KARI PROPRIETARY
Request For Proposal
RF Power Amplifiers Set
for GK2 System EMC Test
May 2016
Space Test Department
Korea Aerospace Research Institute
169-84 Gwahakro, Yuseung-gu, Daejeon, 34133, KOREA
Phone : 82(42)860-2977, Fax : 82(42)860-2234
KARI PROPRIETARY
Request For Proposal
for
RF Power Amplifiers Set
for GK2 System EMC Test
IMPORTANT
1. This RFP should be kept in confidentiality and should
neither be copied nor distributed to the third parties.
2. The questions and opinions on this RFP can be asked or
suggested to Korea Aerospace Research Institute before
submission of the proposal.
3. This RFP shall be legal bind after the contract is awarded
unless the bidder explicitly expresses the differences from the
RFP in the compliance sheet.
May 2016
Space Test Department
Korea Aerospace Research Institute
169-84 Gwahakro,
Yuseong-gu
DAEJEON, 34133, KOREA
Phone : 82(42)860-2977, FAX : 82(42)860-2234
e-mail : jjw0302@kari.re.kr
Table of contents
I. OVERVIEW .............................................................................................................................. 4
1. Overview of the project ....................................................................................... 4
2. Procedures of the project ..................................................................................... 5
3. Requisites of participants .................................................................................... 6
4. Scope of the contracct ......................................................................................... 6
5. Warrnaty .............................................................................................................. 7
6. Product supply schedule ...................................................................................... 8
II. TECHNICAL REQUIREMENTS .......................................................................................... 9
1. General ................................................................................................................ 9
2. Detail Specification ........................................................................................... 11
III. BIDDER INSTRUCTION ................................................................................................... 26
IV. GENERAL TERMS AND CONDITIONS ........................................................................... 33
APPENDIX 2. PERFORMANCE TEST REPORT(EXAMPLE) ............................................. 60
RFP.SITC.KARI.KOREA
2016.05
4
Space Test Dept.
I. Overview
1.
Overview of the project
1.1. Korea Aerospace Research Institute (hereinafter referred to as
“KARI”) is located at Daeduk Research Complex, 140 km south of
Seoul.
1.2. KARI has a satellite assembly, integration and test center
(hereinafter referred to as “AITC”) for joint use by corporations and
research institutes for the purpose of the effective development of
domestic satellites. And basic facilities and equipment for satellite
assembly and test have been supplied, installed and used.
1.3. The purpose of this project is to install RF power amplifier systems,
remote control panel, relating cable lines and Bi-directional
couplers installed in amplifier room of the Large EMC
chamber(LEMC).
1.4. The main undertakings of the project are to perform factory and
site acceptance tests, install, guarantee quality and training, etc.
1.5. The supply should submit the business showings of the installing
the power amplifier & control system.
1.6. All the descriptions in this RFP are minimum requirements and the
supplier can suggest the better one to improve the overall
performance and cost. But in this case, the proposal should clearly
indicate the improvements from KARI’s requirements.
RFP.SITC.KARI.KOREA
2016.05
5
Space Test Dept.
2.
Procedures of the project
2.1. The project shall be proceeded with five parts as follows:
2.1.1. Organization of power amplifiers, external directional couplers,
control panel and accessories including waveguides.
2.1.2. Factory acceptance test & safety plan verification
2.1.3. Transportation
2.1.4. Installation at KARI
2.1.5. Final acceptance test at KARI according to supplied test
procedure & previous test results
2.2. The participants shall submit the detailed work schedule for article
2.2.1. Specially, the work schedule at KARI shall be confirmed by
KARI for avoiding overlap with KARI’s other test schedules.
2.3. The format of proposal
2.3.1. The participants shall submit 6 copies of a detailed proposal
and a price proposal to KARI according to the format and
contents satisfying the requirements stipulated in this RFP.
2.3.2. The compliance sheet with the requirement of this RFP shall
certainly be included in the proposal.
Table 1. Statement of Compliance Format
RFP Sections
Descriptions
Proposal
Sections
Compliance
Status
Remarks
RFP section
Title or contents Proposal
section and
page number
C: Fully comply
NC: Not comply
PC: Partial comply
Key performance,
summary shall be
Described
RFP.SITC.KARI.KOREA
2016.05
6
Space Test Dept.
2.3.3. The price Proposal shall be submitted to KARI in a separate
envelope.
2.3.4. The participants shall make out a proposal with their own
writing.
2.3.5. The language shall be English or Korean.
2.4. The proposal shall be delivered to KARI before the due date for
submission.
2.5. All proposals and documents submitted shall become the property
of KARI.
3.
Requisites of participants
3.1. The participants shall provide the introduction of the company
about general organization, and company’s resources including
financial status.
3.2. The participants shall have experience of installation, operation,
arranging, integration of power amplifiers(which are equal or more
power amplifiers in this proposal) to be installed in EMC chamber.
4.
Scope of the contract
4.1. The project is on turnkey base and the proposal shall include the
following;
4.1.1. Engineering work of the equipment
4.1.2. Manufacture, assembly and turnkey delivery of the equipment
RFP.SITC.KARI.KOREA
2016.05
7
Space Test Dept.
4.1.3. Parts and particular instruments necessary to operate the
equipment
4.1.4. Installation work and acceptance test at factory & KARI site
4.1.5. Project management, site operation, cooperation with KARI
4.1.6. Basic principle, operation, warranty, maintenance, repair, safety
and training for the equipment
4.1.7. Relevant books and manuals
4.1.8. Other necessary matters required for acquiring and installing
the equipment (including checking of AITC building interface
and construction)
5.
Warranty
5.1. The system shall be warranted for a duration of 1 year from the
date of definitive acceptance on the site against any operational
faults. The date of acceptance is the date when the whole system
is completely installed and its function is approved perfect in a
written format by KARI or its representative.
5.2. The warranty covers the replacement of faulty parts, the labor
required for repair, traveling cost, living fees and all associated
necessary costs.
5.3. The contractor or A/S teams shall submit the written plan for
repair within 48 hours after the reception of the notification of
fault. The contractor or A/S teams shall completely finish the repair
within 30 days after the reception of the notification of fault.
RFP.SITC.KARI.KOREA
2016.05
8
Space Test Dept.
5.4. For an urgent service during important testing period, the deadline
for action is 5 days from the reception of the notification of
service. To meet the deadline of the urgent service, KARI will notify
the contractor of the test start date and the period 2 weeks before
the test start date. The contractor shall stand by the A/S crews at
contractor's convenient place during the test period (up to 4
weeks).The contractor shall include a plan for these requirements
in the proposal.
5.5. To meet these requirements, the contractor shall propose a
detailed plan for the prompt repair in the proposal. The detailed
information (location, number of crews, resume, phone and FAX
numbers, e-mail address, etc.) of the A/S teams shall be shown in
the proposal and shall be approved by KARI.
6.
Product supply schedule
The contractor shall meet the key points schedule as below;
(The supply schedule can be adjusted based on the building construction
schedule in KARI)
Items
Key Points Schedule
RF Power
amplifiers set
- Arrival at KARI : before the end of December 2016
- Installation & Finish site acceptance : before the
end of February 2017
RFP.SITC.KARI.KOREA
2016.05
9
Space Test Dept.
II. TECHNICAL REQUIREMENTS
1. General
Power amplifiers will be installed in amplifier room of Large EMC
chamber(LEMC, TH#11) in KARI as shown in Figure 2.1 & 2.2.
Fig. 2.1 Expected amplifier position in EMC chamber of KARI
RFP.SITC.KARI.KOREA
2016.05
10
Space Test Dept.
Fig. 2.2 Power amplifier configuration example in Amplifier room
RFP.SITC.KARI.KOREA
2016.05
11
Space Test Dept.
Fig. 2.3 RF connection in EMC chamber(example)
2. DETAIL SPECIFICATION
(1) System concept
A. Modular
"construction
system"
enables
individual
combinations with almost unlimited flexibility
B. Platform concept allows compact system dimensions for
customized configurations
C. Integral overall system design
D. RF adapted design
E. Rugged mechanical design
RFP.SITC.KARI.KOREA
2016.05
12
Space Test Dept.
F. Requried to efficient cooling
G. Flexible remote control : TTL, IEEE 488.2, RS-232C, USB and
LAN TCP/IP
H. MIL-Standard based system design in correspondence with
instrument safety regulations (VDE, CE)
(2) Environment condition
A. Temperature condition
i.
Ambient temperature : 0℃ ~ 45℃
ii.
Storage temperature: -20˚C ~ +85˚C
B. Relative humidity : up to 95%
C. Location : normal laboratory environment
D. Operating altitude : up to 2000m above sea level
(3) Composition
A. RF Power amplifiers
Power amplifiers are composed by following items. Six amplifiers cover
frequency ranges of 4 kHz ~ 18 GHz. Output power for each amplifers
is decribed in Table 3.1.
RFP.SITC.KARI.KOREA
2016.05
13
Space Test Dept.
