 
later than thirty (30) days after KARI's receipt of Contractor's invoices whichever comes later. 

6.3 

Suspension of Payment 

 
6.3.1 

Notwithstanding any provisions of this Contract, if any payment milestone as set forth in Article 6.1.2 
has not been accomplished for any reasons attributable to Contractor, KARI may, with an advance notice, 
suspend all payments due until KARI and Contractor agree that the delayed payment milestone has been 
accomplished. 

 
6.3.2 

In the event of KARI's suspension of payment under Article 6.3, Contractor shall nevertheless continue 
to  perform  its  obligations  under  this  Contract  regardless  of  whether  KARI  is  entitled  to  suspend  the 


background image

 

 

2016. 11 

 

 
 
 

24 

Space Test Division 

payment.   

 
6.4 

Deduction of Payment 

 
6.4.1 

All losses, costs, charges, damages and expenses which KARI incurs or sustains by reason of any act, 
default or omission of the Contractor in the performance of the Contract and any other amounts which 
KARI  is  entitled  to  receive  from  the  Contractor  may  be  deducted  from  any  payment  that  may  be  or 
become due to the Contractor from KARI or may request for those amount to Contractor. 

 
6.4.2 

A  prior  written notice  given  by  KARI  accompanied  with  documents  stating  the  amount  due  to  KARI 
referred to in Article 6.4.1 and the reason of deduction shall be prima facie evidence of the matters stated 
herein. 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 


background image

 

 

2016. 11 

 

 
 
 

25 

Space Test Division 

Article 7. Performance Bond 
 
7.1 

Contractor shall establish a performance bond or deposit cash within three (3) weeks after EDC in favor 
of  KARI  in  the  value  of  ten  percent  (10  %)  of  the  Contract  Price,  in  the  form  of  an  irrevocable  and 
unconditional standby letter of credit available by KARI’s draft at sight. 

 
7.2 

The entire amount covered by the performance bond shall be payable to KARI on demand together with 
KARI’s written statement to the effect: 

(a)  that  there  was  a  default  of  the  Contractor  in  the  performance  of  the  Contract 

(including Subcontractor’s default under the Subcontract), or 

(b) that any amount KARI is entitled to receive from Contractor has not been paid by 

Contractor to KARI through any other means, or 

(c)  that the performance of the Delivery Item accepted by KARI pursuant to the Article 

13 “Inspection and Site Acceptance” falls below the warranted level specified by 
the Contract and as far as no remedy is brought by Contractor, or 

(d) that this Contract was terminated by Contractor’s breach as specified in Article 19.2. 
 
Whenever any amount has been withdrawn by KARI due to such cases of (a), (b) or (c) as above, 
performance bond shall be replenished. 

 
7.3 

The letter of credit shall be issued by first class international bank acceptable to KARI. The letter of credit 
shall be drawn in favor of KARI and advised through the Woori Bank (Daejeon Branch at 29 Munye-ro, 
Seo-gu, Daejeon, 35241 Korea, Tel: +82-42-488-9704, (Ext. 312)/ Fax: +82-505-003-0759) and the letter 
of credit or cash deposit shall remain valid until the end of warranty expiration. The letter of credit shall 
not be amended, modified or canceled without KARI's prior written consent. 

 
7.4 

It is hereby agreed between the Parties that payment from the Performance Bond under this Article 7 shall 
not affect any other KARI's rights, privileges, interests or remedies under this Contract or the applicable 
law. 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 


background image

 

 

2016. 11 

 

 
 
 

26 

Space Test Division 

Article 8. Deliveries 
 
8.1 

General 

 
8.1.1 

Contractor shall deliver Deliverable Item in accordance with the defined schedule and method as set forth 
in Appendix B-1 “Statement of Work”. 

 
8.1.2    Contractor  shall  bear  any  charges  or  costs  of  whatsoever  nature  that  are  incurred  in  relation  to  such 

delivery or provision until such delivery or provision is duly made under this Contract without any non-
conformity and accepted in accordance with Article13 “Inspection and Site Acceptance” hereof, and shall 
keep KARI free from any such charges and costs. 

 
8.1.3  Contractor agrees that delivery or provision of time and place under this Contract, whether specifically 

provided for or not, or in subsequent amendments thereto, are of the essence of this Contract. 

 
8.1.4  Contractor  shall  be  responsible  for  all  applicable  taxes  imposed  outside  Korea  including  any  customs 

duties  and  charges  of  any  nature  levied  on  Deliverable  Item,  spare  parts,  spare  materials,  tools, 
consumables and ancillary equipment as well as any charges associated with the transportation. 

