KARI’s General Terms & Conditions 

 
 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Contract No. KARI-15-XXXX 

 

 

 

 

 

 
 

Between 

Korea Aerospace Research Institute 

and 

XXXX 

 

 
 
 
 


background image

        KARI / ABC Company                                                                                                      KARI    Proprietary 
 

 

 
Korea Aerospace Research Institute
 

 
 

 

 

General Terms and Conditions 

 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

 


background image

KARI / ABC Company                                                                                                                  KARI    Proprietary 
 

 
Korea Aerospace Research Institute                                  
2   
 
 

Table of Contents 

   

 

 
 
“Preamble” and “Whereas” Clause 
 
Article              Title                                                                                                                      Page 
Article 1.      Definitions ........................................................................................ 4 

Article 2.      Contract Price and Payment Term ........................................................... 5 

Article 3.      Delivery ........................................................................................... 5 

Article 4.      Extension of Delivery .......................................................................... 6 

Article 5.      Vessel Arrangement ............................................................................. 6 

Article 6.      Packing and Marking .......................................................................... 6 

Article 7. 

    Inspection and Acceptance.................................................................... 7 

Article 8.      Performance Guarantee ........................................................................ 8 

Article 9.      Warranties ......................................................................................... 8 

Article 10.    Performance & Warranty Bond .............................................................. 9 

Article 11.    Liquidated Damages for Late Shipment ................................................... 9 

Article 12.    Sub-Contracting ............................................................................... 10 

Article 13.    Permits .......................................................................................... 10 

Article 14.    Confidentiality ................................................................................. 10 

Article 15.    Indust ri al and/or  Int ell ectual Propert y R i ght s  .................................. 10 

Article 16.    Language........................................................................................ 11 

Article 17.    Taxation ......................................................................................... 11 

Article 18.    Title and Lien .................................................................................. 11 

Article 19.    Notice............................................................................................ 11 

Article 20.    Assignment ..................................................................................... 12 

Article 21.    No Waiver ...................................................................................... 12 

Article 22.    Force Majeure ................................................................................. 12 

Article 23.    Severability and Enforceability ............................................................ 12 

Article 24.    Modification, Addition and Amendment ................................................. 13 

Article 25.    Independent Contractor ...................................................................... 13 

Article 26.    Governing Law and Arbitration ............................................................ 13 

Article 27.    Termination .................................................................................. 133 

Article 28.    Entire Agreement ............................................................................. 14 

Article 29.    Effective Date ................................................................................. 14 

 

Annexes 

Annex A.    Offer 


background image

KARI / ABC Company                                                                                                                  KARI    Proprietary 
 

 
Korea Aerospace Research Institute                                  
3   
 
 

 

 

 

 

 

This page is intentionally blanked. 

 

 

 

 

 

 

 

 

 

 

 


background image

KARI / ABC Company                                                                                                                  KARI    Proprietary 
 

 
Korea Aerospace Research Institute                                  
4   
 
 

Preamble 

 
This Contract made on December xx, 2015 by and between Korea Aerospace Research 
Institute(“KARI”) established under the law of the Republic of Korea with its principal 
office  at  169-84  Gwahak-ro,  Yuseong-Gu,  Daejeon  34133  Korea,  and  XXXX 
(“Contractor”) established under the law of TBD. 

 

 

Witnesseth 

 

Whereas, KARI is desirous of acquiring Material defined hereinafter ; 
 
Whereas,  Contractor  has  a  knowledge  and  an  experience  in  the  development  and 
manufacturing of the Material ; 
 
Whereas, Contractor is willing to supply and deliver the Material to KARI ;   
 
Whereas,  KARI  desires  to  procure  and  Contractor  desires  to  supply  Material  in 
accordance with the terms and conditions provided for hereinafter set forth ; 
 
Now,  therefore,  in  consideration  of  the  premises  and  the  mutual  agreements  herein 
contained, the parties hereto have agreed to the following : 
 
 
Article 1.    Definitions 
 
In  this  Contract  where  the  context  so  admits  the  singular  includes  the  plural  and  vice  versa  and  the 
following terms shall be defined and construed as follows; 
 

1.1

 Material means all items to be supplied by Contractor to KARI pursuant to this Contract. 

 
1.2

  Contract means and includes all the terms, provisions, covenants and/or other conditions in this 

Contract and its attachments. 

 
1.3

  Supervision  means  the  supervising  services  to  be  rendered  by  Contractor  and/or  by  the 

supervisors for supervising in accordance with the Contract. 

 
1.4    Supervisor means the person authorized by Contractor to perform the supervision. 
 
1.5

  Contract  Specifications  means  any  and  all  specifications  and  its  addendum,  such  as  the 

Purchase  Specifications  and  the  Standard  Specifications  for  the  Material,  and  so  forth,  all  of 
which shall be incorporated into and made binding as an integral part of this Contract. 

