General Instructions
for
RPF No. KARI-13-033
February, 2013
Korea Aerospace Research Institute
Bid Instructions
1.
Submittal of Proposal
1.1
Bid Closing Date and Time
The closing time for the Proposal is March 12, 2013, 11:00 Korean Local Time. If any part of
the Proposal as required under this RFP is submitted after the stipulated closing time, the
entire Proposal will be deemed late.
1.2 Method of Proposal Submission
The Proposal shall be hand-carried or sent via appropriate express courier to the following
personnel or his designee within the Bid Closing Date and Time in 1.1.;
Mr. In-Kyu Jeon
Senior administrator of Procurement Team
Korea Aerospace Research Institute
169-84 Gwahangno, Yuseong-gu
Daejeon 305-806, Korea
Tel) +82-42-860-2766, Fax)+82-42-860-2666
E-mail) ikjeon@kari.re.kr
1.3 Point of Contact
The communication between KARI and prospective Bidders for contractual or technical
matters shall be controlled through the following designee:
Mr. In-Kyu Jeon
Senior administrator of Procurement Team
Tel) +82-42-860-2766, Fax)+82-42-860-2666
E-mail) ikjeon@kari.re.kr
Besides the Proposal submission, technical matters can be communicated with following
designee:
Dr. Jong-Hoon Yoon
KSLV Structures & Materials Team
Tel) +82-42-860-2049, Fax)+82-42-860-2233
E-mail) yjh@kari.re.kr
2.
Bidding Schedule
The following schedule is a tentative milestone for the eventual Contract and may be
changed at KARI’s sole discretion:
[1] RFP Release: February 28, 2013
[2] Bid Closing Date: March 12, 2013
[3] Evaluation of Proposal: March, 2013
[4] Contract Negotiation: March, 2013
[5] Contract: March, 2013
3.
Validity of Proposal
The Proposal shall be valid for one (1) year from the Bid Closing Date.
4. Manner for Preparation of Technical Proposal
4.1 Requirements for Bidder
Bidder should be well qualified in terms of the followings.
(1) Bidder should have the history of delivery for spinning machines during the last 5
years.
4.2 Submission of Technical Proposal
4.2.1 Contents
The proposal should be written in English and be clear at a glance. Moreover it should
include the descriptions for the main terminologies. The basic construction of the proposal is
as follows.
(1) Review and opinion about the machine specifications indicated by KARI.
(2) Construction drawings of machine with the detailed description of functions,
specifications, and each part name.
(3) Master plan and schedule for the manufacturing and KARI's requirements.
(4) Plan for inspection and quality warranty.
(5) Training plan for machine operation and maintenance.
(6) Requirements for the installation and plan for machine installation.
(7) Succeeding supporting plan for operation and maintenance after delivery.
(8) 1 copy of software for the design of spinning processes.
(9) 1 hardcopy of user’s manual of the software.
(10) Description on the range of tolerances about dome spinning.
(11) Results of delivered spinning machine (the schematic specifications of the delivered
machines should be indicated)
(12) Price Proposal (to be submitted in a separately sealed envelope) including itemized
price list on machine manufacturing and the other KARI's requirements.
If the submission of the software in (8) is impossible, bidder can demonstrate the software in
making the presentation about the submitted proposal. It is recommended to demonstrate
the software in the presentation rather than to submit it.
4.2.2
Point of Contact
Bidder has to designate the point of contact, and write the name, the formal position,
telephone number, fax number, and e-mail address of the point of contact in the final page of
the proposal.
4.2.3 Requirements for Price Proposal
(1) Price Proposal (to be submitted in a separately sealed envelope)
(3) All prices should be expressed in U.S. dollars or EURO. And the price proposal
should be classified with itemized list. The exchange rate for the evaluation of the
price shall be the first basic rate of Korea Exchange Bank (KEB) of the bid closing
date.
5. Bid Bond
The Bid Bond is a critical requirement by Korean government regulation. Therefore, the
Proposal without Bid Bond will be dropped out in the bidding.
5.1
Amount of Bid Bond
Bidder shall establish a bid bond in favor of KARI not later than the Bid Closing Date and
Time and submit the bond to KARI along with its Proposal. The total amount of the Bid Bond
shall be at least five (5) percent of the total bidding price. The bond shall remain valid until
one (1) year after the bid closing date and if the Bid validity is extended, the Bid Bond shall
also be extended accordingly.
5.2
Bid Bond Establishment Method
The Bid Bond shall be issued by first class international bank in the form of an irrevocable
letter of credit and advised through “Woori Bank” (Daejeon Branch at 1495 Dunsan-dong,
Seo-gu, Daejeon, Korea, Tel:+82-42-488-9704, Ext.313/ Fax:+82-42-488-8913). The bond
shall be available by KARI’s draft at sight drawn on the bank, accompanied by the statement
of KARI stating that Bidder has refused to enter into a contract with the terms and conditions
in the proposal as amended, if any, that Bidder has hindered the fair bidding by fraud or
mispresentation, or that Bidder has withdrawn its Proposal after the Bid Closing Date.
5.3
Bid Bond Return
All of the Bid Bonds will be released promptly at the time of contract award by KARI
without interest.
6.