 
8.2 

Delivery to KARI 

 
8.2.1  Contractor  shall  deliver  Deliverable  Item  under  the  rule  of  FCA  France  airport  (Free  Carrier  with  the 

Incoterms 2010) for Hydraulic supply system and the rule of FOB France seaport (Free on Board with the 
Incoterms 2010) for Wood shims in accordance with the delivery schedule of this Contract.   

 
8.2.2  Unless  otherwise  mutually  agreed,  Contractor  shall  make  the  deliverable items ready  for  shipment  and 

shall hand over to the KARI's Carrier or Forwarding Agent (Cargo King B.V :Tel: +31 20 405 3230, Attn: 
Mr. Willis Shin, willis.shin@cargoking.eu) in accordance with the delivery schedule of this Contract. 

 
8.2.3  To obtain import certification, Contractor shall notify KARI by e-mail (address is “acoust@kari.re.kr” for 

Mr. Jong-Min IM and “jncho@kari.re.kr” for Mr. Jung-Nam CHO) fourteen (14) calendar days prior to 
each shipment with one set of proforma invoice and packing list specifying the number of boxes, name of 
Items, unit price, and size and volume of each container or box to be shipped. As soon as each shipment 
as  provided  for  in  this  Article  is  made,  Contractor  shall  send  one  (1)  copy  of  the  following  shipping 
documents to KARI by e-mail; 
(a) Clean on board vessel bill of lading/or airway bill of lading, 
(b) Commercial invoice, 
(c) Packing list, 
(d) Weight and measurement list,   
(e) Manufacturer's Inspection Report,   
(f) Certificate of Origin issued by Contractor, and 
(g) Export License (if possible). 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

 


background image

 

 

2016. 11 

 

 
 
 

27 

Space Test Division 

Article 9. Delay 
 
9.1 

Excusable Delay 

 
9.1.1 

Neither Party shall be responsible to the other Party for any delay in performing its obligations under this 
Contract due to any Events of Force Majeure. 

 
9.1.2 

The Party whose performance of obligations hereunder has been affected by any Events of Force Majeure 
shall notify the other Party within ten (10) days thereafter by sending a detailed statement and sufficient 
evidence with respect thereto, and promptly of any subsequent change in the circumstances, if any. The 
affected Party shall exercise its best efforts under the circumstances to remove or remedy the Events of 
Force Majeure and the effects thereof and resume full performance hereof as soon as possible. 

 
9.1.3 

Notwithstanding Article 9.1.1 hereof, any such delay that has not been notified to the other Party or any 
delay of performance of the affected Party falling due after delay, failure or incompleteness in exercising 
the pertinent best efforts to remove or remedy the pertinent Events of Force Majeure or the effects thereof 
pursuant to Article 9.1.2 hereof shall not be excused for any reason whatsoever.   

 
9.1.4 

The Party who has received or is entitled to duly receive the notice of Events of Force Majeure under 
Article 9.1.2 hereof may suspend performance of its obligations which shall be due subsequent to such 
Events of Force Majeure, until the other Party has effected such delayed performance to the full extent 
after and in view of such Events of Force Majeure. 

 
9.2 

Non-Excusable Delay 

 
9.2.1 

In the event that, unless otherwise excused by virtue of this Contract, any reason attributable to KARI or 
the  governing  or  applicable  law,  Contactor  delays  the  provision  or  delivery  of  Deliverable  Items  as 
stipulated under this Contract, Contractor shall pay for damages as defined in the Article 9.2.2 to KARI 
as a result of such delay. 

 
9.2.2 

Contractor  acknowledges  and  agrees  that  the  timely  provision  or  delivery  of  the  Deliverable  Item  as 
stipulated under this Contract or its performance of other obligations under this Contract is essential to 
KARI, and that such delay as provided for in Article 9.2.1 hereof may cause substantial financial loss or 
damage to KARI’s rights, interests, privileges and benefits, which may not be assessable or recoverable. 
Both  Parties  therefore  specifically  agree  that  in  the  event  of  such  loss  or  damage  caused  by  delay 
attributable to Contractor, its Subcontractor or any of its agents, Contractor shall pay KARI as liquidated 
damages zero point one five percent (0.15%) of Contract Price per day of such delay. In no case, however, 
shall the aggregated liquidated damages exceed ten percent (10%) of Contract Price. It is also agreed by 
both Parties that KARI shall be entitled to terminate this Contract for Contractor’s breach, only if the 
aggregated liquidated damages under this Article, excluding those days  of delay excused by KARI in 
writing, exceeds ten percent (10%) of the Contract Price. 

 
9.2.3 

This Article  shall not affect  other remedies, rights, privileges,  interests,  benefits  of  KARI  under  this 
Contract or the governing or applicable law.   