 
1.6    Site means the area where the Material is to be erected, and located in the Republic of Korea. 
 
1.7

  MonthWeek, and Day mean calendar month, calendar week and calendar day according to the 

Gregorian calendar, respectively. 

 
1.8

  FCA means that Contractor fulfills his obligation to deliver when the goods handed over to 

KARI's Carrier or Forwarding Agent at the named place to be interpreted in accordance with the 
provisions of INCOTERMS, 2010

 
1.9  Final  Shipment  means  the  date  of  shipment  at  the  time  when  Contractor  has  shipped  the  final 

Material,  in  case  of  partial  shipment,  on  the  vessels/aircraft  at  the  port  or  airport  according  to 


background image

KARI / ABC Company                                                                                                                  KARI    Proprietary 
 

 
Korea Aerospace Research Institute                                  
5   
 
 

the Article 3 hereof, unless otherwise mutually agreed upon. 

 
1.10  Services  mean  technology  transfer,  technical  consulting,  Inspection/Acceptance,  Supervision, 

technical training and other services with regard to this contract. 

 
1.11 Technical Data means all data and information including, but not limited to, technical writings, 

sound  recordings,  computer  software,  pictorial  reproductions,  drawings,  and  any  other  data 
necessary for this contract. 

 
 
Article 2.    Contract Price and Payment Term 
 
2.1    The  Contract  price  for supply  of  the Services  and Material  shall be  the  sum  of  TBD as referred 

to Annex A. Offer which covers any and all costs for supply of the Material to the point of FCA 
Designated Place
 and also covers all the Scope of Supplies and Services rendered by Contractor 
specified in this Contract. 

 
2.2    The contract Price is a firm and fixed amount not subject to any escalation or to any adjustment 

or  revision  for  any  reason  whatsoever,  including  but  not  limited  to  the  increase  of  actual  cost 
incurred by Contractor in the performance of the Contract. 

 
2.3    The  payment  of  Contract  amount  specified  in  Article  2.1  shall  be  made  as  per  the  following 

payment schedule, unless otherwise agreed upon by the Parties; 

 

   

 

Milestone 

Amount 

 

TBD 

 

Total 

 

 

 
2.4    All  payment  shall  be  made  by  wire  transfer  to  the  bank  account  as  designated  by  Contractor  in  its 

invoices within thirty (30) calendar days from the date of the invoice. 

 
2.5    All  banking  charges  incurred  in  Korea  shall  be  borne  by  KARI,  and  those  charges  incurred 

outside Korea shall be borne by Contractor. 

 
2.6    The  Contractor  shall  submit  one  (1)  original  and  two  (2)  copies  of  the  invoice  to  KARI  and  each 

invoice  shall  clearly  indicate  the  Milestone  Event  related  to  the  respective  payment  and  shall 
accompany supporting document certifying the completion of the Milestone. 

 
 
Article 3.    Delivery 
 

3.1

  All  delivery  terms  used  in  this  Order  and  all  deliveries  made  are  to  be  in  accordance  with 

Incoterms 2010 

 
          Such delivery shall be based on : 
          (a) The Material shall be manufactured and tested. 
          (b)

 

The Material shall be witnessed or inspected by KARI as per Contract Article 7, Inspection 
and Acceptance. 

          (c) The Transshipment shall not be permitted. 
 


background image

KARI / ABC Company                                                                                                                  KARI    Proprietary 
 

 
Korea Aerospace Research Institute                                  
6   
 
 

3.2    Contractor shall advise KARI of preliminary delivery schedule and estimated 

measurement/weight information two(2) weeks prior to the delivery. 

 
3.3    Unless otherwise mutually agreed, Contractor shall make the Equipment ready for shipment and 

the Equipment shall be hand over to the KARI's Carrier or Forwarding 

 

Agent at the term of 

FCA Contractor’s facility by the Delivery Date of within September 30, 2016 after the 
contract as stated in the delivery schedule. 

 
3.4    The  date  of  each  clean  on  board  bill/or  airway  bill  of  lading  shall  be  construed  as  the  date  of 

each shipment and delivery date. 

 
3.5    As  soon  as  each  shipment  as  provided  for  in this  Article  is  made,  Contractor  shall  send  in care 

of ship's master two(2) copies each of the following shipping documents to KARI. 

 
          a. Clean on board bill of lading/or Airway bill of lading 
          b. Commercial invoice 
          c. Packing list 
          d. Manufacturer's Inspection Report 
          e. Quality Assurance Certificate 
 
 
Article 4.    Extension of Delivery 
 
KARI may have the right to extend the Delivery Schedule specified in Purchase Specifications of the 
Inquiry Documents for the period of maximum six(6) months, if necessary, at its sole discretion, with 
the  one(1)  month  prior  to  written  notice  of  extension  to  Contractor.  Contractor  shall,  during  the 
extension  period,  properly  protect  and  secure  the  Material  for  the  avoidance  of  loss  and  damage  on 
the Material. 
 