Table 3.1 RF Power amplifiers set
Equipment Operating Frequency
Output PowerNote1)
Remark
AMP 1
4 kHz ~ 400 MHz
More than 150 WNote2)
RS/CS test
AMP 2
10 kHz ~ 200 MHz
More than 5,000 WNote3)
Radiated susceptibility test
AMP 3
200 MHz ~ 1 GHz
More than 1,200 W
Radiated susceptibility test
AMP 4
1 GHz ~ 2.5 GHz
More than 250 W
Radiated susceptibility test
AMP 5
2 GHz ~ 8 GHz
More than 250 W
Radiated susceptibility test
AMP 6
8 GHz ~ 18 GHz
More than 250 W
Radiated susceptibility test
Note1) All output power mean output power @ 1dB compression point over the
operating frequency range
Note2) 60W (4kHz – 9kHz), 150W (9kHz – 400MHz)
Note3) 5,000W(9kHz – 100MHz) / 4,000W(100MHz – 220MHz)
B. External directional coupler
Directional coupler can be used to monitor fwd/rev power in output
port of power amplifier. Power Handling Capability for each couplers is
decribed in Table 3.2.
Table 3.2 External direction couplers
Equipment
Operating Frequency
Power Handling Capability
Coupler 1
4 kHz ~ 400 MHz
More than 150 W
Coupler 2
10 kHz ~ 200 MHz
More than 5,000 W
Coupler 3
200 MHz ~ 1 GHz
More than 1,200 W
RFP.SITC.KARI.KOREA
2016.05
14
Space Test Dept.
Coupler 4
1 GHz ~ 2.5 GHz
More than 250 W
Coupler 5
2 GHz ~ 8 GHz
More than 250 W
Coupler 6
8 GHz ~ 18 GHz
More than 250 W
C. RF Power Amplifier System Technical Specifications and
Acceptance Test Reports
D. Accessories
i.
RF cable from AMP2 output to Access Panel (1ea)
ii.
RF cable from AMP3 output to Access Panel (1ea)
iii.
Waveguide adapter(WRD 750 to Precision N) for AMP6
1ea
iv.
Movable Rack for easily handling of AMP4, AMP5, AMP6
v.
Controlling Units(2ea) for monitoring & handling RF Power
amplifier set
(4) Electrical Specification
A. Power amplifiers
Delivered power amplifiers should have performances more than defined
value in table 4.1 and 4.2.
Table 4.1 Electrical specification in low frequency power amplifiers
Item
Specification
AMP1
AMP2
AMP3
RFP.SITC.KARI.KOREA
2016.05
15
Space Test Dept.
Frequency Range
4kHz – 400MHz
9kHz~220MHz
200MHz~1000MHz
Output Power
More than 150W at
1dB
compression
point
over
the
operating frequency
range note1)
More
than
5,000W/4,000W
at
1dB
compression
point
over
the
operating
frequency
rangenote2)
More than 1,200W at
1dB
compression
point
over
the
operating
frequency
range
Gain
47.8 dB (4kHz –
9kHz)
51.8 dB (9kHz -
400MHz)
minimum 67 dB
minimum 60 dB
Harmonics
20dBc
for
2nd
harmonic
20dBc
for
3rd
harmonic
20dBc
for
2nd
harmonic
20dBc for 3rd harmonic
20dBc
for
2nd
harmonic
20dBc for 3rd harmonic
Line Power
Less than 35 kVA
12.5 kVA
Spurious (at PN)
-50
dBc
typical
(excluding harmonics)
-60
dBc
typical
(excluding harmonics)
-50
dBc
typical
(excluding harmonics)
Class of Operation
A-linear or AB-linear A-linear
A-linear or AB-linear
Overdrive
Protection
up to +10 dBm for
no damage
up to +10 dBm for no
damage
up to +10 dBm for no
damage
Input Impedance
50 Ohm nominal
50 Ohm nominal
50 Ohm nominal
Output Impedance
50 Ohm nominal
50 Ohm nominal
50 Ohm nominal
Input VSWR
<2:1 maximum
<2:1 maximum
<2:1 maximum
Load VSWR
2:1 maximum
6:1 maximum without
foldback
2:1 maximum
RF Input
N(female)
N(female)
N(female)
RFP.SITC.KARI.KOREA
2016.05
16
Space Test Dept.
RF Output
N(female)
EIA 1 5/8-f, standard
on rear panel
7-16-f,
standard
on
rear panel
Main Supply Power
200 – 264 V AC ±
10% / 47-63Hz
3 × 380V AC, 60Hz
3 × 380V AC, 60Hz
Note1) 60W (4kHz – 9kHz), 150W (9kHz – 400MHz)
Note2) 5000W(9kHz – 100MHz) / 4000W(100 – 220MHz)
Table 4.2 Electrical specification in high frequency power amplifiers
Item
Specification
AMP 4
AMP 5
AMP 6
Frequency
Range
1 GHz~2.5 GHz
2 GHz~8 GHz
8 GHz~18 GHz
Output Power
More than 250 W at 1
dB compression point
over the operating
frequency range
More than 250 W at 1
dB compression point
over
the
operating
frequency range
More than 250 W at 1
dB compression point
over
the
operating
frequency range
Gain
62 dB ± 7.5 dB
62 dB ± 7.5 dB
62 dB ± 7.5 dB
Harmonics
4
dBc
for
2nd
harmonic
12
dBc
for
3rd
harmonic
1 dBc for 2nd harmonic
5 dBc for 3rd harmonic
8 dBc for 2nd harmonic
20 dBc for 3rd harmonic
Line Power
3000 VA
3000 VA
1500 VA
Spurious
(at
PN)
-50
dBc
typical
(excluding harmonics)
-50
dBc
typical
(excluding harmonics)
-50
dBc
typical
(excluding harmonics)
Class
of
Operation
A-linear
A-linear
A-linear
Overdrive
up to +10 dBm for no up to +10 dBm for no up to +10 dBm for no
RFP.SITC.KARI.KOREA
2016.05
17
Space Test Dept.
Protection
damage
damge
damage
Input
Impedance
50 Ohm nominal
50 Ohm nominal
50 Ohm nominal
Output
Impedance
50 Ohm nominal
50 Ohm nominal
50 Ohm nominal
Input VSWR
<2:1 typical
<2:1 typical
<2:1 typical
Load VSWR
2:1 maximum
2:1 maximum
2:1 maximum
RF Input
N(female)
N(female)
N(female)
RF Output
N(female)
N(female)
WRD 750
Main
Supply
Power
200~264 VAC /47~63
Hz
200~264 VAC /47~63
Hz
200~264 VAC /47~63
Hz
B. Directional Coupler
Delivered directional couplers should have performances more than
defined value in Table 4.3 and 4.4
Table 4.3 Electrical specification in low-frequency directional coupler
Item
Directional Coupler Specification
Coupler 1
Coupler 2
Coupler 3
Frequency range
4 kHz to 400 MHz
9 kHz to 200MHz
80 MHz to 1,000 MHz
Power handling
capability
200 W
5,000 W
1,500 W
Coupling
40 dB ±0.5 dB
60 dB ±1.0 dB
50 dB ±0.3 dB
Insertion loss
<0.5 dB
<0.1 dB
<0.1 dB
RFP.SITC.KARI.KOREA
2016.05
18
Space Test Dept.
Ripple
±1 dB
±1 dB
±0.5 dB
VSWR(max.)
1.25 : 1
1.3 : 1
1.1 : 1
RF interface
N(female)
EIA 1 5/8”
7-16(female)
Table 4.4 Electrical specification in high-frequency directional coupler
Item
Directional Coupler Specification
Coupler 4
Coupler 5
Coupler 6
Frequency range
1 GHz~4 GHz
2 GHz~8 GHz
8 GHz~18 GHz
Power handling
capability
More than 500 W
More than 500 W
More than 500 W
Coupling
50 dB ± 1 dB
50 dB ± 1 dB
50 dB ± 1 dB
Insertion loss
<0.2 dB
<0.2 dB
<0.2 dB
VSWR(max.)
1.3:1
1.3:1
1.1:1
Ripple
± 1.0 dB
± 1.0 dB
± 1.0 dB
RF interface
N type
N-type
WRD W/G connector
C. RF Accessories
-
RF cable from AMP2 output to Access Panel (1ea)
-
RF cable from AMP3 output to Access Panel (1ea)
-
Waveguide adapter(WRD 750 to Precision N) for AMP6
1ea
-
Movable Rack for easily handling of AMP4, AMP5, AMP6
-
Controlling Units(2ea) for monitoring & handling RF
Power amplifier set
RFP.SITC.KARI.KOREA
2016.05
19
Space Test Dept.
(5) RF Power amplifier system structure
A. Power stage
- D/C Bias supply power source
B. Control stage
- Diagnostic function
C. Driver module
- Amplifier stage to drive high-power
D. Final stage
- Including output combiner
(6) RF characteristics
A. System parameters specified at rated output power (harmonic
distortion, spurious, power consumption etc.)
B. Standard operating range up to +45°C without degradation
C. Isolation of all individual RF transistors for optimum protection
against extreme mismatch and for providing a fault tolerant
system layout
D. VSWR optimized PIN-diode switches for optimum RF
matching
E. Reliable continuous operation without degradation including
+45°C
RFP.SITC.KARI.KOREA
2016.05
20
Space Test Dept.