 
9.2.4 

For the purpose of this Article, any action or omission of Contractor’s Subcontractor, agent, or servant, 
de facto or de jure, shall be deemed to be Contractor’s own. 

 
 
 
 
 
 
 
 
 
 


background image

 

 

2016. 11 

 

 
 
 

28 

Space Test Division 

Article 10. Taxes and Duties 
 
10.1 

In the event taxes are charged in Korea, KARI shall be fully responsible for payment of such taxes. 
Contractor shall be fully responsible for the payment of all applicable taxes imposed outside Korea 
including any customs duties and charges.   

 
10.2 

If Korean corporation tax is required to be withheld from amounts paid or payable to Contractor under 
this Contract (herein referred to as ‘Applicable Tax’), KARI shall withhold the Applicable Tax and pay 
on behalf of Contractor the relevant Korean taxing authority in accordance with applicable Korean law 
and international tax treaty between Korea and Germany. 

 
10.3 

In case KARI pay the Applicable Tax on behalf of Contractor, KARI shall forward proof of the withheld 
Applicable Tax to the Contractor within ninety (90) days of payment. 

 
10.4 

Neither Party shall be responsible for paying the customs duties, and related taxes, fees, or charges for 
the personnel and the personal belongings of the other Party. 

 
10.5 

The Contractor shall further comply with instructions KARI may issue from time to time in order to 
facilitate any exemptions or reductions from customs duties and other taxes that might be levied on 
KARI and shall impose the same obligations on its Subcontractors. 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 


background image

 

 

2016. 11 

 

 
 
 

29 

Space Test Division 

Article 11. Intellectual Property 
 
11.1 

KARI shall own and have a right to use, without any obligation, Deliverable Items provided by Contractor 
in its performing this Contract. Contractor shall take all necessary precautions so that all the Deliverable 
Items supplied hereunder shall be free from infringement of any patent, design patent, trademark, utility 
model or any other industrial property right, copyright, license or any other right thereunder of any Third 
Party.   

 
11.2      In the event that any Party other than Contractor claims or threatens to claim infringement by KARI with 

respect to such use of the Deliverable Items, Contractor shall defend, hold harmless, and indemnify KARI 
from such infringement claims. 

 
11.3      This Article will survive the completion of the Contract, any termination, cancellation or expiration of the 

Contract in any manner whatsoever. 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 


background image

 

 

2016. 11 

 

 
 
 

30 

Space Test Division 

Article 12. Factory Acceptance 
 
12.1   

The Factory Acceptance of Hydraulic Supply System shall occur only after: 

 

(a)    all specified tests to be performed by the Contractor under the Contract for the Hydraulic Supply 

System have been completed in accordance with the Contract; and 

(b)    the Contractor has demonstrated to KARI that the Hydraulic Supply System meet the specifications 

and requirements in this Contract; and 

(c)    all Works and conditions under the Contract to be fulfilled by the Contractor prior to the shipment 

of Hydraulic Supply System have been met, 

 

in which case KARI shall accept, in writing, the Hydraulic Supply System subject to the provisions set 
forth below. 

 
12.2 

Subject to the conditions as set forth in Article 12.1 above, a Factory Acceptance of  Hydraulic Supply 
System shall be occurred in accordance with Appendix B-1 “Statement of Work”. After the FAR, KARI’s 
authorized representative shall notify the result of FAR in writing. If KARI determines that Hydraulic 
Supply System is unacceptable, it shall notify the Contractor, in writing, the reasons therefore. 

 
12.3 

If Hydraulic Supply System is determined to be unacceptable, Contractor shall, at its expense, promptly 
repair or replace Hydraulic Supply System so that it shall comply with the Contract specifications and 
requirements, and Contractor shall hold the additional FAR of such repaired or replaced Hydraulic Supply 
System for KARI’s confirmation. The Contractor shall present to KARI the root cause and the result of 
such repair or replacement on the additional FAR. Such repaired or replaced Hydraulic Supply System 
shall be accepted in accordance with the requirements of Article 12.1. 

 
12.4 

For the FAR, KARI, at all times during the performance of this Contract, shall have the right to do the 
following activities at the Contractor’s facilities or other relevant facilities under this Contract; 

 

(a) Access the Items, testing activities and data, related to, used for, prepared or generated in connection 

with this Contract, and 

(b) Witness all qualification and acceptance testing of the Deliverable Items to be delivered or provided 

under this Contract including all tests used for demonstrating qualification. 

 
12.5      Contractor shall make such data and documentation, equipment and facilities available to KARI upon 

KARI’s request and KARI’s selection for such purposes. Contractor shall deliver copies of design and 
test data and other technical data, excluding financial data, required to evaluate technical problems or 
non-performance that may occur during the performance of this Contract. Such documentation and data 
shall also be available for KARI to make copies thereof.   