 
Article 5.    Vessel Arrangement 
 
5.1    The  necessary  space  booking  on  board  vessel  or  aircraft  for  shipping  the  Material  shall  be 

arranged  by  KARI,  provided  that,  if  requested  by  KARI,  Contractor  shall  assist  KARI  in  such 
arrangement of the space booking for the shipment of the Material with understanding of use of 
KARI's Carrier or Forwarding Agent. 

 
5.2  In  case  KARI  arranges  the  vessel  or  aircraft  by  itself,  KARI  shall  inform  Contractor  of  the 

vessel/aircraft  name  and  its  expected  date  of  arrival  at  and  departure  from  the  shipping  port/air 
port by written notice. 

 
5.3   In case the crane is needed for handling the Material at the time of loading, Contractor shall bear 

the charges for such crane for loading Material. 

 
 
Article 6.    Packing and Marking 
 
6.1  The  Material  shall  be  packed  in  seaworthy  packing  conditions  according  to  international 

commercial  and  industrial  practice.  Contractor  shall  apply  proper  anti-erosion  and/or  anti-rust 
compounds or coating, protective water proof wrapping and/or packing, as the case may be. 

 
6.2  Each  package  of  the  Material  delivered  by  Contractor  shall  be  marked  indicating  the  following 

information in sequence on the frame commensurate with the size of package, and which shall be 
painted with color to be designated by KARI prior to each shipment. 

         
             a. 


background image

KARI / ABC Company                                                                                                                  KARI    Proprietary 
 

 
Korea Aerospace Research Institute                                  
7   
 
 

 

 

 

 

 

 

b. Shipper's Mark 

c. Package Number 

d. Commodity Name 

e. Port of Discharge 

f. Caution Marks, if applicable 

g. Net weight, Gross weight and Cubic measurement 

h. Origin of Material 

i. Part Name and Operation Number 

 
6.3  Upon  consultation  by  the  Parties,  Contractor  shall  reimburse  KARI  for  any  and  all  expenses 

incurred by KARI as a result of improper and/or faulty packing or marking. 

 
6.4  Special  Packing  Requirements  for  Service/Spare  Parts  ;  Contractor  shall  make  separate  packing 

for service and spare parts from main Material. 

 
 
Article 7.    Inspection and Acceptance 
 
7.1    KARI  shall  have  the  right  to  carry  out  by  itself  or  to  appoint  another  qualified  inspector  for 

inspection of the Material and general progress during the manufacture, packing and preparation 
for shipment of the Material. 

 
7.2    In the event that KARI desires to dispatch its inspector or its authorized inspector for inspection 

of any or all Material, Contractor shall make due arrangement for free access of the inspector to 
Contractor's workshops or Sub-Contractor's workshops at reasonable time. Each party shall bear 
its own costs related to these inspections. 

 
7.3    KARI shall be entitled to refuse to accept Material partially or totally if the inspection or testing 

as  aforesaid  in  the  Article  7.1  reveals  that  the  Material  is  not  in  accordance  with  the  Contract 
Specifications  or  approved  detailed  descriptions,  drawings  and/or  technical  data  involved.  In 
such  case  Contractor  shall  repair,  replace  or  modify  free  of  charge  the  Material  in  question  to 
bring  it  into  conformity  with  the  Contract  Specifications  and  approved  detailed  descriptions, 
drawings and/or technical data, as aforesaid, and shall notify KARI when the same are ready for 
new  inspection or testing  which  shall be  carried out  under  the  same terms  and  conditions as  the 
original  inspection  and  testing.  In  this  case,  the  costs  incurred  by  KARI  due  to  such  a 
reinspection  including  but  not  limited  to,  travel  expenses  of  KARI's  inspector,  any  special 
reinspection costs  and  so  forth,  shall be borne by  Contractor.  Nevertheless,  the  failure  of  KARI 
to  detect  nonconformity  with  the  Contract  Specifications  or  detailed  descriptions,  drawings 
and/or technical data during any such inspections or testing shall not relieve Contractor of any of 
its obligations under this Contract. 

 
7.4  KARI shall make the inspection upon the Material at KARI's site at its expense with the presence 

of Supervisors or Contractor's Korean Agent according to the requirements of the Inspection and 

Korea 

Aerospace 

Research 

Institute 

(KARI CONTRACT NO:) 


background image

KARI / ABC Company                                                                                                                  KARI    Proprietary 
 

 
Korea Aerospace Research Institute                                  
8   
 
 

Acceptance Procedure in Standard Specifications. The detailed schedule of such inspection shall 
be mutually decided through mutual negotiation by the Parties. 

