Request For Proposal 

 

 

Launch Service 

For KARI CubeSats

 

 

 

 

 

 

 

 

 

 

25 June 2014 

 

 

 

Korea Aerospace Research Institute 

 

169-84 Gwahangno Yuseong-Gu, Daejeon, 305-806, South Korea 

 

 

 


background image

Commercial In Confidence 

 

RFP 

 

© Copyright all right reserved by KARI 

1. Introduction 

Korea  Aerospace  Research  Institute  (hereinafter  referred  to  as  ‘KARI’),  which  is  funded  by 

government  of  Republic  of  Korea  (hereinafter  referred  to  as  ‘Korea’)  is  now  conducting  CubeSat 

development contest for domestic university students. KARI has a plan to launch the CubSats finally 

selected  in  this  contest  using  launch  service  by  government  fund.  This  Request  For  Proposal 

(hereinafter  referred  to  as  ‘RFP’)  document  provides  information  and  guide  for  the  Bidders  who 

want to provide launch service for KARI. 

2. Statement of Work 

The service of Contractor is to launch the following five (5) CubeSats for KARI and Bidders who 

want to be Contractor should propose launch services for all the five (5) CubeSats. 

2.1. CubeSats to be Launched 

For scientific purpose and new technology demonstration and verification, the CubeSats listed in 

the table 1 below will be launched. 

Table 1. CubeSats to be launched 

No. 

Developer 

Weight 

Size 

Orbit 

Tentative 

Launch date

 

1) 

Korea Aerospace University 

About 4kg 

3U 

Polar Orbit/ 

Sun Synchronous orbit/ 

Altitude: 600~800 km 

Q3-Q4 

2015 

2) 

Yonsei University 

About 4kg 

3U 

3) 

Kyunghee University 

About 3.5kg 

3U 

4) 

Chosun University 

About 1.5kg 

1U 

5) 

Chungnam University 

About 3.5kg 

3U 

※ Total mass of CubeSats can be changed a little bit. 

2.2. Roles of Contractor 

1) Contractor shall launch the CubeSats(refer to section 2.1) with space launch vehicle. The launch 

vehicle and the country where the launch will be performed (hereinafter ‘launch country’) shall 

be  selected  for  the  CubeSats  which  include  ITAR(International  Traffic  in  Arms  Regulations) 

regulated components to be possible to launch. 

2) Contractor shall provide KARI with CubeSat deployers(P-POD or ISI-POD) for protecting and 

separating CubeSats. This includes loan of test deployers to KARI for interface and environment 

test with CubeSats in Korea. 

3) Contractor shall perform all the administrative work for launch, including Export/Import License 

and the authorization of Re-Export License from the United States Department of State based 

on ITAR (from Korea to launch country via the country of Contractor), which shall happen in the 


background image

Commercial In Confidence 

 

RFP 

 

© Copyright all right reserved by KARI 

country of Contractor and the country where the launch shall be performed. 

4) Contractor  shall  perform  integration  and  test  of  CubeSats  with  deployers  in  the  facility  of 

Contractor. 

5) Contractor  shall  perform  the  transportation  of  CubeSats  and  related  equipments  from  the 

facility of Contractor to the launch site where the launch is performed. This includes works of 

Export/Import License, the authorization of Re-Export License based on ITAR and custom work. 

6) Contractor shall dispatch personnel to the launch site in launch and perform work needed for 

launch including overseeing the integration. 

7) Contractor  shall  request  and  receive  timely  and  properly  the  information  (including  the 

information for Re-Export License based on ITAR) which KARI should provide to Contractor. 

2.3. Roles of KARI 

1) KARI shall provide the CubeSats to be launched to Contractor. 

2) KARI shall provide timely and properly the information (including the information for Re-Export 

License based on ITAR) which Contractor requests. 

3) KARI shall provide CubeSats complying with CubeSat standard. 

4) KARI shall perform interface and environment test of CubeSats with the test deployers which 

were loaned by Contractor. 

5) KARI shall transport CubeSats from Korea to the company of Contractor. This includes works 

of export/import license and custom work. 

2.4. Responsibility for exceptions 

Contractor  shall  perform  the  following  items  and  describe  the  reasons  in  detail  on  Proposal  if 

can’t do. 

1) In the case of delay of launch, Contractor shall provide the next launch opportunity without 

the additional payment. 

2) In the case of failure of launch, Contractor shall provide next launch opportunity within two (2) 

years without additional payment. 