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 


background image

 

 

2016. 11 

 

 
 
 

31 

Space Test Division 

Article 13. Inspection and Site Acceptance   
 
13.1 

Notwithstanding the successful FAR, KARI shall carry out incoming inspection of the Deliverable Item 
after delivery within one (1) week after delivery. In the event that KARI discovers that any Deliverable 
Item provided or delivered pursuant to Article 8 “Deliveries” are defective or non-conformity during the 
incoming inspection, KARI shall promptly notify Contractor thereof and provided that such defect or non-
conformity is not attributable to KARI, Contractor shall promptly remedy such defect or non-conformity 
and retest. In addition, if remedying such defect or non-conformity would substantially delay as compared 
to the period required to complete such substitution, Contractor shall promptly provide substitute Items. 
Upon the remedy of such defect or non-conformity that the requirements of this Contract are satisfied in 
all respects or upon the provision of substitute Items, Contractor shall notify KARI of the details of the 
remedy undertaken by Contractor.   

 
13.2 

If Hydraulic Supply System is determined to be unacceptable, both Parties shall jointly investigate the root 
cause and if the root cause is attributable to the Deliverable Item, then it shall be considered as non-delivery 
and Contractor shall, at its expense, promptly repair or replace Hydraulic Supply System so that it shall 
comply  with  the  Contract  specifications  and  requirements.  Such  repaired  or  replaced  Item  shall  be 
accepted in accordance with the requirements of Article 13.1. 

 
13.3 

The Parties agree that the acceptance of the Deliverable Item under this Article shall not be interpreted or 
construed to mean that such Item is free of all defects and conform in all respects with the requirements 
of  this  Contract, and  Contractor  shall not  be  entitled to any  additional  costs  incurred  or to recover any 
damages suffered due to defects in the Item or KARI’s rejection of the Item.   

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 


background image

 

 

2016. 11 

 

 
 
 

32 

Space Test Division 

Article 14. Monitoring and Access 
 
14.1 

KARI, at all times during the performance of this Contract, shall have the right to do the following 
activities at the Contractor’s facilities, Subcontractor’s facilities, supplier’s facilities, or other relevant 
facilities under this Contract; 

 

(a) Monitor the Contract performance of Contractor, and 
(b) Access the Items in progress, and any design, manufacturing, and testing activities and data, 

including development and engineering model testing, related to, used for, prepared or generated 
in connection with this Contract, and 

(c) Witness all qualification, protoflight, and acceptance testing of all Items to be delivered or 

provided under this Contract including all tests used for the purpose of demonstrating 
qualification. 

 
14.2     Contractor shall make such data and documentation, equipment and facilities available to KARI upon 

KARI’s request and KARI’s selection for such purposes. Contractor shall deliver copies of design and 
test data and other Technical Data, excluding financial data, required to evaluate technical problems or 
non-performance that may occur during the performance of this Contract. Such documentation and data 
shall also be available for KARI to make copies thereof. 

 
14.3 

Contractor shall obtain from any of its Associates access by KARI, upon reasonable advance notice to 
Contractor, to any pertinent facilities, Work in progress and Technical Data of any of Contractor’s 
Associates to inspect Work in progress under this Contract. Contractor shall dispatch its representative or 
a technical manager authorized to act on behalf of its representative to accompany KARI’s access 
hereunder. 

 
14.4 

KARI shall have access to all Technical Data in the Contractor’s control that are required for the 
development of the hydraulic supply system and technical support under this Contract. 

 
14.5 

If, during the performance of this Contract, the KARI representative or any person designated by KARI 
reasonably determines that any of the provisions or delivery of any Items or Contractor’s performance of 
its other obligations under this Contract does not conform to the requirements of this Contract, the KARI 
representative shall promptly notify the Contractor, and confirm such notification in writing within ten 
(10) days, of the particulars in which such provision, delivery or performance does not meet the 
requirements of the Contract. The Contractor, upon receipt of such notice, shall promptly make the 
corrections of such non-conformity and notify KARI of the result of such corrections, or, if such prompt 
corrections are not possible, notify KARI of the reason why such prompt corrections are not possible and 
the period required for the corrections. 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 


background image

 

 

2016. 11 

 

 
 
 