 
7.5    In  case of  missing/shortage  item  or  failure to  meet  guaranteed operating  specifications or  if the 

tests  reveal  defective  or  faulty  materials,  design  and/or  workmanship  attributable  to  Contractor 
and/or  its  Sub-Contractors, Contractor  shall, at  Contractor's cost including  airfreight, insurance, 
duties  and  taxies  for  customs  clearance  in  Korea,  promptly  make  all  necessary  redesign,  supply 
and/or  workmanship  required  to  remedy  such  faults  or  defects  in  order  to  assure  that  the 
specifications are conformable to the requirements set forth in Contract Specifications. Once the 
defects  have  been  corrected,  the  tests  shall  be  repeated  as  many  times  as  necessary  until  the 
design  specifications  as  aforesaid  are  into  conformity.  Costs  incurred  in  connection  with  any 
repeated tests, whether direct or indirect, shall be borne by Contractor. 

 
 
Article 8.    Performance Guarantee 
 
8.1  Contractor shall guarantee that the Services and Material shall have the performance confirming 

to  the  requirements  specified  in  the  Contract  Specifications.  Such  performance  shall  be  proved 
by  means  of  the  provisions  set  forth  in  Article  7.  hereof,  under  the  additional  condition  that 
KARI  shall  be  satisfied  with  all  documentation  provided  by  Contractor,  other  than  the  Contract 
Specifications,  and  that  performance  parameters  based  on  such  data  or  documentation  are 
established by testing and inspection. 

 
8.2  Contractor shall be released from this guarantee by the Final Acceptance from KARI. Contractor 

shall  provide  its  engineer  at  its  own  cost  to  rectify  all  the  defects  and/or  deficiencies  of  the 
Material,  if  any,  to  fulfill  the  requirements  of  Inspection  and  Acceptance  Procedure  in 
accordance with the requirements of the Contract Specifications, if and when such defects and/or 
deficiencies have been proven and admitted as not attributable to KARI. 

 
8.3      In  the  event  that  Contractor  does  not  commence  rectification  of  such  proven  and  admitted 

defects and/or deficiencies, or does not complete the said rectification with reasonable diligence, 
then  KARI  may  at  its  option  rectify  the  defects  and/or  deficiencies  at  Contractor's  expense.  In 
the  latter  case,  Contractor  shall  reimburse  KARI  for  all  costs  incurred  in  connection  with 
KARI's  rectification  of  the  defects  and/or  deficiencies  within  thirty  (30)  days  of  receipt  of 
KARI's written invoice setting forth such costs. 

 
 
Article 9.    Warranties 
 
9.1   

   

All  Services  shall  be  performed  according  to  the  highest  professional  industrial  standards  and 

shall conform with the requirements of this Contract and shall comply with all applicable laws 
and  regulations.  All  items  and  Services  provided  or  delivered  by  Contractor  to  KARI  or  any 
person  designated  by  KARI  shall  be  sufficient,  correct,  and  complete  to  enable  KARI  or  its 
Subcontractors to perform their work for this contract. 

     

    Contractor  hereby  warrants  the  Services  and  Material  against  deviation  from  the  Contract 

Specifications  and  against  defects  in  workmanship,  material  and  design  when  the  Material  is 
used under normal operation and proper maintenance conditions. Contractor's obligation under 
this  warranty  shall  be  discharged  by  furnishing,  to  KARI's  site  at  Contractor's  expense 
including airfreight, insurance, duties, and taxies for customs clearance in Korea, a similar part 
to  replace  any  of  Contractor's  supply,  or  repairing  the  defective  part  which,  within  the 
Warranty  Period  specified as  under, proves to  have been  defective in  manufacture and design. 
Contractor may at its option inspect the defective part or request the return of defective part at 
Contractor's cost in order to confirm KARI's claim. 

 
9.2 

   

Warranty Period hereof shall be twelve (12) months from the date of Final Acceptance provided 

for in the Article 7.5. 


background image

KARI / ABC Company                                                                                                                  KARI    Proprietary 
 

 
Korea Aerospace Research Institute                                  
9   
 
 

9.3 

     

Such  part  of  the  Material  as  found  defective  and  replaced  or  repaired  shall  have  the  period  of 

warranty  for  replaced  or  repaired  part  of  six(6)  months  renewal  from  the  date  of  replacement 
and repair, if and when the claim for replacement or repair is established and proved during the 
Warranty  Period  as  set  forth  in  the  Article  9.2.  Such  six(6)  months  renewal  of  warranty  shall 
continue in  effect after the termination  of the Warranty  Period  as  set  forth  in  Article 9, but in 
no event shall the Warranty Period be deemed shortened due to such six(6) months renewal. 

 
9.4 

The  warranty  provided  for  in  this  Article  shall  not  apply  to  ordinary  wear  and  tear  or 
consequential damages during the Warranty Period. 

 
9.5 

In  the  event  that  Contractor  does  not  commence  immediately  the  rectification  on  such  proven 
or  admitted  defects  after  receipt  of  notice  from  KARI,  or  does  not  complete  the  said 
rectification  with  reasonable  diligence,  KARI  may,  at  its  option,  correct  the  defects  at 
Contractor's expense. In the latter case, Contractor shall reimburse KARI for all costs incurred 
in  connection  with  KARI's  rectification  of  the  defects  and/or  deficiencies  within  thirty  (30) 
days after receipt of KARI's written invoice setting forth such costs. 