3) In the case that scheduled launch may not be performed by the delay of CubeSat development 

of  Korea,  KARI  shall  notify  Contractor  this  fact  of  delay  minimum  six  (6)  months  before  the 

launch  and  Contractor  shall  provide  next  launch  opportunity  within  one  (1)  year  from  the 

notification without additional payment. 

※  In  the  case  that  launch  day  is  changed,  the  date  of  re-launch  shall  be  decided  by  mutual 

agreement between KARI and Contractor. 

※ If Contractor can meet partially the above items depending on specific conditions, Contractor 


background image

Commercial In Confidence 

 

RFP 

 

© Copyright all right reserved by KARI 

should describe the conditions and constraints in the corresponding items in the compliance table 

of Proposal document. For example, time limit for the notification of development delay can be 

described. 

2.5. Payment schedule 

Cost will be paid as the table below and it can be adjusted on mutual agreement at contract. 

Table 2. Payment schedule 

No. 

Milestone 

Price 

Expected date 

1) 

Effective Date of Contract (EDC) 

5 % 

Q1-Q2 2014 

2) 

Launch Reservation 

15 % 

Q2-Q3 2014 

3) 

CubeSats Delivery to Contractor 

40 % 

Q1-Q2 2015 

4) 

After Launch I 

20 % 

Q3-Q4 2015 

5) 

After Launch II 

20 % 

Q1-Q2 2016 

Total 

100 % 

 

In the case that KARI’s budget is insufficient to launch all the CubeSats, Contractor shall launch 

the reduced number of CubeSats correspond to the given budget. In inevitable circumstance the 

payment of the contract can be stopped by KARI’s decision. 

3. Procedure of Bid and Contract 

Procedure from the issue of RFP to the contract will be performed as the following sequences. 

3.1. Issue of RFP 

KARI will inform formally this bid on external procurement system of KARI and post RFP on it. The 

companies which reviewed RFP can ask questions to KARI by e-mail and may inform KARI whether 

the company will prepare Proposal or not. 

3.2. Bidding 

Bidders who want the contract of this service should make a proposal document and submit it to 

KARI by hand-carry or post (one(1) original and seven(7) copies). 

1) Qualification of Bidder 

(1) Bidder shall be manufacturer of launch vehicle or provider of launch service who has Power 

of Attorney established by the manufacturer and notarized by public certificate. 

(2) Bidder  shall  launch  CubeSats  which  includes  United  States  components  obeying  United 

States government export license policy. 

2) Bid bond 


background image

Commercial In Confidence 

 

RFP 

 

© Copyright all right reserved by KARI 

Bid bond is a critical requirement by Korean government regulation. Bidder shall establish a bid 

bond for KARI not later than the Bid Closing Date and submit the certificate to KARI along with 

its proposal. 

(1) The total amount of the bid bond shall be at least five (5) percent of the total bidding price. 

(2) The bond shall remain valid until sixty (60) days after the Bid Closing Date. 

(3) The bid bond shall be in the form of an irrevocable letter of credit established by first class 

bank and advised to KARI through ‘Woori Bank’ (Daejeon Branch at 1495 Dunsan-Dong Seo-

Gu Daejeon, Korea TEL: +82-42-488-9704). 

(4) The bond shall be available by KARI’s draft at sight drawn on the bank, accompanied by the 

statement of KARI stating that Bidder has refused to enter into a contract with the terms and 

conditions in the proposal as amended, if any, that Bidder has hindered the fair bidding by 

fraud or misrepresentation, or that Bidder has withdrawn its proposal after the Bid Closing 

Date. 

(5) The bid bond shall contain the substantial part of the terms and conditions of the bond, 

date of establishment, account, amount, payment terms, and date of expiry, etc. 

(6) The bid bonds of the Bidders who are not selected as candidates of contract will be released 

upon the instructions of KARI without interest promptly after the evaluation of Proposal. The 

bid bonds of the candidates of contract will be likewise released to the corresponding Bidders 

when KARI decides not to enter into a contract with them. 

3) Bid Closing Date : 31 July, 2014, 15:00 Korean Local Time   

4) Submission items 

(1) Proposal (it should be made as the development method in section 4) 

(2) Attachment 1. Quote 

(3) Attachment 2. Certificates for launch service 

(4) From attachment 3, documents in Bidder’s free form can be attached. 

5) Submission address 

Proposal should be sent to the address of section 5 item 1). 

6) Remark   

(1) KARI  does  not  provide  to  the  Bidders  the  cost  (including  preparation,  submittal  and  any 

subsequent clarification or negotiation activities) for the development of Proposal. 