33 

Space Test Division 

Article 15. Indemnification 
 
15.1 

Contractor  shall  indemnify  and  hold  KARI,  its  officers,  agents,  servants,  employees,  subsidiaries, 
successors, and assignees, or any of them, harmless from any and all loss, damage, liability or expense 
resulting  from  damage  to  all  tangible  property  and  injuries  including  death,  to  all  persons,  in  the 
circumstances caused by its act or omission in the performance of the Work, and shall pay all expenses, 
including reasonable attorneys’ fees, and satisfy all judgments as may be incurred by or rendered against 
them, or any of them. 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 


background image

 

 

2016. 11 

 

 
 
 

34 

Space Test Division 

Article 16. Licenses, Clearances and Permits 
 
16.1 

Unless  otherwise  specified  in  this  Contract,  each  Party  is  responsible  for  obtaining  all  government 
approvals from any government authority which has jurisdiction and authority to require such approvals, 
including, but not limited to, licenses, visas, and permits necessary to carry out such Party’s obligations 
in accordance with this Contract. KARI is responsible for obtaining any necessary Korean government 
approvals, and Contractor is responsible for all other government approvals.   

 
16.2 

The Parties shall cooperate and provide each other, upon request of and without cost to the other Party, 
all  reasonable  and  necessary  support  in  obtaining  any  and  all  governmental  approvals,  which  they 
respectively are required to obtain pursuant to this Contract.   

 
16.3 

Each Party shall be solely responsible for any expenses incurred in obtaining the approvals, which are 
required under this Article. The Parties shall provide to each other, upon request of and without cost to 
the other Party, suitable documents or other reasonable evidence to show that they have obtained any and 
all governmental approvals, which they respectively are required to obtain pursuant to this Contract. 

 
16.4 

Contractor shall obtain the export license for the export and/or re-export of all Deliverable Items to 
Korea, from Contractor’s government and all other governments other than Korean government, and 
for the re-export to Launch site for the transportation of Deliverable Items based upon KARI’s 
information. In the event that Contractor fails to obtain the above export licenses, within six (6) months 
from the EDC, KARI has the right to terminate this Contract in accordance with Article 19.2. In the 
event that Contractor obtains the above export licenses conditionally within six (6) months from EDC, 
if KARI determines that such conditions imposed on the export licenses significantly affects the 
Launch of KPLO, Article 19.2 shall be applied to as a same manner. 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 


background image

 

 

2016. 11 

 

 
 
 

35 

Space Test Division 

Article 17. Confidentiality 
 
17.1 

Each Party shall confidentially treat all documents, data, materials and information supplied by one to 
the other, and shall not disclose the above to any Third Party, and shall not use the above for any other 
purpose  than  for  the performance  of  this  Contract  without prior  written  consent  from the  other  Party. 
However, this Confidentiality obligation shall not be apply to the information which is made available to 
the general public. 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 


background image

 

 

2016. 11 

 

 
 
 

36 

Space Test Division 

Article 18. Warranty 
 
18.1 

Any  patent,  utility,  design,  copyright,  technical  know-how  and any  other  type  of  intellectual property 
used by Contractor, its Subcontractors, servants, or agents, or delivered or provided to KARI directly or 
indirectly in connection with this Contract shall be free of any infringement actions by any Third Party 
claiming its rights or interests with regard thereto in disposing with in accordance with this Contract. 

 
18.2 

The  Deliverable  Item  and  its  installation  supplied  and  performed  by  Contractor  or  its  Subcontractors 
hereunder shall be in good working order and free from all defects in workmanship and materials and 
shall comply with the requirements of this Contract. Warranty period for the Deliverable Item shall be 
one (1) year from the completion date of Inspection and Site Acceptance to KARI. 

 
18.3 

Upon the receipt of written notification from KARI that the Deliverable Item delivered by Contractor or 
its Subcontractors is defective or non-confirming, the Contractor shall repair or replace, at Contractor’s 
option and its own expense, such Deliverable Item so as to comply with the above warranties.     

 
18.4 

The  Contractor  shall  not  be  entitled  to  any  additional  costs  (for  instance,  the  cost  for  the  repair  or 
replacement of faulty parts at its option, the labor cost required for repair, traveling cost, per diem and all 
associated necessary costs) incurred or to recover any damages suffered due to defect in the Deliverable 
Item or rejection of the Deliverable Item by KARI. 

 
18.5 

Contractor  shall  submit  the  written  plan  for repair  within  forty  eight  (48) hours  after  the reception  of 
KARI’s notification of fault and shall completely finish the repair within the agreed time period after the 
receipt of KARI’s written notification of fault. 

 
18.6 

For an urgent service during any important test period using the Hydraulic Supply System, The remedy 
of  warranty  is  five  (5)  days  from  the  receipt  of  KARI’s  written  notification  of  service.  To  meet  the 
deadline of the urgent service, KARI will notify Contractor of the test start date and the period two (2) 
weeks prior to the test start date. Contractor shall stand by the A/S crews at Contractor's convenient place 
during the test period (up to four (4) weeks). Contractor shall include a plan for these requirements. 