 

9.6    Notwithstanding  anything  contained  herein  elsewhere,  Contractor  shall  indemnify,  defend  and 

hold harmless KARI, its officers, directors, agents and employees from and against any and all 
property and/or personnel losses, injuries, deaths and/or damage arising from the defective part 
or parts of Material. 

 
9.7    Unless  otherwise  specifically  agreed  upon  by  the  Parties,  each  Material  Assembly  including  all 

accessory  materials  and/or  Material  shall  be  treated  as  single  unit  and  Contractor  accepts  total 
overall  responsibility  for  all  components  and  the  coordination  of  such  components  as  a  single 
unit.  The  fact  that  certain  components  are  not  of  Contractor's  manufacture  or  that  Sub-
Contractors  have  been  so  designated  by  KARI  shall  in  no  way  relieve  Contractor  from  full 
responsibility  for  the  entire  supply  of  this  Material.  Contractor  shall  accept  unit  responsibility 
for  the  supply  of  each  Material  Assembly  including  all  accessories  to  the  same  extent  as  if  the 
entire supply of each component were of Contractor's own design and manufacture. 

 
 
Article 10.    Performance & Warranty Bond 
 
10.1  Contractor shall furnish to KARI within three (3) weeks from the date of signing this Contract, 

an  unconditional  and  irrevocable  letter  of  guarantee  issued  by  first  class  international  bank 
acceptable  to  KARI  for  a  sum  equivalent  to  ten  (10)  percent  of  total  Contract  amount.  Such 
letter of guarantee shall be drawn in favour of KARI and advised to KARI through Woori Bank 
(Daejeon Branch at 29 Munye-ro, Seo-Gu, Daejeon, 35241 Korea TEL:042-488-9704, ext. 312) 
and  shall  be  valid  till  the  expiry  date  of  Warranty  Period  provided  for  in  the  Article  9.2  plus 
one(1)  month  thereof.  In  case  Contractor  fails  to  furnish  the  requisite  bank,  then  KARI  may 
have the right to terminate this Contract.   

 
10.2    KARI  shall  have  an  unqualified  option  under  this  guarantee  to  invoke  the  banker's  guarantee 

and  claim  the  amount  thereunder  in  the  event  of  Contractor's  failing  to  honour  any  of  the 
commitments  entered  into  under  this  Contract  and/or  in  respect  of  any  amount  due  from 
Contractor to KARI. 

 
10.3    After  the  Final  Acceptance  by  KARI,  the  above  bank  guarantee  shall  be  considered  to 

constitute  Contractor's  warranty  for  the  Material  delivered  by  Contractor  and  its  due 
performance in accordance with the terms and conditions hereof.   

 
 
Article 11.    Liquidated Damages for Late Shipment 
 
11.1    If the Delivery Dates and Installation/Acceptance Test set forth in Contract Article 3.3 are not 


background image

KARI / ABC Company                                                                                                                  KARI    Proprietary 
 

 
Korea Aerospace Research Institute                                  
10   
 
 

met,  KARI  shall  have  the  right  to  apply  a  liquidated  damages,  not  by  way  of  penalty,  of  zero 
point  two  (0.15)  percent  per  day  of  the  total  Contract  price  unless  such  delay  is  an  event  of 
Force  Majeure,  and  shall  be  deducted  from  the  amount  of  the  Letter  of  Credit  at  negotiation. 
However,  the  amount  of  said  liquidated  damage  shall  not  exceed  ten  (10)  percent  of  the 
Contract price of the Material. 

 
11.2    In the event that the sum of liquidated damages for late shipment as set forth in the Article 3.3 

exceeds  ten  (10)  percent  of  the  Contract  price  of  the  Material  and  the  Material  still  has  not 
been  delivered,  KARI  shall  have  the  option  to  elect  to  come  to  a  new  agreement  with 
Contractor with regard to times of shipment and/or additional liquidated damages, however, the 
liquidated  damages  which  have  accrued  against  Contractor  shall  nevertheless  be  paid  by 
Contractor to KARI. 

 
 
Article 12.    Sub-Contracting 
 
12.1    Contractor  shall  not  sub-contract  any  of  the  works  related  to  manufacture,  assembly  and  sub-

assembly  of  Material  for  major  parts  to  any  third  party  without  KARI's  prior  written  consent 
thereof, provided that KARI shall not unreasonably withhold the sub-contract by Contractor. 

 
12.2    Contractor  shall be  fully  responsible  for  any  sub-contracted  work  to  any  third party  including 

the Sub-Contractors nominated or recommended by KARI. 