(7) Power supply
A. Distributed design supporting a fault tolerant concept allows
continued operation with degraded performance
B. Individual power drains for all output transistors
i.
Ideal supply conditions (individual sense lines)
ii.
Separate current and voltage limiting
iii.
Protection of output transistors against extreme mismatch
C. Enhanced efficiency for reduced source power requirements
D. Optimum supply and perfect protection of amplifier stages
(8) Mechanical design
A. RF modules milled from solid
i.
RF shielding
ii.
heat dissipation
iii.
RF grounding
B. Massive base plates
i.
thermal sources (transistors and load resistors) are directly
soldered onto massive base plates
C. All metal parts protected by surface passivation
i.
protection from oxidation (corrosion)
ii.
excellent long term system stability
iii.
perfect system grounding
RFP.SITC.KARI.KOREA
2016.05
21
Space Test Dept.
D. Compact and rugged mechanical design for mobile
applications (ground, seaborne and airborne)
(9) Cooling System Design
A. Standard air cooling
i.
special high efficiency heat sinks with double side assembling
ii.
highly efficient straight air flow
iii.
compact system layout
B. External Heat Exchangers convection cooling up to +50°C
i.
no high capacity required for conventional air condition
ii.
less power consumption
iii.
compact size (compared to compression type)
C. Optimum system cooling to ensure high reliability and
extended lifetime
(10)Acceptance Test and Training
Following acceptance test shall be performed for all delivered
amplifiers.
A. Acceptance inspection
i.
Unpacking
ii.
Visual inspection
iii.
Installation of the Amplifier in EMC chamber
RFP.SITC.KARI.KOREA
2016.05
22
Space Test Dept.
iv.
Electricity connection
v.
RF cable connection
vi.
After attaching Dummy load which is provided by vendor,
output power check
vii.
Remote control line connection
viii.
Fill acceptance test results in the performance test report
sheet of appendix
B. Acceptance test items and methods
i.
Electricity Availability
(a) KARI input power : single phase 200 V~220 V AC, 60Hz
AND 3 phases 380V AC, 60Hz
(b) Confirm Power amplifier operation availability with
KARI electrical source
ii.
Visual inspection
(a) Rack size considering amplifier room
(b) Exterior damage
(c) Shape availability
(d) Mobility through wheels
(e) Internal air circulation panel
(f) Physical interface of RF input/output port
iii.
VSWR
For each power amplifier, VSWR of input/output ports shall be less
than 2:1.
RFP.SITC.KARI.KOREA
2016.05
23
Space Test Dept.
VSWR
AMP1
AMP2
AMP3
AMP4
AMP5
AMP6
Input
<2:1
<2:1
<2:1
<2:1
<2:1
<2:1
Output
<2:1
<6:1
without
foldback
<2:1
<2:1
<2:1
<2:1
iv.
Input overload
(a) Check of damage or not input power of 10 dBm for
sampling frequency
(b) Sampling frequency means selection of frequency
more than 1 point for frequency range of 100 MHz
v.
Remote control interface
(a) Check the remote control availability using GPIB
interface module (production of KARI)
(b) Function of Power ON/OFF, HV ON/OFF should be
implemented using remote control
vi.
Check of Output power
(a) Output power linear region(@1 dB compression) of
power amplifers shall be more than following
specification.
AMP1
AMP2
AMP3
AMP4 AMP5 AMP6
Output
power
>150WNote1) >5,000WNote2) >1,200W
>250W
Note1) 60W (4kHz – 9kHz), 150W (9kHz – 400MHz)
RFP.SITC.KARI.KOREA
2016.05
24
Space Test Dept.
Note2) 5000W(9kHz – 100MHz) / 4000W(100 – 220MHz)
(b) Sampling frequency means selection of frequency
more than 1 point for frequency range of 100 MHz
vii.
Check of gain
(a) Gain of power amplifers shall be more than following
specification.
AMP1
AMP2
AMP3
AMP4
AMP5
AMP6
Gain
>47.8dB
>67dB
>60dB
>54dB
>54dB
>54dB
(b) Sampling frequency means selection of frequency
more than 1 point for frequency range of 100MHz
viii.
Check of harmonic
(a) Spurios(excluding harmonics) of power amplifers shall
be more than following specification.
AMP1
AMP2
AMP3
AMP4
AMP5
AMP6
Spurious <-50dB
<-60dB
<-50dB
<-50dB <-50dB <-50dB
(b) Sampling frequency means selection of frequency
more than 1 point for frequency range of 100MHz
ix.
Durability
RFP.SITC.KARI.KOREA
2016.05
25
Space Test Dept.
(a) After the power amplifier is operating during 2 hours,
technical performance should be maintained.
(b) Technical performance includes as follows :
- Transducer gain
- Output power
- Harmonic
C.
If needed by request of a purchaser, Factory Acceptance Test
shall be performed in the place of production.
RFP.SITC.KARI.KOREA
2016.05
26
Space Test Dept.
III. Bidder Instruction
1.1. Qualification of Bidders
(1) Bidder shall have experience of installation, operation, arranging,
integration of power amplifiers(which are equal or more power amplifiers
in this proposal) to be installed in EMC chamber.
(2) The qualifying statement for above requirements and support materials
shall be included in the Proposal.
(3) Bidder shall be in possession of all the necessary licenses, in effect as
of the Bid Closing Date, required for the development of RF Power
amplifier as described in this RFP.
1.2. Submittal of Proposal
The proposal shall be hand-carried or sent via appropriate express courier to
KARI personnel or his designee within the Bid Closing Date and Time. A deputy
shall submit the power of attorney and a copy of his identification.
1.2.1. Number of copies
The Proposal should be made in six (6) copies of technical proposal and one
(1) of price proposal in English. In case of any discrepancies between the
Proposals, the original hardcopy shall prevail.
1.2.2. Bid closing date
The closing time for the Proposal is June 07, 2016 14:00 local time. If any part
of the Proposal as required under this RFP is submitted after the stipulated
closing time, the entire Proposal will be deemed late. KARI in its absolute
discretion may exclude any late from further consideration.
1.2.3. Point of contact
Besides the Proposal submission, the point of contact for all communications
for technical matters shall be
Mr. Jae-Woong JANG
Space Test Division
Korea Aerospace Research Institute (KARI)
169-84 Gwahakro, Yuseong-Gu
RFP.SITC.KARI.KOREA
2016.05
27
Space Test Dept.
Daejeon, 34133, Korea
Tel : +82-42-860-2977
Fax: +82-42-860-2234
E-mail : jjw0302@kari.re.kr
The communication between KARI and prospective Bidders for contractual
matters (Terms and Conditions) shall be controlled through the following
designee:
Mr. Jung-Nam CHO
Senior Administrator of Procurement Team
Korea Aerospace Research Institute (KARI)
169-84 Gwahakro, Yuseong-Gu
Daejeon, 34133, Korea
Tel : +82-42-860-2613
Fax: +82-42-860-2666
E-mail : jncho@kari.re.kr
Bidder’s information on the points of contact shall include the name,
title/position, telephone number, E-mail address, and facsimile number.
1.2.4. Information on the evaluation
The evaluation of the Proposals will be performed by the evaluation
committee in KARI. The following evaluation guidelines are for information
only, and the evaluation committee reserves the right to modify the guidelines
without any prior notification to Bidders.
Principles of evaluation are as follows;
(1)
Subject to an initial review of the Proposal, KARI may send to
Bidders a set of questions for clarification and supplementation to the
Proposal, and the evaluation will be made based on the Proposal and
the answers received from Bidders.
(2)
The evaluation will be performed for the technical part of the
proposal first, and the price proposal will be evaluated considering the
quality of proposed technology and work package contents.
(3)
The evaluation committee may select a few best qualified and
compliant Proposals and may request the selected Bidders to submit
RFP.SITC.KARI.KOREA
2016.05
28
Space Test Dept.
the best and final Proposal including cost adjustments to the items
needed for normalization of the work to be performed and the
specifications to be achieved.
(4)
The evaluation will be based on the baseline work scope. Any
optional propositions will be evaluated separately.
(5)
The result of the evaluation is at the proposal evaluation
committee’s discretion based on the evaluation process and any
Bidders shall not raise any objection regarding proposal evaluation
committee’s decision thereupon.
1.3. Validity of Proposal
Proposal shall be valid for three (3) months from the Bid closing date and upon
KARI’s request, shall be extended for another three (3) months.
1.4. Bid Bond
1.4.1. Amount of Bid Bond
Bidder shall establish a bid bond in favor of KARI not later than the Bid
Closing Date and submit the certificate to KARI along with this Proposal. The
total amount of the bid bond shall be at least five (5) percent of the total
bidding price. The bid bond shall remain valid for three (3) months, and if the
Bid validity is extended as per Section 1.3, the bid bond shall also be
extended accordingly.
