PDF문서RFP_Shaker_consulting.pdf

닫기

background image

KARI  PROPRIETARY 

 

Request For Proposal 

for 

Technical Consulting on  

Quad-shaker Vibration System 

 

 

 

November 2014 

 

Space Environment Test Team 

Korea Aerospace Research Institute 

 

169-84 Gwahangno, Yuseong-gu, Daejeon, 305-806, KOREA 

Phone : 82(42)860-2562, Fax : 82(42)860-2234

 

 

 

KARI  PROPRIETARY 


background image

 
 

Request For Proposal 

for 

Technical Consulting on 

Quad-shaker Vibration System  

 
 

 

IMPORTANT 

 

1. This RFP should be kept in confidentiality and should neither 
be copied nor distributed to the third parties. 

 

2. The  questions  and  opinions  on  this  RFP  can  be  asked  or 
suggested  to  Korea  Aerospace  Research  Institute  before 
submission of the proposal. 

 

3. This  RFP  should  be  returned  to  Korea  Aerospace  Research 
Institute with bidder

’s proposal. 

 

4. This  RFP  shall  be  legal  bind  after  the  contract  is  awarded 
unless  the  bidder  explicitly  expresses  the  differences  from  the 
RFP in the compliance sheet. 

 

 

 

November 2014 

 
 

Space Environment Test Team 

 

Korea Aerospace Research Institute 

 

169-84 Gwahangno, Yuseong-gu 

DAEJEON, 305-806, KOREA 

 
 

Phone : 82(42)860-2562, FAX : 82(42)860-2234 

e-mail :acoust@kari.re.kr 


background image

 

 

2014. 11 

 

 
 
 

Space Environment Test Dept. 

Table of Contents 

 

I. 

OVERVIEW ............................................................................................................................. 2 

1. 

OVERVIEW OF THE PROJECT ..................................................................................................... 2 

2. 

REQUISITES OF PARTICIPANTS .................................................................................................. 2 

3. 

SCOPE OF THE WORK ............................................................................................................... 2 

II. 

TECHNICAL REQUIREMENTS ...................................................................................... 4 

1. 

QUAD-SHAKER SYSTEM CONFIGURATION ............................................................................... 4 

2. 

WORK DESCRIPTION ............................................................................................................... 5 

III. 

FORMAT OF PROPOSAL .................................................................................................. 8 

 


background image

 

 

2014. 11 

 

 
 
Technical Consulting on Quad-shaker Vibration System 

2           

Space Environment Test Dept.

 

 

I.  OVERVIEW 

 

1.  Overview of the project 

 

1.1 

Korea Aerospace Research Institute 

(hereinafter referred to as “KARI”) is located 

at Daeduk Research Complex, 140 km south of Seoul. 

 

1.2 

KARI has a satellite assembly, integration and test center (hereinafter referred to 

as “AITC”) for joint use by corporations and research institutes for the purpose of 

the  effective  development  of  domestic  satellites.  And  basic  facilities  and 

equipment for satellite assembly and test have been supplied, installed and used. 

 

1.3 

To  increase  the  vibration  shaker  capability  and  improve  the  accessibility  to 

satellite  for  the  safe  environmental  testing,  new  guided  expander  system  with 

quad shakers will be designed and built. 

 

1.4 

The  purposes  of  this  project  is  to  supply  the  technical  consulting  work  to 

establish the quad-shaker system of vertical configuration 

 

1.5 

All the descriptions in this RFP are minimum requirements and the supplier can 

suggest the better one to improve the overall performance and cost. But in  this 

case,  the  proposal  should  clearly  indicate  the  improvements  from  KARI’s 

requirements. 

 

2.  Requisites of participants 

 

2.1 

The  participants  shall  also  have  experience  of  management,  integration, 

installation and acceptance test for the 3m guided quad-shaker system equipped 

with electro dynamic shakers of 640kN. 

 

3.  Scope of the work 

 

3.1 

The Contractor shall supply the technical consulting work as followings; 

 

  Statement of work and Technical requirements for four-shakers   

  Acceptance test for four-shakers 


background image

 

 

2014. 11 

 

 
 
Technical Consulting on Quad-shaker Vibration System 

3           

Space Environment Test Dept.

 

 

  List of manufacturing Key Inspection points for quad-shakers 

  Acceptance test for overall system 

  FMECA [Failure modes, effects and critical analysis] analysis on similar 

four shakers system 

  Review on shaker supplier proposal 

  Review on quad-shaker design 

 

 

 

 


background image

 

 

2014. 11 

 

 
 
Technical Consulting on Quad-shaker Vibration System 

4           

Space Environment Test Dept.