 
18.7 

Both Parties acknowledge that the breach of a warranty may result in serious damages to KARI’s right, 
interests, privileges, and benefits, de facto or de jure, or loss of KARI’s profits. If a breach of warranty 
has not been cured within thirty (30) days from the date of KARI’s written notification to Contractor of 
such breach, Contractor shall pay all the damages to KARI due to the breach of any warranty or KARI 
shall have the right to terminate this Contract in accordance with Article 19.2. 

 
18.8 

The right and remedies  provided  under this Article  18  are  in  addition to  any  other rights  or remedies 
available to KARI under the Contract or applicable laws. 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 


background image

 

 

2016. 11 

 

 
 
 

37 

Space Test Division 

Article 19. Termination 
 
19.1 

Termination for Events of Force Majeure 

 
19.1.1  In the event that the excusable delay under Article 9 “Delay” exceeds three (3) months for any single 

Events of Force Majeure or six (6) months in the aggregate for all Events of Force Majeure, KARI, at its 
sole  discretion,  may  declare  frustration  of  this  Contract,  and  terminate  the  whole  or  any  part  of  this 
Contract by sending a three (3) days prior notice to the Contractor. 

 
19.1.2  In the event this Contract is terminated by Article 19.1.1 above, each Party shall effect the restitution to 

the other Party of whatever is provided, delivered, or paid to it in the same manner and types as such 
provision, delivery or payment was made. 

 
19.2 

Termination for Breach 

 
19.2.1  KARI may, by written notice to the Contractor, terminate the whole or any part of the Contract, if any of 

the following circumstances occurs; 
(a)  Contractor  fails  to  deliver  any  Deliverable  Item  under  Contract  in  accordance  with  the  delivery 

schedule; or   

(b)  Contractor  fails  to  perform  any  Work  under  this  Contract  or  fails  to  progress  with  the  Work  in  a 

manner which satisfies KARI that Contractor will perform the Contract within the time specified and 
in accordance with the terms of the Contract; or 

(c)  Contractor  fails  to  remedy  any  or  all  defects  and  non-conformity  on  the  Deliverable  Item  in 

accordance with Article 13. 

 
19.2.2  In the event of the circumstances in Article 19.2.1, KARI may notify the Contractor and may suspend 

any further performance of its obligation under this Contract. If the Contractor fails, within ten (10) days 
from  the  dispatch  of  the notice,  to  produce  and notify  KARI  of  reasonable  evidence  of  its  intent  and 
ability to effect due performance of the obligation in breach within thirty (30) days from due dispatch of 
written notice, then KARI may terminate this Contract with three (3) days’ prior notice of termination. 

 
19.2.3  In the event this Contract is terminated for Contractor’s breach, the Contractor shall return all the amounts 

paid by KARI under the Contract and also pay the termination charge of ten percent (10%) of the total 
Contract Price. KARI shall return the Deliverable Item to Contractor, if any. 

 
19.3 

Termination for Special Circumstances 

 
19.3.1  Either  Party  may  terminate this Contract anytime  upon  or after  due  dispatch  of  notice  of  such  effect, 

without any other conditions, in the event that the other Party falls within any of the following categories: 

 

(a) the other Party has fallen bankrupt or insolvent;   
(b) the other Party passed a resolution for its reorganization (bankruptcy related), dissolution, liquidation 

or winding-up; or 

(c) a court order for proceedings for the bankruptcy, reorganization (bankruptcy related), dissolution or 

winding-up of the other Party has been applied for by any person and such application has not been 
dismissed within sixty (60) days. 

 
19.3.2 

In the event this Contract is terminated by Article 19.3.1 above, each Party shall effect the restitution to 
the other Party of whatever is provided, delivered, or paid to it in the same manner and types as such 
provision, delivery or payment was made.   

 
19.4 

Termination for Convenience 

 
19.4.1  KARI may terminate this Contract, in whole or in part, for its convenience, with thirty (30) days’ prior 

written notice to Contractor. In case of such termination for convenience, Contractor is entitled to receive 
payment due which Contractor has already done in accordance with Article 6.1.2 within thirty (30) days 
from the date of termination and KARI shall release performance bond at the same time. 


background image

 

 

2016. 11 

 

 
 
 

38 

Space Test Division 

Article 20. Resolution of Disputes and Governing Law 
 
20.1 

In cases any controversy or claim arises out of or in relation to this Contract or with respect to a breach 
hereof, the Parties shall seek to resolve the matter amicably through discussions between themselves. In 
the event of any disagreement between KARI and Contractor about the interpretation of the provisions 
or definitions used in this Contract, the interpretation of KARI shall govern until and unless otherwise 
decided by arbitration conducted pursuant to the following provisions.   