1.4.2. Bid Bond Establishment Method
The bid bond in Section 1.4.1 hereinabove shall be issued by the Seoul
Guarantee Insurance Company in the form of a surety bond or by first class
international bank in the form of an irrevocable letter of credit and advised
through “Woori Bank” (Daejeon Branch at 29 Munye-ro, Seo-gu, Daejeon,
35241 Korea, Tel: +82-42-488-9704, Ext. 312 / Fax:+82-505-003-0759). The
bond shall be available by KARI’s request on the Seoul Guarantee Insurance
Company or by KARI's draft at sight drawn on the Bank, accompanied with
the statement of KARI stating that Bidder has refused to enter into a Contract
with the terms and conditions in the RFP as amended, if any, that Bidder has
hindered the fair bidding by fraud or misrepresentation, or that Bidder has
withdrawn its Proposal after the Bid Closing Date. The bid bond shall contain
RFP.SITC.KARI.KOREA
2016.05
29
Space Test Dept.
the substantial part of the terms and conditions of the bond, date of
establishment, account, amount, payment terms, and date of expiry, etc.
1.4.3. Bid Bond Return
The bid bonds will be released upon the instructions of KARI, without interest,
promptly after KARI’s selection of the Successful Bidder.
1.4.4. Contractor’s Bid Bond
When the Contract is executed, the bid bond shall be released upon the
instructions of KARI to the Contractor, without interest, promptly after the
Contractor shall established a performance bond in favor of KARI.
1.5. Questions and Modifications
Any questions as to the intent and clarity of the RFP may be asked to KARI’s
point of contact as specified in Section 1.2.3 by E-mail, fax or letter before the
Bid Closing Date.
After the Bid Closing Date, Bidders shall not amend, modify, or supplement the
Proposal, or submit any other documents to KARI, except with KARI's written
request.
KARI may ask, in writing, questions as to the intent and clarity of the Proposal
to Bidders or request the Bidders to provide supplementary information or data.
1.6. No Contractual Obligation
This RFP shall not be interpreted as an offer for a Contract or any type of
guarantee by KARI. It is KARI's sole discretion whether or not to allow the
Contract award to any Bidder. KARI owes no responsibility or obligation to
select the Contractor among Bidders.
This solicitation for the Proposal shall neither be construed to create an
obligation on KARI to enter into a contractual instrument, nor shall it serve as a
basis for any claim for reimbursement of costs for the effort to prepare, submit,
amend, revise or supplement the Proposal, and other related documents
expended by Bidder regardless of whether or not Bidder is successful in
receiving an award as a result of the solicitation.
RFP.SITC.KARI.KOREA
2016.05
30
Space Test Dept.
1.7. Acceptance/Rejection of Bids
KARI reserves the right to accept or reject any Bidding, and to amend the
Bidding process and reject all Biddings at any time prior to the award of the
Contract without thereby incurring any liability to the affected Bidder(s), and
KARI is not under any obligation to inform the affected Bidder(s) of the ground
for its action.
1.8. Selection of Successful Bidder
The Successful Bidder will be selected by the evaluation committee among the
Bidders subject to the evaluation of the Proposals.
1.9. Contract
The Contract period for the Development and Procurement of the RF Power
amplifiers Set for Large EMC Test Facilities will be from EDC to the installation
and Site Acceptance.
The Terms and Conditions as presented in Chapter IV. of this RFP is the
baseline requirement for the Contract negotiation, and will be the basis of the
Contract.
1.10. Language and Measurement Unit
The Proposal and any documents submitted to KARI under this RFP and
communication and the Contract language shall be in English or Korean.
"Système Internationale" (SI, hereafter) units shall be used for measurements
and quantities in the Proposal and all the accompanying documents.
1.11. Pricing Requirements
Any price or rate proposed by Bidder shall be firm and fixed, not subject to
change for a price escalation for the entire period of the Contract.
Any kinds of taxes and duties arising in connection with Bidder’s work under this
RFP and under the eventual Contract shall be Bidder’s responsibility, except for
the customs duties levied in Korea.
The price shall be inclusive of any cost or charge incurred due to delivery of any
equipment, hardware, software or documentation to KARI or its designated
point of delivery.
RFP.SITC.KARI.KOREA
2016.05
31
Space Test Dept.
1.12. Certificate and Government Approvals
Bidders shall receive the government approval and certificates (e.g. E/L) in
relevant countries, necessary for Bidder's work for the Development and
Procurement of the RF Power amplifiers Set. Bidder's ability and plan to get
such approval and certificates shall be submitted to KARI, together with any
appropriate assurance letters from the relevant governments, in the proposal.
1.13. Confidentiality
There shall be no news releases, public announcements, denials or
confirmation in connection with this RFP or Contract award without the prior
written approval of KARI.
All documentation submitted in response to this RFP shall be marked
"COMMERCIALS-IN-CONFIDENCE" on the first page of each document. All
elements of the RFP shall be kept confidential, and shall not be intentionally
disclosed by Bidder to the third parties.
1.14. Withdrawal of Proposal
Bidder may withdraw its Proposal at any time before the Bid Closing Date.
Withdrawal shall be made in writing, and shall be received by KARI before the
Bid Closing Date.
1.15. Property of Proposal
All documents submitted in response to this RFP shall become the property of
KARI and will be retained by KARI.
1.16. Expenses
Expenses incurred by Bidders in connection with the preparation, submittal, and
any subsequent clarification or negotiation activities are for their own account
and will not be reimbursed by KARI.
1.17. Governing Law
This RFP and the Contract shall be construed in accordance with and governed
by the laws of the Republic of Korea.
1.18. Arbitration
Any disputes in relation to, and under the RFP and the Contract shall be
RFP.SITC.KARI.KOREA
2016.05
32
Space Test Dept.
resolved through arbitration in Seoul, Korea, under the Rules of the Korean
Commercial Arbitration Board.
RFP.SITC.KARI.KOREA
2016.05
33
Space Test Dept.
IV. General Terms and Conditions
Preamble
This Contract is made on , 2016 by and between Korea Aerospace
Research Institute (“KARI”) established under the law of the Republic of Korea
with its principal office at 169-84 Gwahakro, Yuseong-gu, Daejeon 34133 Korea,
and (“Contractor”) established under the law of with its principal
office at .
Witnesseth
WHEREAS, KARI has a satellite assembly, integration and test center
(hereinafter referred to as ‘AITC’) for the purpose of the effective development
of domestic satellites;
WHEREAS, KARI plans to install RF power amplifier systems, remote control
panel, relating cable lines and bi-directional couplers in amplifier room of the
Large EMC chamber; and
WHEREAS, Contractor has first-hand experience of this field and is willing to
developing, supplying and installing the RF Power amplifiers Set to KARI.
NOW THEREFORE, in consideration of the premises and the mutual covenants
hereinafter contained, KARI and Contractor have agreed as follows:
RFP.SITC.KARI.KOREA
2016.05
34
Space Test Dept.
Article 1. Definition
In this Contract, the following words and phrases shall have the meanings as
indicated below, unless the context wherein they are used clearly indicates
another meaning:
1.1 Associates mean all individual or legal entities organized under public or
private law, who shall act, directly or indirectly, on behalf of KARI or
Contractor, or at the direction of either Party to this Contract to fulfill the
obligations undertaken by such Party in this Contract, including, without
limitation, the employees of each Party, their suppliers and
Subcontractors.
1.2
AITC means satellite assembly, integration and test center in KARI.
1.3
Contract means this Contract for the delievery of the RF Power
amplifiers Set, including Appendices as attached hereto, and all
amendments that may be subsequently agreed to by the Parties in
accordance with the terms and conditions of this Contract.
1.4
Contractor means .
1.5
Contract Price means the amount of Contract. If there is any change in
Contract Price due to any reason, then the Contract Price means current
total amount of Contract.
1.6
Deliverable Data means any technical data as enlisted in Appendix B-1
“Statement of Work” that Contractor shall deliver to KARI and any
related data thereof under this Contract.
1.7
Deliverable (Delivery) Item(s) means the RF Power amplifiers Set, and
information as enlisted in Appendix B-1 “Statement of Work” that
Contractor shall deliver to KARI.
1.8
EDC means the Effective Date of this Contract.
RFP.SITC.KARI.KOREA
2016.05
35
Space Test Dept.
1.9
EMC means is the branch of electrical engineering concerned with the
unintentional genearion, propagation and reception of electromagnetic
energy which may cause unwanted effects such as electromagnetic
interference or even physical damage in operational equipment.
1.10
Event(s) of Force Majeure means any act of God, war, whether or not
declared, act or failure to act of any government in its sovereign capacity,
fire, earthquake, flood, epidemic, quarantine, nuclear incident, or any
other act beyond the reasonable control and without the fault of either
Party or its Subcontractors.
1.11
Factory Acceptance means KARI’s pre-shipment inspection or audit
including the testing activities for Deliverable Item at Contractor’s facility.
1.12
KARI means Korea Aerospace Research Institute.
1.13
Party or Parties means KARI or Contractor, or both, according to the
context.
1.14
Site Acceptance means final acceptance by KARI of the Deliverable
Item at KARI site in accordance with Article 13 “ Inspection and Site
Acceptance”.
1.15
Subcontract means any subcontract, including purchase orders and all
similar forms of agreements at any tier under this Contract.