 

 

II.  Technical Requirements 

 

1.  Quad-shaker System Configuration 

 

To  increase  the  shaker  capability  and  improve  the  accessibility  to  test  object,  new 

guided  expander  system  with  quad  shakers  shall  be  designed.  The  head  expander 

should  be  designed  with  magnesium  material  for  reducing  the  weight.  Seismic  mass 

should be designed to support dynamic load during the vibration test and also supply the 

rigid support and load path for the hydraulic bearings. Quad-shakers should be used to 

increase the capability. Top level of H/E is designed to same level of facility floor.   

 

Figure 1 Concept for Quad-shaker System 

 

Table 1. Technical requirements for Quad-shaker System 

 

 

 


background image

 

 

2014. 11 

 

 
 
Technical Consulting on Quad-shaker Vibration System 

5           

Space Environment Test Dept.

 

 

2.  Work Description 

 

2.1  WP #1 Statement of work and Technical requirements   

for four-shakers 

 

Objective 

To  generate  the  SOW  and  technical  requirements  for  four-

shakers 

Activities 

Generate the statement of work for four shakers 

Generate the technical requirements for shakers 

Generate the Amplifier requirements 

Generate the system requirements 

Generate the maintenance requirements 

Generate the guidelines for preparing statement 

of work   

Outputs 

Documentation on SOW and technical requirements   

Guidelines for preparing SOW 

 

2.2  WP #2 Acceptance test for four-shakers   

 

Objective 

To check the readiness of four-shaker and   

review the results of acceptance test 

Activities 

Generate four shakers acceptance plan on site 

 

Provide acceptance test results of similar system   

Outputs 

Four shakers acceptance test procedure 

Similar four shakers acceptance test result report 

 

 


background image

 

 

2014. 11 

 

 
 
Technical Consulting on Quad-shaker Vibration System 

6           

Space Environment Test Dept.

 

 

2.3  WP  #3  List  of  manufacturing  Key  Inspection  points  for  quad-

shakers 

 

Objective 

To check the Key inspection points for quad-shakers 

Activities 

Generate  the  list  of  manufacturing  key  inspection 

points for shakers 

Outputs 

List of manufacturing key inspection points 

 

 

2.4  WP #4 Acceptance test for overall system in KARI 

 

Objective 

To check the readiness of overall system 

Activities 

Generate  the  list  of  manufacturing  key  inspection 

points for overall system 

Generate  the  overall  system  acceptance  test 

procedure 

Provide similar system acceptance test results report 

Outputs 

Overall system acceptance test procedure 

Similar system acceptance test result report 

 


background image

 

 

2014. 11 

 

 
 
Technical Consulting on Quad-shaker Vibration System 

7           

Space Environment Test Dept.

 

 

 

2.5  WP#5 FMECA analysis on KARI quad-shaker system 

 

Objective 

To check the safety logic for overall system 

Activities 

Provide similar four shakers system FMECA report 

Outputs 

Similar four shaker system FMECA report 

 

2.6  WP#6 Review on shaker supplier proposal 

 

Objective 

To review on shaker supplier proposal 

Activities 

Review the shaker supplier proposal 

Outputs 

Review report on shaker proposal 

 

2.7  WP#7 Review on quad-shaker design 

 

Objective 

To review on quad-shaker design   

Activities 

Review the overall quad-shaker design 

Outputs 

Review report on quad-shaker design 


background image

 

 

2014. 11 

 

 
 
Technical Consulting on Quad-shaker Vibration System 

8           

Space Environment Test Dept.

 

 

 

III. Format of Proposal 

 

The proposal shall consist of 5 Sections (S). 

 

 

S 1      : Bidder's Qualification Document 

 

S 2      : Overview and Technical Proposal 

 

S 3      : Work Schedule Plan 

S 4      : Documentation 

 

S 5      : Price Proposal 

 

The bidder shall present 6 copies of the proposal. A4 or letter size paper shall be used.  The bidder 

is  requested  to  strictly  follow  the  following  illustrated  format  (tabular  form).  This  is  very 

important  to  compare  and  evaluate  different  bidders’  proposal.  Consequently,  disregard  for  this 

rule  may  end  up  with  disqualification.  Also,  well-prepared  and  well-organized  proposal  will  be 

highly  appreciated  and  evaluated.  The  landscape  orientation  will  be  acceptable  for  tables.  The 

suggested  contents  in  each  WP  are  minimum  requirements  and  works  for  reminiscences. 

