PPT문서5._CubeSat_contest.pptx

닫기

background image

2012,2013 Cubesat Contest : Uni-

versity Cube Satellites Mission 

and Design Contest in Korea 

2013. 9.

Korea Aerospace Research Institute (KARI)


background image

IAC 2013

Contents

 Introduction  of Cubesat Contest 
 2012 Cubesat Contest

 1st, 2nd Education Program
 1st, 2nd Contest Program
 Finally Selected Missions

 2013 Cubesat Contest

 1st, 2nd Education Program
 1st, 2nd Contest Program
 Finally Selected Missions

 Conclusion and Future Schedule


background image

Introduction of Cubesat Contest(1/2)

 In 2012 and 2012, Korean Aerospace Research Institute (KARI) held 

the CubeSat contests

 『2012 Cubesat Contest』: 2012 August. 17 ~ 2014. July
 『2013 Cubesat Contest』: 2013. April. 9 ~ 2015. March

 Purpose of the contest

 Provide undergraduate and graduate students with  opportunities for hands-

on experience in satellite development

 Promote interest of general public in space technology

 Programs

 Education Program : two workshops: lectures given by experienced 

satellite engineers from KARI, Universities and Industries

 Contest Program : conducting in two stages during summer vacation
 Cubesat Development program : provide development cost, tech-

nical support of cubesat development and space environment test 
and launch service for the selected missions

IAC 2013


background image

Introduction of Cubesat Contest(2/2)

 1st, 2nd Contest Evaluation Criteria

IAC 2013

Evaluation Criteria

Weight

1st Round

(Mission idea)

Scientific and Technical Mission Design

40%

System Design

2nd Round

(Technical Implemen-

tation)

CubeSat Design

60%

Space Environment Test Plan

Launch and Operation Plan

Total

100%


background image

『2012 Cubesat Contest』

IAC 2013


background image

Schedule

IAC 2013

Phase

Contents

Results

workshops

2012.Aug.17

~

Oct.31

∙

( Aug.17)  Contest announcement

∙

( Sep.20) 1st Education Workshop

∙

(Oct.31)  2nd Education Workshop

Participation by 23 
teams (17 universities) 

Contest

2012.Dec.7

1st Round
∙

(Nov.31)  Proposal Submission

∙

(Dec. 7)   Presentation

Participation by 17 
teams (13 universities)
Selection of 6 teams

2013.Feb.15

2nd Round
∙

(Feb. 8) Proposal Submission

∙

(Feb.15) Presentation

Participation by 6 1st 

round winners

Selection of 3 teams

Cubesat

Development

2013.Mar.

~

2014.July

Development of proposed missions

-


background image

1st, 2nd Education Program

 1st Education Workshop 

(‘12.Sep.20)

 Location : KARI  
 Lectures on basics of satellite de-

sign by KARI engineers

 Over 120 participants: under-

graduate & graduate students, 
professors

IAC 2013

 2nd Education Workshop
     (‘12.Oct.31)

 Lectures on CubeSat design and de-

velopment

 Introduction of 1st Contest
 Over 120 participants: undergraduate 

& graduate students, professors


background image

1st, 2nd Contest Program

 1st Round (‘12.Dec.7)

 Evaluate Scientific/Technical Mis-

sion & System Design

 23 teams applied
 6 teams were selected

IAC 2013

 2nd Round (‘13. Feb.15)

 Evaluate technical feasibility 

& implementation plan

 3 teams were selected and 

awarded development fund

• KAIST, Yonsei Univ, Korea 

Aerospace Univ.


background image

Selected Missions (1/3)

 KAIST(2U); * will be launched by QB50(von-Karman 

Institute) in ‘16

 participate in QB50 program
 QB50: measurement of low ionosphere/thermosphere using 50 

CubeSats

 on this CubeSat, Langmuir probe will conduct a simultaneous 

measurement with ion neutral mass spectrometer

IAC 2013

Ion neutral mass spectrometer

Langmuir Probe


background image

 Yonsei Univ.(3U)

 build a detector spacecraft of the two spacecraft that constitute a 

virtual telescope (optics spacecraft to be developed by MIT)

 involves challenging technologies: attitude control & formation 

flying

IAC 2013

Selected Missions (2/3)


background image

 Korea Aerospace Univ.(3U)

 payload: dual band infrared camera (3 – 5 mm):

• Medium Wave IR, Long Wave IR

 Observe thermal images of the Earth

IAC 2013

Selected Missions (3/3)


background image

『2013 Cubesat Contest』

IAC 2013


background image

Schedule

IAC 2013

Phase

Contents

Results

workshops

2013.Apr.9

~

May.30

∙

( Apr.9)  Contest announcement

∙

( May.14) 1st Education Workshop

∙

(Jun.20)  2nd Education Workshop

Participation by 10 
teams (8 universities) 

Contest

2013.Jul.4

1st Round
∙

(Jul.3)  Proposal Submission

∙

(Jul.4)   Presentation

Participation by 9 
teams (10 universities)
Selection of 6 teams

2013.Sep.12

2nd Round
∙

(Sep. 11) Proposal Submission

∙

(Sep.12) Presentation

Participation by 6 1st 

round winners

Selection of 3 teams

Cubesat

Development

2013.Oct.

~

2015.Feb

Development of proposed missions

-


background image

1st, 2nd Education Program

 1st Education Workshop 

(‘13.May.14)

 Location : KARI  
 Lectures on basics of satellite de-

sign by KARI engineers

 Over 100 participants: under-

graduate & graduate students, 
professors

IAC 2013

 2nd Education Workshop
     (‘13.Jun.20)

 Lectures on CubeSat mission, design 

 

 2012 selected team’s cubesat design
 Over 65 participants: undergraduate 

& graduate students, professors


background image

1st, 2nd Contest Program

 1st Round (‘13.Jul.4)

 Evaluate Scientific/Technical Mis-

sion & System Design

 23 teams applied
 6 teams were selected

IAC 2013

 2nd Round(‘13. Sep.12)

 Evaluate technical feasibility & 

implementation plan

 3 teams were selected and 

awarded development fund

• Kyunghee Univ., Chosun 

Univ.,  Chungnam univ.


background image

Selected Missions (1/3)

 Kyunghee Univ.(3U)

 Payload : Space Radiation Probe and Magnetometer
 on this CubeSat, evaluate biologic effects of space radiation

IAC 2013


background image

 Chosun Univ.(1U)

 payload : MEMS thruster, variable emittance radiator, pulsation 

flexible heat pipe

 investigate core space technology for using as payloads from in-

dustry, university, research institute and verify nano-satellite 
technology

IAC 2013

Selected Missions (2/3)


background image

 Chungnam Univ.(3U)

 payload: solar-sail 
 develop solar-sail and deploy mechanism and verify them in 

LEO(Low Earch Orbit)

IAC 2013

Selected Missions (3/3)


background image

Conclusion

 6 Cubesat Teams finally is selected from Cubesat 

Contest

 3 teams from『2012 Cubesat Contest』and 3 teams from 

『2013 Cubesat Contest』

• 1 team of these will be launched by QB50 program

 these teams is developing their cubesats,

• 2012 cubesat developing teams is scheduled for 2014. Jul.
• 2013 cubesat developing teams is scheduled for 2015. Feb.

 Future Plans『2013 Cubesat Contest』

 Select Launch Rocket and fix Launch Schedule

• launch schedule : All 5 Cubesats in Q3/Q4 of 2015 

IAC 2013