1.16
Subcontractor means a contractor under any Subcontract including
suppliers and vendor.
1.17
Third Party(ies) means any individual or legal entity other than the
Associates and the Parties.
1.18
Work(s) means whole or any part of the work, but not limited to review
meeting, delivery, installation, test, training, warranty and maintenance,
to be executed by a Contractor in accordance with this Contract.
RFP.SITC.KARI.KOREA
2016.05
36
Space Test Dept.
Article 2. Objective
2.1
The objective of this Contract is to procure the qualified the RF Power
amplifiers Set through the effort of the Contractor. To accomplish this
objective, Contractor shall perform all the Works under this Contract
required for design, manufacture, qualification, test, installation, training,
warranty and maintenance as well as the delivery of Deliverable Item to
meet the requirements and specification of this Contract.
Article 3. Contract Documents
3.1
This Contract shall comprise the following documents, as amended from
time to time by written agreement by and between both Parties:
[A] Terms and Conditions
[B] Appendices
B-1. Statement of Work
B-2. Performance test report
3.2
In the event of any inconsistency or discrepancy between or among the
Contract documents as listed in Article 3.1 above, the Contract
documents shall be applied in the decreasing order (from [A] to B-2) of
precedence.
3.3
In the event of any dispute or difference between the Parties in the
interpretation of this Contract as a result of the application of the
Appendices as specified in Article 3.1, Contractor's Proposal dated
____________ submitted to KARI in anticipation of this Contract in
response to KARI's Request for Proposal dated ____________ shall be
used as a reference document to identify and clarify the intention and
understanding of the Parties as contemplated in this Contract, and both
Parties shall in good faith seek an agreement or a compromise
acceptable to both Parties without modification or amendment to this
Contract.
RFP.SITC.KARI.KOREA
2016.05
37
Space Test Dept.
Article 4. Responsibilities of the Parties
4.1
Responsibilities of KARI
4.1.1 KARI shall make a payment to Contractor in accordance with Article 6
“Terms of Payment”.
4.1.2 In accordance with Appendix B-1 “Statement of Work”, KARI shall
provide any reasonable support including facilities, equipment and
information in order for Contractor to fulfill the installation of the RF
Power amplifiers Set at KARI site.
4.1.3 KARI shall provide reasonable cooperation and support in order for
Contractor to obtain any government approval.
4.2
Responsibilities of Contractor
4.2.1 Contractor shall have all responsibilities for the development, delivery
and installation of the RF Power amplifiers Set to KARI in a timely
manner as required and defined under this Contract without any charges
to KARI.
4.2.2 Contractor shall provide all Work including the installation, training,
warranty and maintenance and technical support required and stated
under this Contract to KARI.
4.2.3 Contractor shall obtain any government approval including the export
license to provide KARI with the RF Power amplifiers Set.
Article 5. Contract Price
5.1
For the full, satisfactory and timely performance of the Work by the
Contractor in accordance with the provisions of the Contract, KARI
hereby agrees to pay to the Contractor Euros/USD (TBD), in
accordance with the terms of payment as stipulated in Article 6 “Terms
RFP.SITC.KARI.KOREA
2016.05
38
Space Test Dept.
of Payment”.
5.2
The Contract Price as specified in Article 5.1 above shall be firm and
fixed price that is not subject to any escalation or to any adjustment or
revision by reason of the increase of actual costs incurred by Contractor
in the performance of the Work under this Contract, unless otherwise
agreed to by both Parties under Article 21 “Changes”.
5.3
The Contract Price as specified in Article 5.1 above shall be comprised
of the following items.
Items
Qty
Price (€/USD)
PWR AMP1 (150W, 4k~400M) with coupler
1
PWR AMP2 (5000W, 10k~200M) with coupler
1
PWR AMP3 (1200W, 200M~1G) with coupler
1
PWR AMP4 (250W, 1G~2.5G) with coupler
1
PWR AMP5 (250W, 2G~8G) with coupler
1
PWR AMP6 (250W, 8G~18G) with coupler
1
Total
6
5.4
All banking charges incurred in Korea shall be borne by KARI and
those charges incurred outside Korea shall be borne by Contractor.
Article 6. Terms of Payment
6.1 Payment Schedule
6.1.1
Payment shall be executed after the establishment of performance
bond in accordance with Article 7 “Performance Bond”.
6.1.2
KARI shall pay to Contractor the Contract Price as stipulated in Article
5.1 in accordance with the following schedule:
No. Payment milestone
Payment due
Payment
Percentage of
RFP.SITC.KARI.KOREA
2016.05
39
Space Test Dept.
(in Month)
date
(USD/€)
Contract Price
(%)
1
EDC
EDC+ 1M
2
DR (EDC+ M)
EDC+ M
3
TRR (EDC+ M)
EDC+ M
4
FAR (EDC+ M)
EDC+ M
5
SAR (EDC+ M)
EDC+ M
Total
100 %
* “EDC” means the Effective Date of this Contract in accordance with Article
23.1 “Effective Date of Contract”.
* “DR” means the Design Review.
* “TRR” means the Test Readiness Review at Contractor site.
* “FAR” means the Factory Acceptance Review at Contractor site.
* “SAR” means the Site Acceptance Review at KARI site.
6.2
Billing Procedure
6.2.1
All invoices Contractor submits for payment shall be in duplicate
signed by an authorized company official and received by KARI at
least thirty (30) days before the payment due dates as specified in
Article 6.1.
6.2.2
All payments shall be made in US dollars/Euros by telegraphic transfer
to the bank account as designated by Contractor in its invoices, by the
payment due dates as stipulated in Article 6.1, but or not later than
thirty (30) days after KARI's receipt of Contractor's invoices whichever
becomes later.
6.3
Suspension of Payment
6.3.1
Notwithstanding any provisions of this Contract, if any payment
milestone as set forth in Article 6.1.2 has not been accomplished for
any reasons attributable to Contractor, KARI may, with an advance
notice, suspend all payments due until both Parties agree that the
delayed payment milestone has been accomplished.
RFP.SITC.KARI.KOREA
2016.05
40
Space Test Dept.
6.3.2
In the event of KARI's suspension of payment under Article 6.3,
Contractor shall nevertheless continue to perform its obligations under
this Contract regardless of whether KARI is entitled to suspend the
payment.
6.4
Deduction of Payment
6.4.1
All losses, costs, charges, damages and expenses which KARI incurs
or sustains by reason of any act, default or omission of the Contractor
in the performance of the Contract and any other amounts which KARI
is entitled to receive from the Contractor may be deducted from any
payment that may be or become due to the Contractor from KARI.
6.4.2
A prior written notice given by KARI accompanied with documents
stating the amount due to KARI referred to in Article 6.4.1 and the
reason of deduction shall be prima facie evidence of the matters stated
herein.
Article 7. Performance Bond
7.1
Contractor shall establish a performance bond within three (3) weeks
after EDC in favor of KARI in the value of ten percent (10 %) of the
Contract Price, in the form of an irrevocable and unconditional
standby letter of credit available by KARI’s draft at sight.
7.2
The entire amount covered by the performance bond shall be payable
to KARI on demand together with KARI’s written statement to the
effect;
(a) that there was a default of the Contractor in the performance of the
Contract (including Subcontractor’s default under the Subcontract),
or
(b) that any amount KARI is entitled to receive from Contractor has not
been paid by Contractor to KARI through any other means, or
(c) that the performance of the Delivery Item accepted by KARI
pursuant to the Article 13 “Inspection and Site Acceptance” falls
RFP.SITC.KARI.KOREA
2016.05
41
Space Test Dept.
below the warranted level specified by the Contract and as far as
no remedy is brought by Contractor, or
(d) that this Contract was terminated by Contractor’s breach as
specified in Article 19.2.
Whenever any amount has been withdrawn by KARI due to such cases
of (a), (b) and (c) as above, performance bond shall be replenished.
7.3
The letter of credit shall be issued by the Seoul Guarantee Insurance
Company in the form of a surety bond or by first class international
bank acceptable to KARI. The letter of credit shall be drawn in favor of
KARI and advised through the Woori Bank (Daejeon Branch at 29
Munye-ro, Seo-gu, Daejeon, 35241 Korea, Tel: +82-42-488-9704, (Ext.
312)/ Fax: +82-505-003-0759) and shall remain valid until the end of
warranty expiration. The letter of credit shall not be amended, modified
or canceled without KARI's prior written consent.
7.4
It is hereby agreed between the Parties that payment from the
Performance Bond under this Article 7 shall not affect any other KARI's
rights, privileges, interests or remedies under this Contract or the
applicable law.
Article 8. Deliveries
8.1
General
8.1.1
Contractor shall deliver Deliverable Item in accordance with the
defined schedule and method as set forth in Appendix B-1 “Statement
of Work”.
8.1.2
Contractor agrees that delivery or provision of time and place under
this Contract, whether specifically provided for or not, or in subsequent
amendments thereto, are of the essence of this Contract.
8.1.3
Contractor shall be responsible for all applicable taxes imposed
outside Korea including any customs duties and charges of any nature
RFP.SITC.KARI.KOREA
2016.05
42
Space Test Dept.
levied on Deliverable Item, spare parts, spare materials, tools,
consumables and ancillary equipment as well as any charges
associated with the transportation.