Ambiguous expression will act adversely to the bidder.   

 

Note : The prices which are used in the proposal to calculate the final total and breakdown prices   

            shall be distinguished from the other prices (e.g. optionally suggested parts by the bidder 

            or KARI, . . . ) by marking a.p. (applied price) after the prices. In other words, the sum of   

            a.p. shall be the final total price proposed in the proposal. 

(example) 

Item 

Price 

Unit 

Subtotal 

Item #1 

$ 5,000 a.p. 

$ 10,000 

Item #2 

$ 4,000 a.p. 

$ 4,000 

Item #3 

$ 2,000 a.p. 

$ 6,000 

 

 

Total 

$ 20,000 

 

 

 

 

 

 


background image

 

 

2014. 11 

 

 
 
Technical Consulting on Quad-shaker Vibration System 

9           

Space Environment Test Dept.

 

 

S1 : Bidder's Qualification Document 

 

The followings shall be included in this WP. 

(a) Bidder's experiences on the prescribed system in this "Request for Proposal" including : 

 

- design/ management/ integration/ installation/ acceptance test 

(b)  Bidder’s  Qualification  Evidence  Documents  to  show  the  capability  to  perform  the  technical 

consultings. 

 

S2 : Overview and Technical Proposal 

 

Concise  and  clear  expression  is  required.  A  long  sentence  should  be  broken  down  into  several 

sentences. Detailed block diagrams, figures and photos are recommended for clear illustration. 

 

The  bidder  should  prepare  tables  for  the  check  list  to  show  the  bidder's  compliance  with  the 

"Request  for  Proposal  [S1  to  S5  in  Work  description]".  The  bidder’s  compliance  list  shall  be 

legal  bind.  This  table  shall  be  located  in  the  front  of  Overview  part.  The  article  numbers  in  the 

"Part  I.  Overview"  and  "Part  II.  Technical  Requirements"  in  the  RFP  should  be  completely 

enumerated in the table. The table format to be followed is as follows: 

 

Check  List  for  "Part  I.  OVERVIEW",  "Part  II.  TECHNICAL  REQUIREMENTS",  “Part  Ⅲ. 

Warranty, 

Maintenance 

and 

other 

Requirement” 

and 

“Part 

Ⅳ 

Terms 

and 

Conditions”(COMPLIANCE LIST

 

ANR 

: Article Number in the Part I and Part II in the RFP 

Y/N 

: Compliance (Yes or No) 

CAP 

: Corresponding Article number in the bidder's Proposal to ANR 

AAM 

:  Article  number  of  Added  Material  in  the  bidder's  proposal  which  is  not  mentioned  in 

this RFP 

(Exemple) 

 

ANR 

Y/N 

CAP 

Remark 

AAM 

Remark 

I-1. 

yes 

I-1.1 

Ditto 

 

 

I-2. 

yes 

I-2.1.1 

Ditto 

 

 

I-2.1. 

yes 

I-2.1.2. 

Ditto 

 

 

…... 

…… 

…… 

 

 

 

II-1. 

yes 

II-1.1 

Ditto 

 

 

II-2. 

yes 

II-2.1.2. 

Ditto 

 

 

II-2.1. 

yes 

II-2.1.3. 

Ditto 

 

 

II-2.1.1. 

yes 

II-2.1.5. 

The  specifications  look  old. 
We updated them 

 

 


background image

 

 

2014. 11 

 

 
 
Technical Consulting on Quad-shaker Vibration System 

10           

Space Environment Test Dept.

 

 

N/A 

N/A 

N/A 

N/A 

II-2.1.4. 

We  currently  developed  a 
new method. 

II-2.1.2. 

yes 

II-2.2.1. 

Ditto 

 

 

 

WP 3 : Work Schedule   

 

The work schedule shall be shown as in detail as possible in chronological way. 

- Table for work schedule 

 

 

WP 4 : Documentation 

 

9.1. Documentation 

 

- document list (contents) to be delivered 

   

 

WP 5 : Price Proposal 

 

8.1.Total price : 

 

All the Price Proposal shall be separately submitted being sealed. 

 

Note :   

The prices which are used in the proposal to calculate the final total and break-down prices shall be 

distinguished from the other prices (e.g. optionally suggested parts by the bidder or KARI, . . . ) by 

marking a.p.(applied price) after the prices. In other words, the sum of a.p. shall be the final total 

price proposed in the proposal. 

The total price is the sum of the break down prices hereafter. 

 

APPENDIX 

1.  General Terms and Conditions