Questions and Modifications
6.1
Any questions as to the intent and clarity of the RFP may be asked to KARI’s point
of contact as specified in Article 1.3 by email, fax, or letter no later than seven(7)
days before the Bid Closing Date and Time. After the Bid Closing Date and Time,
Bidder shall not amend, Modify, or supplement the Proposal, or submit any other
documents to KARI, except with KARI’s written request.
6.2
KARI may ask each Bidder in writing for clarifications, amendments, revisions,
or supplementation of the Proposal and any other documents submitted by
Bidder at any time before the execution of the Contract. KARI may also ask
each Bidder to submit and supply additional information or documents for
evaluation of the Proposal.
7.
Non Contractual Obligation
7.1
This RFP shall not be interpreted as an offer for a contract or any type of guarantee
by KARI. It is KARI’s sole discretion whether or not to allow the award to any Bidder.
KARI owes no responsibility or obligation to select the Contractor among Bidders.
7.2
This solicitation for the Proposal shall neither be construed to create an obligation on
KARI to enter into a contractual instrument, nor shall it serve as a basis for any claim
for reimbursement of costs for the effort to prepare, submit, amend, revise or
supplement the Proposal, and other related documents expended by Bidder
regardless of whether or not Bidder is successful in receiving an award as a result of
the solicitation.
8.
Acceptance/Rejection of Bids
KARI reserves the right to accept or reject any Bidding, and to amend the Bidding
process and reject all Bidding at any time prior to the award of the Contract without
thereby incurring any liability to the affected Bidder(s), nor is KARI under any obligation
to inform the affected Bidder(s) of the ground for its action.
9.
Selection of Successful Bidder
9.1
Proposal submitted by Bidders will be evaluated based on evaluation process.
9.2
Technology Evaluation
Technology evaluation is carried out on the basis of Table 1. The perfect score of the
evaluation is equal to 100. In order to pass, bidder has to get a score of 80 in the technology
evaluation.
All bidders should make a presentation about his or her technology according to KARI’s
designation. And evaluation committee is going to be organized with inside and outside
experts on design and manufacturing.
Table 1. Itemized list for technology evaluation
Major Classification
Detail Classification
Manufacturing Career
and Capability of Project
Performance
- History of delivery of heavy duty spinning machines
- Manufacturing and delivery schedule, milestone Chart
Design and
Manufacturing Capability
- Propriety of machine composition or construction
- Details, consistency and system of proposal
- Propriety of manufacturing method
- Satisfaction of major specification
Software for Spinning
Process Design
- Construction of user friendly environment (Easiness for access,
operation, and programming)
- Functions of software
- Data transformability
Inspection/Test and
Capability of Quality
Warranty
- Detailed contents and time schedule of pre-acceptance test
and final acceptance test
- Detailed method of quality warranty and performance contents &
plan of quality warranty
- Supporting method and master plan for the machine operation
and maintenance
9.3
The Successful Bidder will be selected by the evaluation committee among the
Bidders after the evaluation of the Proposals. Any Bidders shall not raise any
objection regarding the proposal evaluation committee’s decision thereupon.
9.4
If KARI and the Successful Bidder fail to agree on the terms and conditions for the
eventual Contract, KARI may terminate the contract negotiation with the bidder
without any responsibility or obligation and proceed to have a re-biding.
10.
Contract
The Contract will be effective subject to the KARI’s approval thereof. The Draft Terms
and Conditions as attached in Appendix A. are the baseline requirement for the
Contract negotiation with the Successful Bidder, and will be the basis of the Contract.
11.
Language
All documents should be written in English and unit system for measurement should be SI
unit. But the item (11) in 4.2.1 is allowed to write in different language.
12.
Certificate and Government Approvals
Bidder shall receive the government approval and certificates (e.g. export licenses) in
relevant countries, necessary for Bidder’s work for the RFP.
13.
Confidentiality
There shall be no news release, public announcements, denials or confirmation in
connection with this RFP or Contract award without the prior written approval of KARI. All
documentation submitted in response to this RFP shall be marked “COMMERCIALS-IN-
CONFIDENCE” on the first page of each document. All elements of the RFP shall be kept
confidential, and shall not be intentionally disclosed by Bidder to any Third Party.
14.
Withdrawal of Proposal
Bidder may withdraw its Proposal at any time before the Bid Closing Date and Time.
Withdrawal shall be made in writing, and shall be received by KARI before the Bid Closing
Date and Time.
15.
Property of Proposal
All documents submitted in response to the RFP shall become the property of KARI and will
be retained by KARI.
16.
Expenses
Expenses incurred by Bidder in connection with the preparation, submittal, and any
subsequent clarification or negotiation activities are for its own account and will not be
reimbursed by KARI.
17.
Governing Law
This RFP and the Contract shall be construed in accordance with and governed by the laws
of the Republic of Korea.
18.
Arbitration
Any disputes in relation to, and under the RFP and the Contract shall be resolved through
arbitration in Seoul, Korea under the Rules of the Korean Commercial Arbitration Board.
Appendix A.
Terms and Conditions
Refer to Appendix A.
Appendix B.
Statement of Non-compliance Table
KARI’s General Terms & Conditions
Bidder’s sales
standard
Deviation
Article No.
Description