8.2
Delivery to KARI
8.2.1
Contractor shall deliver Deliverable Item under the rule of FCA TBD
airport (Free Carrier in accordance with the Incoterms 2010) in
accordance with the delivery schedule of this Contract.
8.2.2
To obtain import certification, Contractor shall notify KARI by e-mail
(address is “jjw0302@kari.re.kr” for Mr. Jae-woong JANG and
“jncho@kari.re.kr” for Mr. Jung-Nam CHO) fourteen (14) calendar days
prior to each shipment with one set of proforma invoice and packing
list specifying the number of boxes, name of Items, unit price, and size
and volume of each container or box to be shipped. As soon as each
shipment as provided for in this Article is made, Contractor shall send
one (1) copy of the following shipping documents to KARI by e-mail;
(a) Clean on board vessel bill of lading/or airway bill of lading,
(b) Commercial invoice,
(c) Packing list,
(d) Weight and measurement list,
(e) Manufacturer's Inspection Report,
(f) Certificate of Origin (if possible), and
(g) Export License (if any).
Article 9. Delay
9.1
Excusable Delay
9.1.1
Neither Party shall be responsible to the other Party for any delay in
performing its obligations under this Contract due to any Events of
Force Majeure.
9.1.2
The Party whose performance of obligations hereunder has been
RFP.SITC.KARI.KOREA
2016.05
43
Space Test Dept.
affected by any Events of Force Majeure shall notify the other Party
within ten (10) days thereafter by sending a detailed statement and
sufficient evidence with respect thereto, and promptly of any
subsequent change in the circumstances, if any. The affected Party
shall exercise its best efforts under the circumstances to remove or
remedy the Events of Force Majeure and the effects thereof and
resume full performance hereof as soon as possible.
9.1.3
Notwithstanding Article 9.1.1 hereof, any such delay that has not been
notified to the other Party or any delay of performance of the affected
Party falling due after delay, failure or incompleteness in exercising the
pertinent best efforts to remove or remedy the pertinent Events of
Force Majeure or the effects thereof pursuant to Article 9.1.2 hereof
shall not be excused for any reason whatsoever.
9.1.4
The Party who has received or is entitled to duly receive the notice of
Events of Force Majeure under Article 9.1.2 hereof may suspend
performance of its obligations which shall be due subsequent to such
Events of Force Majeure, until the other Party has effected such
delayed performance to the full extent after and in view of such Events
of Force Majeure.
9.2
Non-Excusable Delay
9.2.1
In the event that, unless otherwise excused by virtue of this Contract,
any reason attributable to KARI or the governing or applicable law,
Contactor delays the provision or delivery of Deliverable Items as
stipulated under this Contract, Contractor shall pay for damages as
defined in the Article 9.2.2 to KARI as a result of such delay.
9.2.2
Contractor acknowledges and agrees that the timely provision or
delivery of the Deliverable Item as stipulated under this Contract or its
performance of other obligations under this Contract is essential to
KARI, and that such delay as provided for in Article 9.2.1 hereof may
cause substantial financial loss or damage to KARI’s rights, interests,
privileges and benefits, which may not be assessable or recoverable.
RFP.SITC.KARI.KOREA
2016.05
44
Space Test Dept.
Both Parties therefore specifically agree that in the event of such loss
or damage caused by delay attributable to Contractor, its
Subcontractor or any of its agents, Contractor shall pay KARI as
liquidated damages zero point one five percent (0.15%) of Contract
Price per day of such delay. In no case, however, shall the aggregated
liquidated damages exceed ten percent (10%) of Contract Price. It is
also agreed by both Parties that KARI shall be entitled to terminate this
Contract for Contractor’s breach, only if the aggregated liquidated
damages under this Article, excluding those days of delay excused by
KARI in writing, exceeds ten percent (10%) of the Contract Price.
9.2.3
This Article shall not affect other remedies, rights, privileges, interests,
benefits of KARI under this Contract or the governing or applicable law.
Contractor agrees that any right of KARI under this Article is not an
alternative or substitute to other remedies, rights, privileges, or
interests of KARI, and that Contractor’s correction of such defect or
non-conformity under this Article does not relieve Contractor from any
liability to KARI which may arise under this Contract of the governing
or applicable law as a result of such defect or non-conformity.
9.2.4
For the purpose of this Article, any action or omission of Contractor’s
Subcontractor, agent, or servant, de facto or de jure, shall be deemed
to be Contractor’s own.
Article 10. Taxes and Duties
10.1
In the event taxes are charged in Korea, KARI shall be fully
responsible for payment of such taxes. Contractor shall be fully
responsible for the payment of all applicable taxes imposed outside
Korea including any customs duties and charges.
10.2
Neither Party shall be responsible for paying the customs duties, and
related taxes, fees, or charges for the personnel and the personal
belongings of the other Party.
RFP.SITC.KARI.KOREA
2016.05
45
Space Test Dept.
10.3
The Contractor shall further comply with instructions KARI may issue
from time to time in order to facilitate any exemptions or reductions
from customs duties and other taxes that might be levied on KARI and
shall impose the same obligations on its Subcontractors.
Article 11. Intellectual Property
11.1
KARI shall own and have a right to use, without any obligation, all the
Deliverable Items provided by Contractor in its performing this Contract.
Contractor shall take all necessary precautions so that all the
Deliverable Items supplied hereunder shall be free from infringement
of any patent, design patent, trademark, utility model or any other
industrial property right, copyright, license or any other right thereunder
of any Third Party.
11.2 In the event that any Party other than Contractor claims or threatens to
claim infringement by KARI with respect to such use of the Deliverable
Items, Contractor shall defend, hold harmless, and indemnify KARI from
such infringement claims.
11.3 This Article will survive the completion of the Contract, any termination,
cancellation or expiration of the Contract in any manner whatsoever.
Article 12. Factory Acceptance
12.1
The Factory Acceptance of the RF Power amplifiers Set shall occur only
after:
(a) all specified tests to be performed by the Contractor under the
Contract for the RF Power amplifiers Set have been completed in
accordance with the Contract; and
(b) the Contractor has demonstrated to KARI that the RF Power
amplifiers Set meet the specifications and requirements in this
Contract; and
RFP.SITC.KARI.KOREA
2016.05
46
Space Test Dept.
(c) all Works and conditions under the Contract to be fulfilled by the
Contractor prior to the shipment of the RF Power amplifiers Set
have been met,
in which case KARI shall accept, in writing, the RF Power amplifiers Set subject
to the provisions set forth below.
12.2
Subject to the conditions as set forth in Article 12.1 above, a Factory
Acceptance of the RF Power amplifiers Set shall be occurred in
accordance with Appendix B-1 “Statement of Work”. If KARI
determines that the RF Power amplifiers Set is unacceptable, it shall
notify the Contractor, in writing, the reasons therefore.
12.3
If the RF Power amplifiers Set is determined to be unacceptable,
Contractor shall, at its expense, promptly repair or replace the RF
Power amplifiers Set so that it shall comply with the Contract
specifications and requirements, and Contractor shall hold the
additional FAR of such repaired or replaced the RF Power amplifiers
Set for KARI’s confirmation. The Contractor shall present to KARI the
root cause and the result of such repair or replacement. Such repaired
or replaced the RF Power amplifiers Set shall be accepted in
accordance with the requirements of Article 12.1.
12.4
For the Factory Acceptance, KARI, at all times during the performance
of this Contract, shall have the right to do the following activities at the
Contractor’s facilities or other relevant facilities under this Contract;
(a) Access the Items, testing activities and data, related to, used for,
prepared or generated in connection with this Contract, and
(b) Witness all qualification and acceptance testing of the Deliverable
Items to be delivered or provided under this Contract including all
tests used for the purpose of demonstrating qualification.
12.5
Contractor shall make such data and documentation, equipment and
facilities available to KARI upon KARI’s request and KARI’s selection
for such purposes. Contractor shall deliver copies of design and test
RFP.SITC.KARI.KOREA
2016.05
47
Space Test Dept.
data and other technical data, excluding financial data, required to
evaluate technical problems or non-performance that may occur during
the performance of this Contract. Such documentation and data shall
also be available for KARI to make copies thereof.
Article 13. Inspection and Site Acceptance
13.1
KARI shall carry out inspection of the Deliverable Item within thirty
(30) days after delivery to KARI. In the event that KARI discovers that
any Deliverable Item provided or delivered pursuant to Article 8
“Deliveries” are defective or non-conformity during the inspection,
KARI shall promptly notify Contractor thereof and provided that such
defect or non-conformity is not attributable to KARI, Contractor shall
promptly remedy such defect or non-conformity and retest. In addition,
if remedying such defect or non-conformity would substantially delay
as compared to the period required to complete such substitution,
Contractor shall promptly provide substitute Items. Upon the remedy
of such defect or non-conformity that the requirements of this
Contract are satisfied in all respects or upon the provision of
substitute Items, Contractor shall notify KARI of the details of the
remedy undertaken by Contractor.