 
 
Article 13.    Permits 
 
13.1    For  the  work  to  be  undertaken  by  each  party  pursuant  to  the  provisions  of  this  Contract,  each 

party  shall  obtain,  acquire  and/or  procure  on  its  own  account  all  necessary  permits,  visas, 
certificates and/or licenses required by all applicable laws, regulations, ordinances and/or rules 
of  the  state,  municipality,  territory  or  political  subdivision  where  the  work  pertaining  to  this 
Contract  is  performed  or  required  by  any  other  duly  constituted  public  authority  having 
jurisdiction  over  the  place  where    the  work  pertaining  to  this  Contract  is  performed  and 
further  agree  to  indemnify  the  other  party  from  and  against  any  and  all  liability  and/or  loss 
incurred  by  the  other  party  by  reason  of  asserted  or  established  violation  of  any  such  laws, 
regulations,  ordinances,  rules  and/or  requirements.  However,  each  party  shall  assist  the  other 
party  in  obtaining  such  necessary  permits,  visas,  certificates  and/or  licenses  mentioned  in 
above with a reasonable care. 

13.2    Any failure or delay of Shipment caused by any failure or delay of obtaining permits from all 

the  necessary  Governmental  authorization,  other  than  Korean  Governmental  authorization, 
shall not affect any clause of this contract and Contractor shall take the responsibilities for any 
results from the failure or delay of obtaining any relevant permits or licenses. 

 
 
Article 14.    Confidentiality 
 
Each party shall confidentially treat all documents, data, materials and information supplied by one to 
the other, and shall not disclose the above to any third party, and shall not use the above for any other 
purpose than for the performance of this Contract without prior written consent from the other party. 
However this Confidentiality obligation shall not be apply to the information which is made available 
to the general public. 
 
 
Article 15.    Industrial and/or Intellectual Property Rights 
 
15.1    KARI  acknowledges  and  Contractor  guarantees  that  all  the  Industrial  and/or  Intellectual 

Property Rights related to the Services and Material provided are owned by Contractor.   


background image

KARI / ABC Company                                                                                                                  KARI    Proprietary 
 

 
Korea Aerospace Research Institute                                  
11   
 
 

15.2    Contractor  shall  indemnify  KARI  from  and  against  any  and  all  disputes  or  claims  brought 

forward  by  a  third  party  on  the  ground  that  KARI's  use  of  the  Services  and  Material  supplied 
by Contractor hereunder has infringed any Industrial and/or Intellectual Property Rights of the 
third party. 

 
 
Article 16.    Language 
 
Any and all documents in connection with this Contract shall be made in English. 
However,  when  mutually  agreed  upon  by  the  Parties,  the  documents  may  be  prepared  in  other 
language than English. 
 
 
Article 17.    Taxation 
 
17.1    Any  and  all  duties  and  taxes  including  but  not  limited  to  customs  duties,  income  taxes,  sales 

taxes,  value  added  taxes  and  any  other  tax-like  charges  imposed,  levied  or  charged  to 
Contractor  in  outside  of  Korea  shall  be  for  account  of  Contractor.  Any  other  duties  and  taxes 
imposed, levied or charged in Korea shall be for account of KARI, except the duties and taxies 
regarding the aforesaid Article 7. Inspection and 9. Warranties which are already included into 
total contract amount. 

 
17.2    Any  and  all  charges  including  but  not  limited  to  banking  charges,  cable  charges,  forwarding 

charges and the like to be incurred by each party shall be for account of each party respectively. 

 
 
Article 18.    Title and Lien 
 
18.1    Title  and  risk  of  the  Material  shall  be  passed  to  KARI  by  Contractor  upon  shipment  of  the 

Material by Contractor to KARI. 

 
18.2    Title passed by Contractor to KARI shall be free and clear of any lien, restriction, reservation, 

security interest and/or encumbrance. 

 
 
Article 19.    Notice 
 
Any  and all  notice  to be  given to  either party  shall be  given  to  the  following  addresses by  registered 
airmail or other telecommunication media. Either party may change its address by giving prior notice 
to the other party in the manner provided for herein. 
 
          For KARI      : 
                  COMMERCIAL ITEM                                        TECHNICAL ITEM 
                  Mr. In-Kyu Jeon                                                  Dr. Joon-Tae Yoo     
                  Procurement Team                                              Launcher Structure & Materials Team 
                  Korea Aerospace Research Institute 
                  169-84 Gwahangno, Yuseong-gu, Daejeon, 
                  305-806,Korea 
 
                  Tel : (042) 860-2613                                            Tel : (042) 860-2928 
                  Fax : (042) 860-2666                                             
 
          For Contractor    : 
                XXXX 
 
 


background image

KARI / ABC Company                                                                                                                  KARI    Proprietary 
 

 
Korea Aerospace Research Institute                                  
12   
 
 

Article 20.    Assignment 
 
This  Contract  and  any  right  or  obligation  hereunder  shall  not  be  transferable  or  assignable  by 
Contractor to a third party without the prior written consent of KARI. 
 