 
20.2 

If the Parties cannot resolve such controversy or claim in accordance with Article 20.1 above, it shall be 
finally  settled  by  arbitration  in  Seoul,  Korea,  before  the  Korean  Commercial  Arbitration  Board  in 
accordance  with its rules. The  proceedings  shall  be  conducted  in English. The award rendered  by  the 
board shall be final and binding on the Parties and may be entered in any court of competent jurisdiction 
for execution. 

 
20.3 

The  validity,  performance,  construction,  and  effect  of  this  Contract  shall  be  governed  by  the  laws  of 
Korea. 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 


background image

 

 

2016. 11 

 

 
 
 

39 

Space Test Division 

Article 21. Language and Units 
 
21.1 

This Contract shall be executed in English. 

 
21.2 

All documents, drawings, plans and other writings as well as communications between both Parties shall 
be in English. 

 
21.3 

Measurements  and  quantities  for  deliverable  documentation  shall  be  recorded  in  units  of  Système 
Internationale. 

 


background image

 

 

2016. 11 

 

 
 

 

40           

Space Test Division

 

 

Article 22. Effective Date of Contract 
 

22.1 

The effective date of this Contract ("EDC") is the date when the duly authorized 

representatives of both Parties have signed this Contract.   

   

22.2 

Any amendment to this Contract shall be effective upon signature by the authorized 

representatives of both Parties and the approval of such amendment by the government of 

both Parties, if required. 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 


background image

 

 

2016. 11 

 

 
 

 

41           

Space Test Division

 

 

Article 23. Changes 
 

23.1 

Changes Requested by KARI 

 

23.1.1  Any changes requested by KARI during the performance of this Contract, within the general 

scope of this Contract, which would add or delete Work, affect the design of Work, change 

the method of shipment or packing, place or time of delivery, duration of Contract, or would 

affect any other requirement of this Contract, shall be submitted in writing to Contractor. 

Contractor shall respond to any changes KARI requested in writing within thirty (30) days 

after  receipt  of  such  request.  If  such  change  requested  by  KARI  causes  an  increase  or 

decrease in the Contract Price and/or an impact of schedule, Contractor shall submit to KARI 

at the time the response to the requested change is submitted, the details of such increase or 

decrease. 

 

23.1.2  KARI shall notify Contractor in writing, within thirty (30) days after receipt of Contractor’s 

response,  whether it  agrees  with and  accepts  Contractor’s response.  If  KARI  agrees  with 

and accepts Contractor’s response, an amendment to the Contract reflecting such change, 

Contract  Price  and/or  schedule  adjustment,  if  any,  shall  be  issued,  and  Contractor  shall 

proceed with the performance of the Contract as changed. Contractor shall provide updated 

information that reflects the final agreed price of the change, if KARI requests. In the event 

the Parties are unable to agree on a change requested by KARI or price adjustment, if any, 

or both, Contractor shall proceed with the performance of the Contract as unchanged. 

 

23.2 

Changes Requested by Contractor 

 

23.2.1  Any changes requested by Contractor during the performance of this Contract, within the 

general scope of this Contract, that would add or delete Work, affect the design of Work, 

change the method of shipment or packing, place or time of delivery, duration of Contract, 

or would affect any other requirement of this Contract, shall be submitted in writing to KARI 

thirty  (30)  days  prior  to  the  proposed  date  of  the  change.  If  such  change  requested  by 

Contractor causes an increase or decrease in the Contract Price, Contractor shall submit to 

KARI at the time the requested change is submitted, the details of such increase or decrease. 

 

23.2.2  KARI shall notify Contractor in writing within thirty (30) days after receipt of the requested 

change and Contract Price adjustment, if any, whether or not it agrees with and accepts such 

change. If KARI agrees with and accepts change requested by Contractor, an amendment to 

the Contract reflecting such change, and Contract Price adjustment, if any, shall be issued, 


background image

 

 

2016. 11 

 

 
 

 

42           

Space Test Division

 

 

and Contractor shall proceed with the performance of the Contract as changed. Contractor 

shall  provide  updated  information  which  reflects  the  final  agreed  price  of  the  change,  if 

KARI  requests.  In  the  event  the  Parties  are  unable  to  reach  an  agreement  on  a  change 

requested  by  Contractor,  or  Contract  Price  adjustment,  if  any,  or  both,  Contractor  shall 

proceed with the performance of the Contract as unchanged. 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 


background image

 

 

2016. 11 

 

 
 

 

43           

Space Test Division

 

 

Article 24. Notices 
 

24.1 

All notices, requests, demands, approvals, reports, invoices, and other correspondence to be 

provided pursuant to this Contract shall be in writing and shall be deemed to have been duly 

given to the Party to be notified: (i) on the date of delivery if delivered in person, (ii) on the 

date of dispatch if by facsimile, telex or e-mail, or (iii) on the date of receipt if by registered 

airmail or overnight courier. 