13.2
The Site Acceptance of the RF Power amplifiers Set shall occur only
after:
(a) the Contractor shall successfully install the RF Power amplifiers
Set at Large EMC Test Facilities in KARI; and
(b) the performance of the RF Power amplifiers Set after such
installation under the Contract shall meet the specifications and
requirements in this Contract; and
(c) all Works and conditions under the Contract to be fulfilled by the
Contractor have been met,
in which case KARI shall finally accept, in writing, the RF Power amplifiers Set
subject to the provisions set forth below.
RFP.SITC.KARI.KOREA
2016.05
48
Space Test Dept.
13.3
Subject to the conditions as set forth in Article 13.1 above, the Site
Acceptance of the RF Power amplifiers Set shall be occurred only
when the inspection has successfully completed at KARI site in
accordance with Appendix B-1 “Statement of Work”. After Site
Acceptance, KARI’s authorized representative shall notify the result of
Site Acceptance in writing. If KARI determines that the RF Power
amplifiers Set is unacceptable, it shall notify the Contractor, in writing,
the reasons therefore. If such written Site Acceptance letter is not
given to Contractor, within thirty (30) days after Site Acceptance of
Deliverable Item, the Deliverable Item shall be deemed to have been
accepted by KARI.
13.4
If the RF Power amplifiers Set is determined to be unacceptable, both
Parties shall jointly investigate the root cause and if the root cause is
attributable to the Deliverable Item, then it shall be considered as
non-delivery and Contractor shall, at its expense, promptly repair or
replace the RF Power amplifiers Set so that it shall comply with the
Contract specifications and requirements. Such repaired or replaced
Item shall be accepted in accordance with the requirements of Article
13.1 and 13.2.
13.5
The Parties agree that the acceptance of the Deliverable Item under
this Article shall not be interpreted or construed to mean that such
Item is free of all defects and conform in all respects with the
requirements of this Contract, and Contractor shall not be entitled to
any additional costs incurred or to recover any damages suffered due
to defects in the Item or KARI’s rejection of the Item.
Article 14. Spare Parts and Erection Tools
14.1
Contractor shall provide KARI with all list and delivery time of spare
parts/erection tools for KARI's use for consumable and five (5) years
of operation as per the Scope of supplies specified in Contract
Specifications.
RFP.SITC.KARI.KOREA
2016.05
49
Space Test Dept.
14.2
Contractor shall guarantee that spare parts/erection tools can be
made available for ten(10) years.
Article 15. Indemnification
15.1
Contractor shall indemnify and hold KARI, its officers, agents,
servants, employees, subsidiaries, successors, and assignees, or any
of them, harmless from any and all loss, damage, liability or expense
resulting from damage to all tangible property and injuries including
death, to all persons, in the circumstances caused by its act or
omission in the performance of the Work, and shall pay all expenses,
including reasonable attorneys’ fees, and satisfy all judgments as
may be incurred by or rendered against them, or any of them.
Article 16. Licenses, Clearances and Permits
16.1
Unless otherwise specified in this Contract, each Party is responsible
for obtaining all government approvals from any government authority
which has jurisdiction and authority to require such approvals,
including, but not limited to, licenses, visas, and permits necessary to
carry out such Party’s obligations in accordance with this Contract.
KARI is responsible for obtaining any necessary Korean government
approvals, and Contractor is responsible for all other government
approvals.
16.2
The Parties shall cooperate and provide each other, upon request of
and without cost to the other Party, all reasonable and necessary
assistance in obtaining any and all governmental approvals, which
they respectively are required to obtain pursuant to this Contract.
16.3
Each Party shall be solely responsible for any expenses incurred in
obtaining the approvals, which are required under this Article. The
Parties shall provide to each other, upon request of and without cost to
RFP.SITC.KARI.KOREA
2016.05
50
Space Test Dept.
the other Party, suitable documents or other reasonable evidence to
show that they have obtained any and all governmental approvals,
which they respectively are required to obtain pursuant to this Contract.
Article 17. Confidentiality
17.1
Each Party shall confidentially treat all documents, data, materials
and information supplied by one to the other, and shall not disclose
the above to any Third Party, and shall not use the above for any
other purpose than for the performance of this Contract without prior
written consent from the other Party. However, this Confidentiality
obligation shall not be apply to the information which is made
available to the general public.
Article 18. Warranty and Maintenance
18.1
Any patent, utility, design, copyright, technical know-how and any
other type of intellectual property used by Contractor, its
Subcontractors, servants, or agents, or delivered or provided to KARI
directly or indirectly in connection with this Contract shall be free of
any infringement actions by any Third Party claiming its rights or
interests with regard thereto in disposing with in accordance with this
Contract.
18.2
The Deliverable Item and its installation supplied and performed by
Contractor or its Subcontractors hereunder shall be in good working
order and free from all defects in workmanship and materials and
shall comply with the requirements of this Contract. Warranty period
for the Deliverable Item shall be one (1) year from the date of
successful Site Acceptance.
18.3
Upon the receipt of written notification from KARI that the Deliverable
Item delivered by Contractor or its Subcontractors is defective or non-
confirming, the Contractor shall repair or replace, at Contractor’s
RFP.SITC.KARI.KOREA
2016.05
51
Space Test Dept.
option and its own expense, such Deliverable Item so as to comply
with the above warranties.
18.4
The Contractor shall not be entitled to any additional costs (for
instance, the cost for the repair or replacement of faulty parts at its
option, the labor cost required for repair, traveling cost, per diem and
all associated necessary costs) incurred or to recover any damages
suffered due to defect in the Deliverable Item or rejection of the
Deliverable Item by KARI.
18.5
Contractor shall submit the written plan for repair within forty eight
(48) hours after the reception of KARI’s notification of fault and shall
completely finish the repair within thirty (30) days after the receipt of
KARI’s written notification of fault.
18.6
For an urgent service during any important test period using the RF
Power Amplfiers Set, The remedy of warranty is five (5) days from the
receipt of KARI’s written notification of service. To meet the deadline
of the urgent service, KARI will notify Contractor of the test start date
and the period two (2) weeks prior to the test start date. Contractor
shall stand by the A/S crews at Contractor's convenient place during
the test period (up to four (4) weeks). Contractor shall include a plan
for these requirements.
18.7
Both Parties acknowledge that the breach of a warranty may result in
serious damages to KARI’s right, interests, privileges, and benefits,
de facto or de jure, or loss of KARI’s profits. If a breach of warranty
has not been cured within thirty (30) days from the date of KARI’s
written notification to Contractor of such breach, Contractor shall pay
all the damages to KARI due to the breach of any warranty.
18.8
The right and remedies provided under this Article 18 are in addition
to any other rights or remedies available to KARI under the Contract
or applicable laws.
RFP.SITC.KARI.KOREA
2016.05
52
Space Test Dept.
Article 19. Termination
19.1
Termination for Events of Force Majeure
19.1.1
In the event that the excusable delay under Article 9 “Delay” exceeds
three (3) months for any single Events of Force Majeure or six (6)
months in the aggregate for all Events of Force Majeure, KARI, at its
sole discretion, may declare frustration of this Contract, and terminate
the whole or any part of this Contract by sending a three (3) days
prior notice to the Contractor.
19.1.2
In the event that the Contract is terminated for Events of Force
Majeure, Contractor shall be entitled to the payments received and
payments due as of the date of termination, in which case Contractor
shall return fifty percent (50%) of the amount paid by KARI under this
Contract. KARI shall return the Deliverable Items to Contractor. And,
Contractor shall return all of the KARI furnished items in its original
configuration.
19.2
Termination for Breach
19.2.1
KARI may, by written notice to the Contractor, terminate the whole or
any part of the Contract, if any of the following circumstances occurs;
(a) Contractor fails to deliver any Deliverable Item under Contract in
accordance with the delivery schedule; or
(b) Contractor fails to perform any Work under this Contract or fails to
progress with the Work in a manner which satisfies KARI that
Contractor will perform the Contract within the time specified and
in accordance with the terms of the Contract; or
(c) Contractor fails to remedy any or all defects and non-conformity
on the Deliverable Item in accordance with Article 13.
19.2.2
In the event of the circumstances in Article 19.2.1, KARI may notify
the Contractor and may suspend any further performance of its
obligation under this Contract. If the Contractor fails, within ten (10)
days from the dispatch of the notice, to produce and notify KARI of
RFP.SITC.KARI.KOREA
2016.05
53
Space Test Dept.
reasonable evidence of its intent and ability to effect due performance
of the obligation in breach within thirty (30) days from due dispatch of
written notice, then KARI may terminate this Contract with three (3)
days’ prior notice of termination.
19.2.3
In the event this Contract is terminated for Contractor’s breach, the
Contractor shall return all the amounts paid by KARI under the
Contract and also pay the termination charge of ten percent (10%) of
the total Contract Price. KARI shall return the Deliverable Item to
Contractor, if any.