 
Article 21.    No Waiver 
 
The  failure  of  KARI  at  any  time  to  exercise  any  of  its  right  hereunder  except  for  rights  specially 
limited  as  to  the  dates  of  exercise  thereof,  shall  not  be,  or  not  be  construed  to  be,  a  waiver  of  such 
rights nor prevent KARI from subsequently asserting or exercising such rights. 
 
 
Article 22.    Force Majeure 
 
22.1    Force Majeure hereunder shall be constructed as follows : 
   

      War,  preparation  for  war,  blockade,  revolution,  insurrection,  mobilization,  civil  commotions, 

riots,  earthquakes,  tidalwaves,  typhoons,  storms,  floods,  or  any  other  conditions  of  similar 
nature beyond reasonable control of the Parties. 

 
22.2    Should  any  event  or  circumstances  of  Force  Majeure  arise  upon  Contractor,  Delivery  Date 

stipulated  in  this  Contract  shall  be  equally  extended  for  a  period  which  such  events  or 
circumstances  will  last  provided  that  notice  is  given  by  the  party  claiming  Force  Majeure  as 
required in Article 22.3. 

 
22.3    Within fourteen(14) days from the date of commencement of events or circumstances that may 

cause any delay in delivery of the Material by Force Majeure on account of which either party 
claims  that  it  is  entitled,  under  the  Contract,  to  any  extension  of  the  time  for  the  performance 
of  the  Contract,  such  party  shall  advise  the  other  in  writing  of  the  date  when  such  delay 
commenced, and the reasons therefore as enumerated in this Contract; likewise, within fourteen 
(14)  days  after  the  delay  ends,  either  party  shall  advise  the  other  in  writing  of  the  date  when 
such delay ended, and shall also specify the redetermined time by which the performance of the 
Contract is to be completed. In case one party fails to acknowledge such notification hereunder 
within fourteen (14) days after receipt thereof, the date of dispatch of notice in writing shall be 
considered the date of notification. 

 
22.4    Force  Majeure  shall  be  established  by  reasonable  written  evidence  of  the  Chamber  of 

Commerce  and  Industry  of  the  country  of  the  party  claiming  Force  Majeure  which  shall 
accompany the written notification of Force Majeure submitted pursuant to Article 22.3. 

 
 
Article 23.    Severability and Enforceability 
 
23.1  If any part or parts of this Contract is or are not effective by any reason whatsoever, the other 

effective parts of this Contract shall not be influenced by such ineffectiveness. In such a case, 
the  Parties  shall  amend,  modify  or  improve  such  an  ineffective  part  or  parts  of  this  Contract 
immediately to make it effective. 

 
23.2    If  any  provision  of  this  Contract  is  held  void  or  unenforceable  subject  to  above  severability, 

the  Parties  hereto  shall  consult  with  each  other  in  good  faith  to  agree  upon  a  remedy  measure 
with  a  view  to  continuing  and  maintaining  this  Contract.  In  case  any  remedial  measure  is  not 
agreed upon by the Parties hereto within three (3) months, this Contract shall become null and 
void, retroactive to the date when the cause thereof was arisen. 

 
 
 


background image

KARI / ABC Company                                                                                                                  KARI    Proprietary 
 

 
Korea Aerospace Research Institute                                  
13   
 
 

Article 24.    Modification, Addition and Amendment 
 
No  modification,  addition  and/or  amendment  in  the  terms  and  conditions  hereof  shall  bind  on  the 
Parties hereto unless these are reduced to writing and duly agreed upon by the Parties hereto. 
 
 
Article 25.    Independent Contractor 
 
Each  party  shall  act  as  an  independent  contractor,  and  neither  party  shall  be  deemed  as  a 
representative, agent, employee or the like of the other party by this Contract. 
 
 
Article 26.    Governing Law and Arbitration 
 
27.1     This Contract shall be construed and governed by the laws of the Republic of Korea. 
 

27.2      Any  disputes, controversies, or differences  which  may  arise between  the Parties, out of or  in 

relation  to  or  in  connection  with  this  Contract  or  for  the  breach  there  of,  shall  be  finally 
settled by arbitration in Seoul, Korea in accordance with the Commercial Arbitration Rules of 
The  Korean  Commercial  Arbitration Board and  under the  Law  of Korea, the  award  rendered 
by the arbitrator(s) shall be final and binding upon both Parties concerned. 

 
 

Article 27.    Termination 
 
27.1 

  KARI may terminate this Contract upon written notice to Contractor: 

 
            (a)  If  Contractor  commits  a  material  breach  of  any  of  its  obligations  under  this  Contract 

which  shall  not  be  remedied  within  thirty  (30)  days  from  the  giving  of  written  notice 
requiring such breach to be remedied; 

 
            (b) If Contractor becomes incapable for a period of one hundred and twenty (120) consecutive 

days of performing any of its obligations under this Contract because of Force Majeure; or 

 
            (c)  If  Contractor  or  its  creditors  or  any  other  eligible  party  shall  file  for  its  liquidation, 

bankruptcy,  receivership,  reorganization,  dissolution  or  similar  proceedings,  or  if 
Contractor is unable to pay any debts as they became due (except debts contested in good 
faith),  or  if  Contractor’s  creditors  have  taken  over  its  management,  or  if  the  relevant 
financial institutions have suspended Contractor’s clearing house privileges, and all such 
events has not been terminated within 30 days from occurrence. 