 

All notices shall be addressed to the appropriate Party at its address as follows: 

 

For KARI: Korea Aerospace Research Institute 

169-84 Gwahakro, Yuseong-gu, Daejeon 34133, Korea 

Commercial matters 

Technical matters 

Mr. Jung-Nam CHO 
Tel: +82-42-860-2613 
Fax:+82-42-860-2666   
E-mail: jncho@kari.re.kr 

Mr. Jong-Min IM 
Tel: +82-42-860-2562   
Fax:+82-42-860-2234 
E-mail: acoust@kari.re.kr 

 

For Contractor: Contractor 

                                        address 

Commercial matters 

Technical matters 

Mr. TBD 
Tel: +TBD   
Fax: +TBD 
E-mail: TBD 

Mr. TBD 
Tel: +TBD   
Fax: +TBD 
E-mail: TBD 

 

24.2 

Each Party may change its address for notice by notice given to the other Party in the manner 

set forth above. And any notices given as provided herein shall be considered effective seven 

(7) days after the registered postage pre-paid airmailing thereof or the day of actual receipt 

thereof, whichever occurs first, or on the day of personal delivery, or the day of sending if 

by facsimile, telex or e-mail. 

 

 

 

 

 

 

 

 


background image

 

 

2016. 11 

 

 
 

 

44           

Space Test Division

 

 

Article 25. Miscellaneous 
 

25.1   

Effective Date of the Contract 

 

 

The  effective  date  of  this  Contract  ("EDC")  is  the  date  on  which  the  duly  authorized 

representatives  of  both  Parties  have  signed  this  Contract,  and  any  amendment  to  this 

Contract  shall  be  effective  only  upon  signature  by  the  authorized representatives  of  both 

Parties. 

 

25.2 

Entire Agreement 

 

This Contract embodies the entire agreements of the Parties with respect to the subject matter 

hereof  and  supersedes  and  cancels any  and  all  prior  understandings  or  agreements,  oral  or 

written, in relation hereto, which may exist between the Parties. No oral explanation or oral 

information by any of the Parties shall alter the meaning or interpretation of this Contract. 

 

25.3 

Assignability 

 

This Contract and each and every covenant, term and condition hereof shall be binding upon 

and inure to the benefit of the Parties and their respective successors, and neither this Contract 

nor any rights and obligations hereunder shall be assignable or delegable directly or indirectly 

by either Party without the prior written consent of the other Party. 

 

25.4 

Unenforceable Terms 

 

If  any  term  or  provision  of  this  Contract  shall  for  any  reason  be  invalid,  illegal  or 

unenforceable in any respect, this Contract shall be interpreted and construed as if such term 

or provision had never been included herein. 

 

25.5 

Non-waiver 

 

The failure or delay of any Party to require performance by the other Party of any provision 

of, or of any right or obligation under this Contract, shall not constitute a waiver thereof, nor 

shall  such  affect  that  Party’s  right  to  thereafter  require  performance  of  such  or  any  other 

provision, right or obligation. 

 

25.6 

Disclaimer of Agency 


background image

 

 

2016. 11 

 

 
 

 

45           

Space Test Division

 

 

 

This Contract shall not be deemed to constitute any Party to become the agent of the other 

Party. 

 

25.7 

Headings 

 

The headings in this Contract have been inserted for convenience of reference only and are 

not to be used in consulting or interpreting this Contract. 

 

 

 

25.8 

Language and Unit   

 

All documents, drawings, plans and other writings as well as communications between both 

Parties  under  this  Contract  shall  be  in  English  and  measurements  and  quantities  for 

Deliverable Data shall be recorded in units of Système Internationale. 

 

25.9 

Time Limits 

 

Unless otherwise indicated, any time limits to which this Contract binds Contractor or KARI 

shall be counted in calendar days from the day following that of the event marking the start 

of the time limit, and shall end on the last day of the period specified. When the last day of a 

time limit is a Saturday or Sunday, or a legal holiday in the country in which the particular 

contractual performance is required, such time limit shall be extended to the first working day 

following. 

 

25.10 

Subcontractors 

 

Each Party shall be fully responsible for the work of its Subcontractors under this Contract, 

and such subcontracting shall not relieve that Party of its obligation under this Contract.