19.3
Termination for Special Circumstances
19.3.1
Either Party may terminate this Contract anytime upon or after due
dispatch of notice of such effect, without any other conditions, in the
event that the other Party falls within any of the following categories:
(a) the other Party has fallen bankrupt or insolvent;
(b) the other Party passed a resolution for its reorganization
(bankruptcy related), dissolution, liquidation or winding-up; or
(c) a court order for proceedings for the bankruptcy, reorganization
(bankruptcy related), dissolution or winding-up of the other Party
has been applied for by any person and such application has not
been dismissed within sixty (60) days.
19.3.2
In the event this Contract is terminated by Article 19.3.1 above, each
Party shall effect the restitution to the other Party of whatever is
provided, delivered, or paid to it in the same manner and types as
such provision, delivery or payment was made.
19.4
Termination for Convenience
19.4.1
KARI may terminate this Contract, in whole or in part, for its
convenience, with thirty (30) days’ prior written notice to Contractor.
In case of such termination for convenience, Contractor is entitled to
receive payment due which Contractor has already done in
RFP.SITC.KARI.KOREA
2016.05
54
Space Test Dept.
accordance with Article 6.1.2 within thirty (30) days from the date of
termination and KARI shall release performance bond at the same
time.
Article 20. Resolution of Disputes and Governing Law
20.1
In cases any controversy or claim arises out of or in relation to this
Contract or with respect to a breach hereof, the Parties shall seek to
resolve the matter amicably through discussions between themselves.
In the event of any disagreement between KARI and Contractor about
the interpretation of the provisions or definitions used in this Contract,
the interpretation of KARI shall govern until and unless otherwise
decided by arbitration conducted pursuant to the following provisions.
20.2
If the Parties cannot resolve such controversy or claim in accordance
with Article 20.1 above, it shall be finally settled by arbitration in Seoul,
Korea, before the Korean Commercial Arbitration Board in
accordance with its rules. The proceedings shall be conducted in
English. The award rendered by the board shall be final and binding
on the Parties and may be entered in any court of competent
jurisdiction for execution.
20.3
The validity, performance, construction, and effect of this Contract
shall be governed by the laws of Korea.
Article 21. Changes
21.1
Changes Requested by KARI
21.1.1
Any changes requested by KARI during the performance of this
Contract, within the general scope of this Contract, which would add
or delete Work, affect the design of Work, change the method of
shipment or packing, place or time of delivery, duration of Contract, or
would affect any other requirement of this Contract, shall be
RFP.SITC.KARI.KOREA
2016.05
55
Space Test Dept.
submitted in writing to Contractor. Contractor shall respond to any
changes KARI requested in writing within thirty (30) days after receipt
of such request. If such change requested by KARI causes an
increase or decrease in the Contract Price and/or an impact of
schedule, Contractor shall submit to KARI at the time the response to
the requested change is submitted, the details of such increase or
decrease.
21.1.2
KARI shall notify Contractor in writing, within thirty (30) days after
receipt of Contractor’s response, whether it agrees with and accepts
Contractor’s response. If KARI agrees with and accepts Contractor’s
response, an amendment to the Contract reflecting such change,
Contract Price and/or schedule adjustment, if any, shall be issued,
and Contractor shall proceed with the performance of the Contract as
changed. Contractor shall provide updated information that reflects
the final agreed price of the change, if KARI requests. In the event the
Parties are unable to agree on a change requested by KARI or price
adjustment, if any, or both, Contractor shall proceed with the
performance of the Contract as unchanged.
21.2
Changes Requested by Contractor
21.2.1
Any changes requested by Contractor during the performance of this
Contract, within the general scope of this Contract, that would add or
delete Work, affect the design of Work, change the method of
shipment or packing, place or time of delivery, duration of Contract, or
would affect any other requirement of this Contract, shall be
submitted in writing to KARI thirty (30) days prior to the proposed date
of the change. If such change requested by Contractor causes an
increase or decrease in the Contract Price, Contractor shall submit to
KARI at the time the requested change is submitted, the details of
such increase or decrease.
21.2.2
KARI shall notify Contractor in writing within thirty (30) days after
receipt of the requested change and Contract Price adjustment, if any,
whether or not it agrees with and accepts such change. If KARI
RFP.SITC.KARI.KOREA
2016.05
56
Space Test Dept.
agrees with and accepts change requested by Contractor, an
amendment to the Contract reflecting such change, and Contract
Price adjustment, if any, shall be issued, and Contractor shall
proceed with the performance of the Contract as changed. Contractor
shall provide updated information which reflects the final agreed price
of the change, if KARI requests. In the event the Parties are unable to
reach an agreement on a change requested by Contractor, or
Contract Price adjustment, if any, or both, Contractor shall proceed
with the performance of the Contract as unchanged.
Article 22. Notices
22.1
All notices, requests, demands, approvals, reports, invoices, and
other correspondence to be provided pursuant to this Contract shall
be in writing and shall be deemed to have been duly given to the
Party to be notified: (i) on the date of delivery if delivered in person,
(ii) on the date of dispatch if by facsimile, telex or e-mail, or (iii) on the
date of receipt if by registered airmail or overnight courier.
All notices shall be addressed to the appropriate Party at its address as follows:
For KARI: Korea Aerospace Research Institute
169-84 Gwahangno, Yuseong-gu, Daejeon 34133, Korea
Commercial matters
Technical matters
Mr. Jung-Nam CHO
Tel: +82-42-860-2613
Fax:+82-42-860-2666
E-mail: jncho@kari.re.kr
Mr. Jae-Woong JANG
Tel: +82-42-860-2977
Fax:+82-42-860-2234
E-mail:
jjw0302@kari.re.kr
For Contractor: [Company]
[Address]
RFP.SITC.KARI.KOREA
2016.05
57
Space Test Dept.
Commercial matters
Technical matters
[Name]
Tel: +
Fax: +
E-mail:
[Name]
Tel: +
Fax: +
E-mail:
22.2
Each Party may change its address for notice by notice given to the
other Party in the manner set forth above. And any notices given as
provided herein shall be considered effective seven (7) days after the
registered postage pre-paid airmailing thereof or the day of actual
receipt thereof, whichever occurs first, or on the day of personal
delivery, or the day of sending if by facsimile, telex or e-mail.
Article 23. Miscellaneous
23.1
Effective Date of the Contract
The effective date of this Contract ("EDC") is the date on which the
duly authorized representatives of both Parties have signed this
Contract, and any amendment to this Contract shall be effective only
upon signature by the authorized representatives of both Parties.
23.2
Entire Agreement
This Contract embodies the entire agreements of the Parties with
respect to the subject matter hereof and supersedes and cancels any
and all prior understandings or agreements, oral or written, in relation
hereto, which may exist between the Parties. No oral explanation or
oral information by any of the Parties shall alter the meaning or
interpretation of this Contract.
23.3
Assignability
RFP.SITC.KARI.KOREA
2016.05
58
Space Test Dept.
This Contract and each and every covenant, term and condition hereof
shall be binding upon and inure to the benefit of the Parties and their
respective successors, and neither this Contract nor any rights and
obligations hereunder shall be assignable or delegable directly or
indirectly by either Party without the prior written consent of the other
Party.
23.4
Unenforceable Terms
If any term or provision of this Contract shall for any reason be invalid,
illegal or unenforceable in any respect, this Contract shall be
interpreted and construed as if such term or provision had never been
included herein.
23.5
Non-waiver
The failure or delay of any Party to require performance by the other
Party of any provision of, or of any right or obligation under this
Contract, shall not constitute a waiver thereof, nor shall such affect that
Party’s right to thereafter require performance of such or any other
provision, right or obligation.
23.6
Disclaimer of Agency
This Contract shall not be deemed to constitute any Party to become
the agent of the other Party.
23.7
Headings
The headings in this Contract have been inserted for convenience of
reference only and are not to be used in consulting or interpreting this
Contract.
23.8
Language and Unit
RFP.SITC.KARI.KOREA
2016.05
59
Space Test Dept.
All documents, drawings, plans and other writings as well as
communications between both Parties under this Contract shall be in
English and measurements and quantities for Deliverable Data shall
be recorded in units of Système Internationale.
23.9
Time Limits
Unless otherwise indicated, any time limits to which this Contract binds
Contractor or KARI shall be counted in calendar days from the day
following that of the event marking the start of the time limit, and shall
end on the last day of the period specified. When the last day of a time
limit is a Saturday or Sunday, or a legal holiday in the country in which
the particular contractual performance is required, such time limit shall
be extended to the first working day following.
23.10 Subcontractors
Each Party shall be fully responsible for the work of its Subcontractors
under this Contract, and such subcontracting shall not relieve that
Party of its obligation under this Contract.
RFP.SITC.KARI.KOREA
2016.05
60
Space Test Dept.
Appendix B-2. Performance test report (example)
(This sheet can be modified fitably by supplier.)
Model : Serial No. :
Test conditions :
Network :
V
Hz
Temperature :
°C
Input-VSWR<2:1
□
Instrument Safety
□
Input Overload +10dBm max. □
Remote control interface
□
IEEE interface
□
RS 232 interface
□
Gain / Output Power / Spurious Measurement Sheet
Frequency Pin
Pout
Harmonics
Spurious Gain
Monitor output
(MHz)
dBm
dBm
2nd(dBc) 3rd(dBc)
dBc
dB
dB
dB