 
            (d) If the aggregate number of days of delay should exceed one hundred end eighty (180) days, 

excluding days of delay excused by KARI in writing. 

 

In  the  event  of  such  termination,  Contractor  shall  return  to  KARI  all  materials,  data  and 
documentation provided by KARI, at no cost to KARI, and Contractor shall return to KARI all 
the  amounts  received  from  KARI  up  to  the  date  of  such  termination  for  milestones  not 
achieved yet, provided that KARI shall return all Deliverable items provided by Contractor up 
to the date of such termination, in the manner of “as is”. 
 
In the event of the termination pursuant to (a), (c) and (d) above, Contractor shall also pay ten 
percent  (10%)  of  the  Contract  Price  as  termination  charge.  In  such  event,  KARI  shall  be  paid 
with the above 10% of the Contract Price by forfeiting the Performance Bond. 
 

27.2    KARI  may  terminate  this  Contract,  in  whole  or  in  part,  at  any  time  for  its  convenience,  upon 

sixty (60) days prior written notice to Contractor. In case of such termination for convenience, 


background image

KARI / ABC Company                                                                                                                  KARI    Proprietary 
 

 
Korea Aerospace Research Institute                                  
14   
 
 

Contractor  shall  be  entitled  to  the  amount  paid  and  payable  up  to  the  date  of  termination  and 
additional  remuneration  for  all  ‘work  in  process’,  which  in  any  event  shall  not  exceed  the 
Contract Price. 

 

27.3 

  Contractor may terminate this Contract upon written notice to Kari: 

 
            (a)  If  KARI  commits  a  material  breach  of  any  of  its  obligations  under  this  Contract  which 

shall  not  be  remedied  within  thirty  (30)  days  from  the  giving  of  written  notice  requiring 
such breach to be remedied; 

 
            (b)  If  KARI  becomes  incapable  for  a  period  of  one  hundred  and  twenty  (120)  consecutive 

days of performing any of its obligations under this Contract because of Force Majeure; or 

 

            (c) If KARI or its creditors or any other eligible party shall file for its liquidation, bankruptcy, 

receivership,  reorganization,  dissolution  or  similar  proceedings,  or  if  KARI  is  unable  to 
pay  any  debts  as  they  became  due  (except  debts  contested  in  good  faith),  or  if  KARI’s 
creditors  have  taken  over  its  management,  or  if  the  relevant  financial  institutions  have 
suspended  Contractor’s  clearing  house  privileges,  and  all  such  events  has  not  been 
terminated within 30 days from occurrence. 

 
 

Article 28.    Entire Agreement 
 
This Contract represents the entire agreement between the Parties hereto with respect to supply of the 
Material and Services as per the Scope of Supplies specified in contract Specifications and supersedes 
any other agreement or understanding, written or verbal, that the Parties heretofore may have had. No 
modification,  no  future  representation,  promise  or  agreement  shall  be  binding  on  either  party  unless 
made in writing and signed on its behalf by its duly authorized representative. 
 
 

Article 29.    Effective Date 
 
29.1 

  The  effective  date  of  this  Contract(“EDC”)  is  the  date  on  which  all  of  the  following 

conditions have been satisfied: 

(a)    The duly authorized representatives of the Parties have signed this Contract; and 
(b)  The  appropriate  governmental  authorities  of  the  Republic  of  Korea  and  Contractor’s 

country have duly approved this Contract, if required.   

29.2      Any  amendment  to  this  Contract  shall  be  effective  upon  signature  by  the  duly  authorized 

representatives of both Parties and the approval of such amendment by the Government of the 
Republic of Korea, if required. 

 
 
 
 
 
 
 
 
IN  WITNESS  WHEREOF,  the  Parties  hereto  have  executed  this  Contract  in 
duplicate  in  English  by  causing  these  presents  to  be  signed  by  their  duly  authorized 
representatives as of the day and year first above written. 
 
 
 
 
 


background image

KARI / ABC Company                                                                                                                  KARI    Proprietary 
 

 
Korea Aerospace Research Institute                                  
15   
 
 

Signed for and on behalf of KARI             

  Signed for and on behalf of Contractor 

 
 
 
 
 
---------------------------------------------------- 

-------------------------------------------------- 

By      : Korea Aerospace Research Institute                  By      :     
Name

 : GwangRae CHO, Ph.D.         

                    Name

 :     

Title    : President                       

       

                      Title    :         


background image

KARI / ABC Company                                                                                                                  KARI    Proprietary 
 

 
Korea Aerospace Research Institute                                  
16   
 
 

Annex A. 

           

  Offer