(2) KARI does not have any duty or responsibility for the Proposals submitted. 

(3) Contents of RFP and Proposal should be maintained confidentially. 

(4) The Proposal documents presented by Bidders become the property of KARI and are not 


background image

Commercial In Confidence 

 

RFP 

 

© Copyright all right reserved by KARI 

returned. 

(5) Proposals shall be valid for six(6) months from the Bid Closing Date and upon KARI’s request 

shall be extended for another six(6) months. 

(6) Proposal should be arrived within the bid closing date. 

(7) Bidder may withdraw its Proposal at any time before the Bid Closing Date in writing. 

3.3. Selection of Contractor 

1) KARI will evaluate of its own authority the proposals that Bidders submitted until the due date 

and inform those candidates who may become a Contractor. 

2) According  to  the  priorities  of  contract  candidates,  KARI  with  its  own  authority  will  select  a 

Contractor  by  negotiating  with  the  candidate  of  the  highest  priority  about  the  price  and 

adjustment for the proposed scope of works. 

3) Negotiation with the highest priority shall be conducted in KARI in 15 days. If needed, upto 

another ten (10) days can be expanded. 

4) If the negotiation breaks down with the candidate of the highest priority, KARI will negotiate 

with the next priority of candidates. 

5) Major evaluation factors of RFP are the price, Proposal conformance, launch experiences, launch 

reliability and performance capability. Percentages of evaluation factors are as follows. 

Table 3. Evaluation factors 

Part 

Evaluation factor 

Description 

Percent. 

Technical 

part 

Proposal Conformance 

Conformance of Proposal with RFP 

70 % 

Launch experiences 

Launch  services  experiences  of  CubeSats 

and general satellites and   

Launch reliability 

Launch success rate of launch vehicle and 

launch site 

Performance capability 

Size and awareness of company 

Price Part  Price of service 

Low price of service 

30 % 

Total 

100 % 

3.4. Contract 

1) Expected date for contract : about 1~2 months after bid closing date 


background image

Commercial In Confidence 

 

RFP 

 

© Copyright all right reserved by KARI 

2) This contract follow the Korean laws and the Korean Commercial Arbitration Board in Seoul of 

Korea adjusts dispute if it arises. 

4. Development of Proposal 

1) Bidder should develop Proposal only as the format presented at Attachment 1. 

2) Proposal should use English language and SI units and currency should be expressed in U.S. 

dollars. 

3) As the Attachment 1 of Proposal, Quote should be attached but the detailed items and their 

prices should be described in free format of Bidder. 

4) As the Attachment 2 of Proposal, Certificates for launch service issued from the company of 

launch vehicle should be attached. 

5) Documents which supplement Proposal can be attached in free format of Bidder. The examples 

are as following. 

(1) Company brochure 

(2) Experience and carrier in launch service 

(3) Certificates for government approvals (e.g. export licenses) 

(4) Information(including launch success rate) of Launch vehicles and launch date proposed 

(5) Third Party Liability Insurance Certificate of Launch Vehicle 

(6) Optional services 

(7) Terms and conditions for contract 

5. Contact Information 

In the contact information table below, the person of item 1) is for administration part and the 

persons of item 2) and 3) is for technical part. 

Table 4. Contact information 

No. 

Name 

Position 

E-mail 

Telephone 

Fax. 

1) 

Jeon, In-Kyu 

Senior 

Administrator 

ikjeon@kari.re.kr   

+82-42-

860-2766 

+82-42-

860-2666 

2) 

Han, Sang-hyuk 

Senior 

Researcher 

shan@kari.re.kr 

+82-42-

860-3764 

+82-42-

870-3980 

3) 

Choi, Gi-Hyuk 

Director 

gchoi@kari.re.kr   

+82-42-

860-2217 

+82-42-

870-3980 

 

Table 4. (continued) 

No.

 

Division 

Address 


background image

Commercial In Confidence 

 

RFP 

 

© Copyright all right reserved by KARI 

1) 

Purchasing Team, 
Infrastructure Management Division 

Korea Aerospace Research Center (KARI) 
169-84 Gwahangno, Yuseong-Gu, 
Daejeon, 305-806, South Korea 

2) 

Aerospace Future Technology Team, 
Future Convergence Technology Division, 
Convergence Technology Research 
Laboratory 

3) 

Future Convergence Technology Division, 
Convergence Technology Research 
Laboratory 

6. Attachments 

1) Proposal format 

2) CubeSat contest information brochure 

The end.